Contract and Procurement Management

Verified

Added on  2022/11/25

|16
|621
|338
Presentation
AI Summary
This presentation focuses on contract and procurement management in the construction industry, specifically through a case study of Central Queensland University's new campus construction. It discusses different procurement methods, their advantages and disadvantages, and provides recommendations for effective project management.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
CONTRACT AND
PROCUREMENT MANAGEMENT
TERM1-2019 ASSESSMENT2: CASE STUDY

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
About Central Queensland
University
Constructing new own
campus for meeting the
increasing students
demand.
The construction includes
developing a main
lecture’s building.
Laboratories for computer
and engineering
department
Conference hall
A motel
Document Page
Procurement methods
Procurement is basically
referred to the term that is
used for describing the
activities that is taking place
with the help of client for
making better construction
within the building or the
organization.
The different types of
procurement methods are
lump sum route, design and
model , construction
Document Page
Procurement route suggested
by PPMP20011
Lump Sum procurement method is a
traditional way of procuring
construction. This includes working
on a fixed lump sum price that is
agreed by the workers before
starting the work.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reason behind choosing the route
Suitable for developing
a new site or a
building
Offers better strategy
for small and large
scales
Flexible for the project
Focuses on managing
the activities along
with stakeholders
Document Page
Time and Cost
It is expected that the project of CQU will get
executed within 132 days.
The campus will be available towards the students
by 2020.
The total cost that is going to be spent over this
project is around $85,720.00
Document Page
Schedule

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Advantages
Offers better result towards
the users within less time.
Offers better expertise
towards the project
Reduces client risk by fixing
the price.
Huge amount of profit
margin towards the
contractor.
The chances of changing
orders get minimized in this
type of procurement route.
Document Page
Disadvantages
Unless a team of
contractors are being
assigned to the company
the whole system may
get frustrated.
Loss of control over the
project
tender preparation turns
to be costliest activity to
perform.
Huge time is needed to
prepare the documents
Document Page
Risks with procurement
method
Once the control is lost
over the project it
becomes difficult to
manage the activities
It becomes difficult to
make a decision at critical
situations
Operational decision gets
complicated
Stakeholders conflicts
regarding interest tends to
occur

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Recommendations
Knowledgeable
subcontractors
needs to be hired
Time
management
needs to be done
effectively
Stakeholder
engagement
needs to be
improved
Document Page
Methodology behind the route
Lump sum route is considered to
be one of the low financial risks
from the perspective of
management contract.
This is the most commonly used
standard for managing the project
as it offers better flexibility toward
the organization and also insures
that the project is being carried
out without any defect.
However it is observed that this
methodology offers the minimum
risk towards the contractors and a
huge amount of risk remains
towards the clients.
Document Page
Methodology behind the
route
This methodology offers the
minimum risk towards the
contractors and a huge amount of
risk remains towards the clients.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Recommendation for the CQU
Focus on developing a
proper time based
schedule on which the
project will be
developed
Choosing appropriate
procurement method
Hiring better executive
Calculating exact
number of
accommodates
Document Page
References
Behrens, D., Gerwig, C., Schoormann, T. and
Knackstedt, R., 2018. Managing the Procurement
Process in Service Portals–An Automated Matching
Approach with Demand-Side Management
Methods. Enterprise Modelling and Information
Systems Architectures (EMISAJ)–International
Journal of Conceptual Modeling: Vol. 13, Nr. 15.
De Araújo, M.C.B., Alencar, L.H. and de Miranda
Mota, C.M., 2017. Project procurement
management: A structured literature
review. International Journal of Project
Management, 35(3), pp.353-377.
Document Page