Contract and Procurement Management for Royal Victorian Eye and Ear Hospital
Verified
Added on ย 2023/06/07
|14
|3975
|267
AI Summary
This report focuses on the contract and procurement management for the Royal Victorian Eye and Ear Hospital redevelopment project. It includes procurement strategy, procurement routes, contract types, and risks associated with proposed routes and contract types.
Contribute Materials
Your contribution can guide someoneโs learning journey. Share your
documents today.
Contract and Procurement Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 MAIN BODY..................................................................................................................................3 Procurement Strategy.......................................................................................................................3 Map the factors and characteristics for the project with the factor for the best procurement strategy.........................................................................................................................................3 Procurement Routes.........................................................................................................................5 Casestudyrequirementsalongwithconstraints,givens,exclusions,assumptionsand limitations....................................................................................................................................5 Most appropriate route for each sub โ project and why they are suitable...................................6 Addressing group of factors including but not limited to following cost quality, project schedule.......................................................................................................................................6 Contract Types.................................................................................................................................7 Risk Associated with Proposed Routes and Contract Types...........................................................8 Budget............................................................................................................................................10 CONCLUSION..............................................................................................................................11 REFERENCES................................................................................................................................1
INTRODUCTION Contract and procurement management refers to strategic procedure of managing a contract such as building a new infrastructure, outlet, etc. that helps to maximize financial as well as operational performance of an organization (รzkan, Azizi and Haass, 2021). The current assessment will be based on Royal Victorian Eye and Ear hospital, which falls under the category of leading health care organizations in the world. The aim of current report is to map the characteristics and factors of project with consideration for the best procurement tactic. It will also specify the procurement routes, including constraints, assumptions and limitations. Furthermore, the study will specify appropriate route for each project and why it is suitable to make work successful. Lastly, the report will clarify the contract types for each sub project along with justification based on procurement routes. It will also address a group of forces, but not limited to cost, quality, and project schedule. MAIN BODY Procurement Strategy Map the factors and characteristics for the project with the factor for the best procurement strategy The basis of the case study is analysed as how effectively and in appropriate manner the case is being analysed and is described. The Royal Victorian Eye and Ear Hospital Redevelopment is the priority based infrastructure project which is being served for the demands and services to be provided to the people (Schenk, 2022).The more service opportunities are made available for the people concerning by providence of operating rooms, additional overnight stay ward, operating rooms, recovery spaces etc. The project has several stages which are being described in appropriate manner and these are analysed and noted regarding the different stages of the project which are โ ๏ทStage1includesdevelopmentoftheprojectplansincludingscope,budget, communication plan, risk management plan, detailed design plan etc. ๏ทStage 2 of the project includes operating rooms, recovery spaces, beds, construction of buildings etc. ๏ทStage 3 includes completion of the emergency department.
๏ทStage 4 includes completion of outpatient consulting rooms and handing it over to the government authority (de Oliveira, Lopes and Abreu, 2021). These are some of the major stages which are included within the report and this helps in understanding the concerns related to growth and redevelopment of the Hospital in appropriate and significant manner. For further analysis, it is depicted that the factors are being analysed for understanding how the redevelopment is being done in appropriate manner. The key factors which are to be noted is that the major construction of the hospital redevelopment was started in October 2018 and is planned to be completed and is planned to be completed for operation in April 2023 (Young and et.al., 2019).Apart from this, there are major key factors which are analysed and are identified for considering the project scopes and the main constraints through which the project is being hindered. Along with this, there are some major characteristics which are identified and are concerning the redevelopment of the hospital in appropriate manner. These characteristics are mentioned as โ ๏ทPatient Care and Comfort โThe 13 cubicle emergency department is designed to use advanced technology in appropriate manner. This helps in knowing that better services are provided to the patients to urgent ophthalmology and ear, nose and throat services so that they recover soon and this helps in knowing the concerns regarding the better facilities which are made available to them. ๏ทAccessibility Improvisation โThe redevelopment in the hospital helps in making and ensuring the concerns regarding the redevelopment by consolidating the patient clinical services on the lower three floors of the building. This helps in improving the navigation of the patients and providing connections between the hospital towers in significant manner (Windapo, Olugboyega and Odediran, 2020). ๏ทDeveloping Environmental Sustainable Designs โBy linking the bridges which are designed which helps in providing the increased natural light in appropriate manner at large scale. These are some major characteristics which are being denoted and are addressed by considering the privileges which will be provided to the patients and the services which will be provided and initiated for facilitating the patients at large scale. The factor to be considered for the best procurement strategy is improving accessibility. This factor will help in analysing and creating value for providing the facilities to the patients in signified and appropriate manner. By fulfilling
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
the needs and demands of the patients the clinical facilities will be provided to the patients and they will be able to inculcate the facilities regarding the services specifically the clinical services and facilities to be provided to them (Greenhalgh, Squires and Mahamadu, 2021).This factor is analysed for considering the aspects related to improvement which is done in accessing the facilities and services at large scale. The navigation provided to the patients is the positive aspect which is related to creating value for the redevelopment of the hospital building in effective and significant manner. Procurement Routes Case study requirements along with constraints, givens, exclusions, assumptions and limitations The case study requirements which are being identified for The Royal Victorian Eye and Ear Hospital Redevelopment are โ Requirements - ๏ท37 beds and chairs on the same day. ๏ท15 overnight say inpatient beds. ๏ทFuture significant expansion space. ๏ทImproved training, research and teaching facilities to be consolidates in the upper levels of the building. ๏ทNew 13 โ cubicle department for emergency (Elhag, Eapen and Ballal, 2019). ๏ทSeven operating rooms and 13 recovery spaces located on one floor. These are some of the major requirements which are being identified and services which are to be provided to the patients. Along with this, there are some major constraints which are identified as โ Constraints โThese constraints are mentioned as โ Sub โ Project 1 โForm completion date and high quality are the major priorities Sub โ Project 2 โQuality should be optimised as it is the top priority. Sub โ Project 3 โFixed costs and schedule achievement should be achieved. Along with this, there are some givens which are mentioned as โ Givens โ ๏ทThe project ongoing operations must comply with the relevant regulations and best practice standards and construction safety regulations (Gottschling, 2018).
๏ทContractor can start construction work on sub โ project 1 when 30% of the civil work design is completed. ๏ทThe variations in technology must be allowed in sub โ project 2. ๏ทThe contractors have to plan services according to the impacts of the construction works so that the noise and vibrations are managed in the hospital. ๏ทNo variations must be allowed only changes in the sub โ project 1. Assumptions โ ๏ทThe assessment for environment has already been completed fort the project which is ongoing. ๏ทNo change in the rules and regulations of local and state government. ๏ทCommunication and ongoing engagement process with the stakeholders which includes the community leaders at large scale (Hu and Chong, 2020). Most appropriate route for each sub โ project and why they are suitable The most appropriate route for each โ project is identified and mentioned as โ ๏ทFor sub project 1 the procurement route is identified and is categorized as โ contractor can start the construction on this project when at least 30% of the civil work design is completed. ๏ทFor sub project 2 the procurement route is identified as โ for sub project 2 the spaces of the building are important to be completed and this signifies the concerns related to completing this project (Shehu, Ibrahim and Inuwa, 2019). ๏ทFor sub project 3 the procurement route is signified as โ The project must comply with relevant regulations and best practices for constructing the safety regulations. They are suitable for redevelopment of The Royal Victorian Eye and Ear Hospital and this will help in initiating the concerns regarding the redevelopment of the hospital in signified manner. Addressing group of factors including but not limited to following cost quality, project schedule The group of factors which are included but are not limited to following cost quality, time, project schedule is being identified in appropriate manner. The group of factors are identified as โ time, cost of the project, quality of the services in appropriate manner. Apart from this, there are different factors which are being identified and these are concerned as โ communication,
project completion timings, cost of the project in appropriate manner. For completing the project there are concerns related to addressing how the completion is being addressed within the positive and negative aspects at large scale. These factors are important to address and create value for the concerns which helps in denoting the positive and negative concerns at large scale. This is the major aspect which is denoted as concerning the project of the redevelopment to be completed in an appropriate manner (Ashworth and Perera, 2018). These are some of the factors which are being analysed and are managed by addressing the completion of the project in appropriate and significant manner at large scale. Contract Types The Royal Victorian eye and ear hospital focus on redevelopment of their infrastructure, in term of developing plans related to three major projects such as construction of building, operations rooms, completion of emergency department and completion of outpatient rooms as well as all other functions. In the case of first project,Cost plus contract,is suitable because the project contractor provides a budget to the organization in which actual cost of overall project, including materials, labour, and unpredictable expenses are added (Every Type of Contract You Could Ever Possibly Encounter,2020).Thecurrentformofcontractisalsoincludedincategoryofcost- reimbursement contracts, which are suitable for a specific or varied situations such as when buyers agree to pay the final cost of a project such as completion of building and operations rooms as well as all civil works. In the context of first project, a specific procurement route has taken, according to which contractor can only begin their work when at least 30% of civil work design is complete (What is a Cost Plus Contract? Advantages and Disadvantages,2021). Cost plus contract include the estimate of overall amount related to resources. It will satisfy the main points in appropriate manner and these are cost, time, and quality. In regard to project two,Fixed price contractis appropriate, according to which payment does not rely on key assets that utilized or time expended. This project is related to completion of emergency department for which management do not need to make any additional changesorrequirement.Foremergencydepartmentcontractorcanmakeappropriate assumptions and then fixed the price, according to which they can start their work once some space or area of project is ready. It is fact that proposed contract type will satisfy the main
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
elements of work based on key priorities in the project constraints specify above. It helps to deliver the project and complete the same according time line that has been decided by the management. It is fact that the fixed price contract, will enable contractor to work well and delivery the quality through the same, which is essential for them to do that. It will enable them toappropriatelyestimatesumallowablecostsoflabourandrawmaterialsthatrequire developing emergency department in the premise that help to cure patientsโ health issues, related to ear and eye appropriately. In the contextof third project,time and materialscontractis relevantbecause outpatient rooms and all other functions development or completion is based on time and assets that require to complete the same work. The current form of contract is like a cost plus contract, but still quite different or might be more straightforward that is good for a contractor and company, who provide the project to them. In these information, hospital authority can pay contractor for the time they spend and efforts put to complete the work as well as resources in term of raw material used to achieve and provide desire results. It is fact that the time and materials contract is used in situation where it is not possible to assume or estimate the size of work or when requirement for completion are predicted to modify in appropriate way, that provide expect and satisfactory results. It will consider all the main points related to project and delivery on time, without delay. Risk Associated with Proposed Routes and Contract Types While producing a project and selecting route related to that, management faced number of issues, due to risks associated with these two practices, and these are mentioned below. Each risk present in form of table. Risks include with contract types Risks description and their impact Inabilitytoappropriately forecastprojectcostsand More charges. The current risk is associated with fixed price contract, and occur if any change order is needed and the project is not completed at a lower than predicted costs that's where issue might be occurred, in term of risk (Bravo, 2022). It will put negative impact on completion of building, operating rooms
and other civil works in the organization. Another risk that also associated with the current type of contract is more charges that may lead to increase demand of additional amount, over than the decided or fixed budget. It will impact both the contractor and hospital authority as well, in negative manner. Leadtolongertimelineof projectandtotalcostis uncertain Along with above type of contract, there are two risks also associated with cost plus contract. It encompasses risk of taking longer time in the context of project completion and contractor as well as organization is unable to predict total cost that affect the overall work. Failure and delayIn the context of time and materials contract, two different types of risks are associated such as current. Both types of risks areputtingimpactonownerandcontractor,intermof increasingpressure.Thecurrentcategoryofcontract, encompasses some issues or risks such as failure. This risk occurs when final cost is unclear and individuals have less understanding related to that. Therefore, it also becomes the reason of project delivery delay. Risks associated with proposed contract routes Necessary planned responses for each sub project Lack of clarityWith selection of any route, either one or two, or three, there are some risks associated. When contractor start the work, if 30 percent of civil work design is complete, it creates an issue for them and that is lack of clarity, because the selected percent of work is not suitable to proceed further with a major project in which different things would be done (ZHANG and LIN, 2018). In the context of project 1, it would be recommended that contractor can start their work after completion of 40 percent civil work design, which specify the activities that they
accountable to taken and also clarify others to do the same. Sudden changes requireAnother risk that associated with project procurement contract route two is current one, which occurs when the requirement related to change emerge and impact the productivity of project planning and other activities. Forecasting is the best response in the context of sub-project, which drive the attention of management toward forecasting some major or minor changes that will affect the continuation of project work negatively. The best thing about this response is that it help to eliminate maximumlevelofriskoccurrencethataffecttheway management, high authority and contract perform or work. Regulatory changesIn regard to third procurement route, regulatory change is the main risk that encompasses in the project third. This risk is quite challenging for the hospital authority and contractor to overcomeinappropriatemanner.Thebestresponsethat stakeholders can do in the context of risk is developing a session, during which they make an important discussion, with each team members, contractor and other stakeholders who are engaged in all three projects and also accountable to meet the others needs in appropriate and satisfactory manner. With the current response form, they can work well and in ethical manner, which is essential for everyone to do that. Budget There are cost estimations which are identified as important to be considered within the circumstances related to the budget formation and calculation in appropriate and significant manner (Frieze, Krivelevich and Michaeli, 2022).The budget is framed to be analysed by understanding the concerns related to how effectively the specific percentage is being drawn upon and the presumed income and expenses are being drawn for concerning the aspects related
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
to addressing the profits and growth of the projects which is being undertaken in appropriate manner. The budget is being explained here with all the essential requirements in appropriate manner and this helps in signifying the concerns related to including the essential and major key concerns in appropriate and significant manner. The budget has been prepared of Sub โ Project 1 which concerns the construction of buildings, operating rooms and all civil works. This is how the budget has been prepared in appropriate manner which helps in signifying the aspects related to creating value for the amount which is of total $50 million. The budget is explained as below โ ParticularsAmount ($ in millions) Raw Material$10 Labour Costs$7 Equipment Costs$8 Transportation Costs$5 Land and Building$20 Total$50 million CONCLUSION Onthebasisofabovediscussion,ithasbeenconcludedthatriskanalysisand identificationhasimprovedtheperformanceoforganization,intermofdevelopingthe appropriate project plans that helped to deliver all three projects successfully. Management has taken the pleasure of obtaining quality in their work and completing operating rooms as well as other functions, by selecting and then using the best routes. Furthermore, by summing up above analysis, it has been summarized that selection of appropriate contract has enabled contractor to deliver their best work by following the sustainable and ethical practices, which they are accountable to taken into their consideration. The implementation of strategic strategy has allowed organization to reach desire outcomes, as it had achieved the goals and objectives. Moreover, high authority has completed their work according to developed budget that enables
them to move ahead and toward enhancing patients satisfactory level, especially when they reach to the hospital.
REFERENCES Books and Journals Ashworth,A.andPerera,S.,2018.Contractualproceduresintheconstructionindustry. Routledge. Bravo, J. M., 2022. Pricing participating longevity-linked life annuities: A Bayesian Model Ensemble approach.European Actuarial Journal.12(1). pp.125-159. de Oliveira, R.A., Lopes, J. and Abreu, M.I., 2021. Insights from a project procurement strategy through an action research.Procedia Computer Science.181. pp.1002-1010. Elhag, T., Eapen, S. and Ballal, T., 2019. Moderating claims and disputes through collaborative procurement.Construction Innovation. Frieze,A.,Krivelevich,M.andMichaeli,P.,2022.Fastconstructiononarestricted budget.arXiv preprint arXiv:2207.07251. Gottschling, P., 2018. Architectural scripts: construction procurement within the user worlds of building events.Social & Cultural Geography.19(5). pp.626-646. Greenhalgh, B., Squires, G. and Mahamadu, A.M., 2021.Construction Procurement: Complex Property Development. Routledge. Guo, L and et.al., 2021. A blockchain-driven electronic contract management system for commodity procurement in electronic power industry.Ieee Access. 9. pp.9473-9480. Hu, X. and Chong, H.Y., 2020. Integrated frameworks of construction procurement systems for off-sitemanufacturingprojects:socialnetworkanalysis.InternationalJournalof Construction Management. pp.1-9. รzkan, E., Azizi, N. and Haass, O., 2021. Leveraging smart contract in project procurement through dlt to gain sustainable competitive advantages.Sustainability. 13(23). p.13380. Schenk, D., 2022. Roadmap for the Development of a Procurement Strategy in a Construction Company. Shehu, A.S., Ibrahim, Y. and Inuwa, I.I., 2019, October. Knowledge requirement theoretical frameworkforconstructionprocurementmanagement.InIOPConferenceSeries: Materials Science and Engineering(Vol. 615, No. 1, p. 012027). IOP Publishing. Windapo, A.O., Olugboyega, O. and Odediran, S., 2020. Impacts of procurement strategies on constructionSMEsโgrowth.JournalofFinancialManagementofPropertyand Construction. Young, B. and et.al., 2019. Driving Construction Health and Safety Through Procurement Strategy.Association of Researchers in Construction Safety, Health, and Well-being (ARCOSH). ZHANG, C. Y. and LIN, M. C., 2018, August. Optimization of Cost Plus Incentive Fee Contract in Equipment Acquisition Considering Cost Revelation. In 2018 International Conference on Management Science and Engineering (ICMSE) (pp. 60-66). IEEE. Online 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Every Type of Contract You Could Ever Possibly Encounter.2020. [Online]. Available Through: <https://learn.g2.com/types-of-contracts> What is a Cost Plus Contract? Advantages and Disadvantages.2021. [Online]. Available Through:<https://civilophilia.com/what-is-a-cost-plus-contract-advantages-and- disadvantages/> 2