Construction Site Management - WBS, Project Schedule, Safe Work Method Statement
Added on 2023-06-04
8 Pages611 Words381 Views
Running head: CONSTRUCTION SITE MANAGEMENT
Construction Site Management ENS5112
Student Name:
University Name:
Construction Site Management ENS5112
Student Name:
University Name:
1CONSTRUCTION SITE MANAGEMENT
Table of Contents
Task 1 – WBS and Project Schedule....................................................................................................2
1.1 WBS (Work Breakdown Structure) for construction of the western abutment.........................2
1.2 Schedule for the construction of the central pier for the bridge.................................................2
1.2.1 Gantt chart for construction.................................................................................................2
1.2.2 Baselined Gantt chart..........................................................................................................3
1.2.3 Cost overview dashboard....................................................................................................4
1.2.4 Logical explanation for the construction.............................................................................4
Task 2 - Safe Work Method Statement................................................................................................5
Bibliography.........................................................................................................................................6
Table of Contents
Task 1 – WBS and Project Schedule....................................................................................................2
1.1 WBS (Work Breakdown Structure) for construction of the western abutment.........................2
1.2 Schedule for the construction of the central pier for the bridge.................................................2
1.2.1 Gantt chart for construction.................................................................................................2
1.2.2 Baselined Gantt chart..........................................................................................................3
1.2.3 Cost overview dashboard....................................................................................................4
1.2.4 Logical explanation for the construction.............................................................................4
Task 2 - Safe Work Method Statement................................................................................................5
Bibliography.........................................................................................................................................6
2CONSTRUCTION SITE MANAGEMENT
Task 1 – WBS and Project Schedule
1.1 WBS (Work Breakdown Structure) for construction of the western abutment
0. Construction of the
western abutment
1. Pour footing
1.1 Pour concrete
2. Prepare and pour wall
2.1 Removal of
formwork
2.2 Concrete curing
2.3 Bridge bearing
installation
2.4 Form connector
at top of abutment
2.5 Fixing of bridge
joints
3. Backfill behind
Abutment
3.1 Deciding the
option for backfill
3.2 Backfilling
3.3 Compaction of
backfill
3.4 Field test
4. Traffic control
4.1 Rerouting the
traffic on existing
road
Task 1 – WBS and Project Schedule
1.1 WBS (Work Breakdown Structure) for construction of the western abutment
0. Construction of the
western abutment
1. Pour footing
1.1 Pour concrete
2. Prepare and pour wall
2.1 Removal of
formwork
2.2 Concrete curing
2.3 Bridge bearing
installation
2.4 Form connector
at top of abutment
2.5 Fixing of bridge
joints
3. Backfill behind
Abutment
3.1 Deciding the
option for backfill
3.2 Backfilling
3.3 Compaction of
backfill
3.4 Field test
4. Traffic control
4.1 Rerouting the
traffic on existing
road
End of preview
Want to access all the pages? Upload your documents or become a member.
Related Documents
Assignment about What Do You Mean Project Management?lg...
|5
|503
|18