This article discusses cost and quality management in project management. It covers topics such as project cost estimation, budget baseline, tools and techniques used in cost management plan, and justification for the budgetary plan. The article also includes a table of costs associated with the resources of the project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROJECT MANAGEMENT
Part B: Cost and Quality Management
Name of the Student
Name of the University
Author’s Note
Part B: Cost and Quality Management
Name of the Student
Name of the University
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
PROJECT MANAGEMENT
Table of Contents
1. Cost management planning....................................................................................................2
1.1 Project cost estimate.........................................................................................................2
1.2 Project budget baseline....................................................................................................6
1.3 Tools and techniques used in cost management plan.......................................................7
1.4 Justification for the budgetary plan..................................................................................8
1.5 Gantt chart......................................................................................................................12
2. Quality management planning.............................................................................................13
Bibliography.............................................................................................................................17
PROJECT MANAGEMENT
Table of Contents
1. Cost management planning....................................................................................................2
1.1 Project cost estimate.........................................................................................................2
1.2 Project budget baseline....................................................................................................6
1.3 Tools and techniques used in cost management plan.......................................................7
1.4 Justification for the budgetary plan..................................................................................8
1.5 Gantt chart......................................................................................................................12
2. Quality management planning.............................................................................................13
Bibliography.............................................................................................................................17
2
PROJECT MANAGEMENT
1. Cost management planning
1.1 Project cost estimate
Task Name Duration Cost
St. Dismas Assisted Living Facility Project 4420 days $9,890,892.00
Initiation phase 793 days $7,993,688.00
Construction & Furnishing 369 days $0.00
Facility construction 329 days $0.00
Phase 1 - Foundation & excavation
(basement/1st floor slab)
95 days $608,360.00
Phase 2 - Structure (steel/framing) 113 days $6,752,944.00
Phase 3 - Enclosure (masonry/windows/roof) 134 days $11,792.00
Phase 4 - Interiors
(drywall/ceiling/flooring/case goods)
234 days $620,592.00
First 45 (light assisted) units ready to prepare
for occupancy
0 days $0.00
First 45 units ready for residents 8 days $0.00
Remaining 57 units (light & heavy) ready to
prepare for occupancy
0 days $0.00
Construction complete 0 days $0.00
Building ready for residents 8 days $0.00
Planning phase 654 days $722,700.00
Legal and Licensing Requirements 154 days $0.00
Research licensing requirements for residential 38 days $3,040.00
PROJECT MANAGEMENT
1. Cost management planning
1.1 Project cost estimate
Task Name Duration Cost
St. Dismas Assisted Living Facility Project 4420 days $9,890,892.00
Initiation phase 793 days $7,993,688.00
Construction & Furnishing 369 days $0.00
Facility construction 329 days $0.00
Phase 1 - Foundation & excavation
(basement/1st floor slab)
95 days $608,360.00
Phase 2 - Structure (steel/framing) 113 days $6,752,944.00
Phase 3 - Enclosure (masonry/windows/roof) 134 days $11,792.00
Phase 4 - Interiors
(drywall/ceiling/flooring/case goods)
234 days $620,592.00
First 45 (light assisted) units ready to prepare
for occupancy
0 days $0.00
First 45 units ready for residents 8 days $0.00
Remaining 57 units (light & heavy) ready to
prepare for occupancy
0 days $0.00
Construction complete 0 days $0.00
Building ready for residents 8 days $0.00
Planning phase 654 days $722,700.00
Legal and Licensing Requirements 154 days $0.00
Research licensing requirements for residential 38 days $3,040.00
3
PROJECT MANAGEMENT
Uniform accessibility standard compliance 10 days $0.00
Investigate law firm and outline services 20 days $0.00
Prepare project plan for license 10 days $674,300.00
File license — by opening date 0 days $0.00
Curb - cut approval from county (access to 53 days $4,240.00
Investigate corporate structure for assisted
living
115 days $18,400.00
Determine Board of Trustee membership 15 days $0.00
Appoint Board of Trustees 20 days $0.00
Prepare draft Code of Regulation 20 days $0.00
Prepare draft Code of Regulation 20 days $0.00
Prepare document and fi ling of governance
structure
60 days $0.00
Draft service agreement with St. Dismas for
services provided
20 days $1,600.00
Lease issues 110 days $8,800.00
Research Long Term Care insurance 60 days $0.00
Facility “rules” defined 20 days $0.00
Spell out changes for residents in moving 30 days $0.00
Lease template prepared 30 days $0.00
Review all marketing materials for compliance 154 days $12,320.00
Execution phase 2757 days $1,001,392.00
Operational Implementation Plan 1 day $272.00
Management/Organization structure 87 days $6,960.00
PROJECT MANAGEMENT
Uniform accessibility standard compliance 10 days $0.00
Investigate law firm and outline services 20 days $0.00
Prepare project plan for license 10 days $674,300.00
File license — by opening date 0 days $0.00
Curb - cut approval from county (access to 53 days $4,240.00
Investigate corporate structure for assisted
living
115 days $18,400.00
Determine Board of Trustee membership 15 days $0.00
Appoint Board of Trustees 20 days $0.00
Prepare draft Code of Regulation 20 days $0.00
Prepare draft Code of Regulation 20 days $0.00
Prepare document and fi ling of governance
structure
60 days $0.00
Draft service agreement with St. Dismas for
services provided
20 days $1,600.00
Lease issues 110 days $8,800.00
Research Long Term Care insurance 60 days $0.00
Facility “rules” defined 20 days $0.00
Spell out changes for residents in moving 30 days $0.00
Lease template prepared 30 days $0.00
Review all marketing materials for compliance 154 days $12,320.00
Execution phase 2757 days $1,001,392.00
Operational Implementation Plan 1 day $272.00
Management/Organization structure 87 days $6,960.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4
PROJECT MANAGEMENT
Recruit & hire Executive Director 17.4 wks. $6,960.00
Interior design issues decided (furnishings, etc.) 20 days $0.00
Determine what was provided with lease and
what was furnished in some units
2 wks. $405,000.00
Determine budget for interior 10 days $202,000.00
Carpet and wall finish determined 2 wks. $125,000.00
Furniture and room layout 2 wks. $0.00
Facility and equipment needs defined 4 wks. $1,600.00
Staffing determined 2 wks. $1,600.00
Office space for physicians 4 wks. $1,600.00
Medical staffing needs determined & Director
appointed
4 wks. $1,600.00
Food service 45 days $30,000.00
Menus selected 8 wks. $0.00
Waiting and service staffing needs determined 4 wks. $0.00
Additional equipment needs 4 wks. $0.00
Telecommunications services 45 days $0.00
Investigate phone service options 45 days $33,600.00
Certification/Accreditation requirements 42 days $0.00
Investigate requirements & timing of applicants 0 days $0.00
Develop clinical and operational quality 0 wks. $0.00
Develop financial systems (billing, etc.) 6 wks. $2,400.00
Human resources 79 wks. $31,600.00
PROJECT MANAGEMENT
Recruit & hire Executive Director 17.4 wks. $6,960.00
Interior design issues decided (furnishings, etc.) 20 days $0.00
Determine what was provided with lease and
what was furnished in some units
2 wks. $405,000.00
Determine budget for interior 10 days $202,000.00
Carpet and wall finish determined 2 wks. $125,000.00
Furniture and room layout 2 wks. $0.00
Facility and equipment needs defined 4 wks. $1,600.00
Staffing determined 2 wks. $1,600.00
Office space for physicians 4 wks. $1,600.00
Medical staffing needs determined & Director
appointed
4 wks. $1,600.00
Food service 45 days $30,000.00
Menus selected 8 wks. $0.00
Waiting and service staffing needs determined 4 wks. $0.00
Additional equipment needs 4 wks. $0.00
Telecommunications services 45 days $0.00
Investigate phone service options 45 days $33,600.00
Certification/Accreditation requirements 42 days $0.00
Investigate requirements & timing of applicants 0 days $0.00
Develop clinical and operational quality 0 wks. $0.00
Develop financial systems (billing, etc.) 6 wks. $2,400.00
Human resources 79 wks. $31,600.00
5
PROJECT MANAGEMENT
Work force management recommendations 6 wks. $2,400.00
Project plan for recruitment developed 2 wks. $0.00
Policies and procedures developed 60 days $0.00
Obtain ‘samples’ of assisted living policies &
procedures from other institutions
4 wks. $1,600.00
Investigate assisted living laws proposed in
other stages
12 wks. $4,800.00
Technology & information systems 344 wks. $137,600.00
Develop plan for technology access for
residents (TV, Cable, PC ’ s)
3 wks. $0.00
Investigate software/technology options for
residents
12 wks. $4,800.00
Completion of the construction and furnishing
phase
490 days $173,112.00
Marketing 270 days $30,240.00
Community mailing about construction project 0 days $0.00
Initial informational meetings 16 days $1,792.00
St. Dismas volunteers 1 day $0.00
Community groups 4 days $0.00
St. Dismas staff (all shifts) 3 days $0.00
Presentation prepared for Speaker ’ s Bureau 0 days $0.00
Provide updates to community 0 days $0.00
Inquiry log established 0 days $0.00
PROJECT MANAGEMENT
Work force management recommendations 6 wks. $2,400.00
Project plan for recruitment developed 2 wks. $0.00
Policies and procedures developed 60 days $0.00
Obtain ‘samples’ of assisted living policies &
procedures from other institutions
4 wks. $1,600.00
Investigate assisted living laws proposed in
other stages
12 wks. $4,800.00
Technology & information systems 344 wks. $137,600.00
Develop plan for technology access for
residents (TV, Cable, PC ’ s)
3 wks. $0.00
Investigate software/technology options for
residents
12 wks. $4,800.00
Completion of the construction and furnishing
phase
490 days $173,112.00
Marketing 270 days $30,240.00
Community mailing about construction project 0 days $0.00
Initial informational meetings 16 days $1,792.00
St. Dismas volunteers 1 day $0.00
Community groups 4 days $0.00
St. Dismas staff (all shifts) 3 days $0.00
Presentation prepared for Speaker ’ s Bureau 0 days $0.00
Provide updates to community 0 days $0.00
Inquiry log established 0 days $0.00
6
PROJECT MANAGEMENT
Ground-breaking ceremony — during National
Hospital Week
0 days $0.00
Marketing plan developed and implemented 180 days $135,000.00
PR firm contracted 4 wks. $0.00
Marketing plan developed 8 wks. $4,480.00
Determine name and signage for facility 0 days $0.00
Hire Marketing Director 4 wks. $0.00
Marketing plan ready to implement 0 days $0.00
Implementation of marketing plan—5 months
before facility ready, then ongoing
20 days $1,600.00
1.2 Project budget baseline
09 April 2018 05 April 2021 01 April 2024 29 March 2027 25 March 2030 21 March 2033
$0.00
$2,000,000.00
$4,000,000.00
$6,000,000.00
$8,000,000.00
$10,000,000.00
$12,000,000.00
Budget baseline
Cumulative Cost
Figure 1: Cost baseline
PROJECT MANAGEMENT
Ground-breaking ceremony — during National
Hospital Week
0 days $0.00
Marketing plan developed and implemented 180 days $135,000.00
PR firm contracted 4 wks. $0.00
Marketing plan developed 8 wks. $4,480.00
Determine name and signage for facility 0 days $0.00
Hire Marketing Director 4 wks. $0.00
Marketing plan ready to implement 0 days $0.00
Implementation of marketing plan—5 months
before facility ready, then ongoing
20 days $1,600.00
1.2 Project budget baseline
09 April 2018 05 April 2021 01 April 2024 29 March 2027 25 March 2030 21 March 2033
$0.00
$2,000,000.00
$4,000,000.00
$6,000,000.00
$8,000,000.00
$10,000,000.00
$12,000,000.00
Budget baseline
Cumulative Cost
Figure 1: Cost baseline
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7
PROJECT MANAGEMENT
(Source: Created by author)
1.3 Tools and techniques used in cost management plan
In order to calculate the cost for the project “St. Dismas Assisted Living Facility
Project”, Project libre software is utilized. The project schedule is used in order to organize
the tasks of the project into number of phases so that it can be easily understood by the team
members of the project. The team members of the project are assigned to the tasks and
activities of the project as per the capability of knowledge so that they can be able to
complete the project work successfully within the time that is assumed. After assigning
resources within the various activities of the project, bottom up approach is utilized in order
to calculate the cost of the project. The bottom up estimate method generally starts with the
estimation from the lower level that is from the work package level that is created as per the
work breakdown structure and then rolling up to the highest level. This technique is mainly
utilized as this technique of cost management helps in estimating cost accurately.
For managing cost of the project following tools and techniques are generally
utilized:
Cost tracking: Cost tracking one of the most important technique that is mainly
utilized in order to track the budget of the project on a regular basis in order to make sure that
the project is on track in context to the project budget. If proper cost tracking method is used
then it will be quite easy to complete the entire project within the estimated cost.
Time management: Proper time management also helps in managing the cost of the
project. If the entire project gets completed within the estimated time then the organization
does not need to spend much further on the project and as result the entire project will be
completed within the budget that is assumed.
PROJECT MANAGEMENT
(Source: Created by author)
1.3 Tools and techniques used in cost management plan
In order to calculate the cost for the project “St. Dismas Assisted Living Facility
Project”, Project libre software is utilized. The project schedule is used in order to organize
the tasks of the project into number of phases so that it can be easily understood by the team
members of the project. The team members of the project are assigned to the tasks and
activities of the project as per the capability of knowledge so that they can be able to
complete the project work successfully within the time that is assumed. After assigning
resources within the various activities of the project, bottom up approach is utilized in order
to calculate the cost of the project. The bottom up estimate method generally starts with the
estimation from the lower level that is from the work package level that is created as per the
work breakdown structure and then rolling up to the highest level. This technique is mainly
utilized as this technique of cost management helps in estimating cost accurately.
For managing cost of the project following tools and techniques are generally
utilized:
Cost tracking: Cost tracking one of the most important technique that is mainly
utilized in order to track the budget of the project on a regular basis in order to make sure that
the project is on track in context to the project budget. If proper cost tracking method is used
then it will be quite easy to complete the entire project within the estimated cost.
Time management: Proper time management also helps in managing the cost of the
project. If the entire project gets completed within the estimated time then the organization
does not need to spend much further on the project and as result the entire project will be
completed within the budget that is assumed.
8
PROJECT MANAGEMENT
Project change control: If change control will be managed then the organization
does not need to spend on the project changes and as a result the entire project will get
completed within the estimated budget.
Earned value use: Earned value analysis not only helps in managing the cost of the
project but it also helps the organization in measuring its performance as well as progress.
1.4 Justification for the budgetary plan
It is estimated that the entire project of “St. Dismas Assisted Living Facility Project”
will be completed within the budget that is around $9,890,892.00. It is identified that the
entire project will be completed within the assumed budget that is created as per the project
planning. The cost of various resources as well as materials that are utilized in the project are
listed in the table below:
Construction cost Cost
Building $ 6,743,000
Contingency 674,300
Land 600,000
Program development and equipment cost 405,000
Furniture 400,000
A&E fees 347,000
Financing costs 202,000
Capitalized interests 135,000
Site improvements 125,000
Phone & IS system 30,000
Kitchen equipment 30,000
PROJECT MANAGEMENT
Project change control: If change control will be managed then the organization
does not need to spend on the project changes and as a result the entire project will get
completed within the estimated budget.
Earned value use: Earned value analysis not only helps in managing the cost of the
project but it also helps the organization in measuring its performance as well as progress.
1.4 Justification for the budgetary plan
It is estimated that the entire project of “St. Dismas Assisted Living Facility Project”
will be completed within the budget that is around $9,890,892.00. It is identified that the
entire project will be completed within the assumed budget that is created as per the project
planning. The cost of various resources as well as materials that are utilized in the project are
listed in the table below:
Construction cost Cost
Building $ 6,743,000
Contingency 674,300
Land 600,000
Program development and equipment cost 405,000
Furniture 400,000
A&E fees 347,000
Financing costs 202,000
Capitalized interests 135,000
Site improvements 125,000
Phone & IS system 30,000
Kitchen equipment 30,000
9
PROJECT MANAGEMENT
The cost that are associated with the resources of the project are as follows:
Resource
Name
Type
Materi
al
Label
Initia
ls
Grou
p
Max
.
Unit
s
Std. Rate
Ovt.
Rate
Cost/
Use
Accru
e At
Base
Calendar
Constructio
n project
manager
Work C
100
%
$11.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Legal Work
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
CFO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
VP
marketing
Work V
100
%
$14.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Splient Work S
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
COO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Dr. Link Work D
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
PROJECT MANAGEMENT
The cost that are associated with the resources of the project are as follows:
Resource
Name
Type
Materi
al
Label
Initia
ls
Grou
p
Max
.
Unit
s
Std. Rate
Ovt.
Rate
Cost/
Use
Accru
e At
Base
Calendar
Constructio
n project
manager
Work C
100
%
$11.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Legal Work
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
CFO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
VP
marketing
Work V
100
%
$14.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Splient Work S
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
COO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Dr. Link Work D
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10
PROJECT MANAGEMENT
Chief
engineer
Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Hr.
Director
Work H
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
CIO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Marketing
team
Work
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Building
Materi
al
$6,743,000.
00
$0.00
Prorat
ed
Building
Contingenc
y
Materi
al
C
$674,300.0
0
$0.00
Prorat
ed
Contingenc
y
Land
Materi
al
L
$600,000.0
0
$0.00
Prorat
ed
Land
Program
and
developme
nt
Materi
al
P
$405,000.0
0
$0.00
Prorat
ed
Program
and
developme
nt
Furniture
Materi
al
F
$400,000.0
0
$0.00
Prorat
ed
Furniture
Financing
cost
Materi
al
F
$202,000.0
0
$0.00
Prorat
ed
Financing
cost
PROJECT MANAGEMENT
Chief
engineer
Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Hr.
Director
Work H
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
CIO Work C
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Marketing
team
Work
100
%
$10.00/hr.
$0.00/
hr.
$0.00
Prorat
ed
Standard
Building
Materi
al
$6,743,000.
00
$0.00
Prorat
ed
Building
Contingenc
y
Materi
al
C
$674,300.0
0
$0.00
Prorat
ed
Contingenc
y
Land
Materi
al
L
$600,000.0
0
$0.00
Prorat
ed
Land
Program
and
developme
nt
Materi
al
P
$405,000.0
0
$0.00
Prorat
ed
Program
and
developme
nt
Furniture
Materi
al
F
$400,000.0
0
$0.00
Prorat
ed
Furniture
Financing
cost
Materi
al
F
$202,000.0
0
$0.00
Prorat
ed
Financing
cost
11
PROJECT MANAGEMENT
Capitalized
interest
Materi
al
C
$135,000.0
0
$0.00
Prorat
ed
Capitalized
interest
Site
improveme
nts
Materi
al
S
$125,000.0
0
$0.00
Prorat
ed
Site
improveme
nts
Phone &IS
system
Materi
al
P $30,000.00 $0.00
Prorat
ed
Phone &IS
system
Kitchen
equipment
Materi
al
K $30,000.00 $0.00
Prorat
ed
Kitchen
equipment
.
PROJECT MANAGEMENT
Capitalized
interest
Materi
al
C
$135,000.0
0
$0.00
Prorat
ed
Capitalized
interest
Site
improveme
nts
Materi
al
S
$125,000.0
0
$0.00
Prorat
ed
Site
improveme
nts
Phone &IS
system
Materi
al
P $30,000.00 $0.00
Prorat
ed
Phone &IS
system
Kitchen
equipment
Materi
al
K $30,000.00 $0.00
Prorat
ed
Kitchen
equipment
.
12
PROJECT MANAGEMENT
1.5 Gantt chart
Figure 2: Gantt chart
PROJECT MANAGEMENT
1.5 Gantt chart
Figure 2: Gantt chart
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13
PROJECT MANAGEMENT
(Source: Created by Author)
PROJECT MANAGEMENT
(Source: Created by Author)
14
PROJECT MANAGEMENT
2. Quality management planning
Identification of
factors
Purpose Measurement
of project
quality
Analyzing
project quality
Quality control
Training to the
project team
members
It is very much
important to
provide proper
training to the
team members
of the project so
that they can
capable of
completing the
project work
within the
estimated budget
as well as time
without facing
any difficulty in
doing work.
In the project,
proper level of
training is not
provided to the
team members
of the project.
Appropriate
level of training
is not provided
to the team
members of the
project is mainly
reflected by the
difficulties that
the project team
members are
facing while
working with the
project.
It is very much
important to
provide proper
quality of
training to the
team members
of the project so
that they can be
complete the
entire project
work
successfully
within the
estimated tine
and budget
without facing
any type of
challenges.
Use of proper It is very much Proper quality Poor quality of It is very much
PROJECT MANAGEMENT
2. Quality management planning
Identification of
factors
Purpose Measurement
of project
quality
Analyzing
project quality
Quality control
Training to the
project team
members
It is very much
important to
provide proper
training to the
team members
of the project so
that they can
capable of
completing the
project work
within the
estimated budget
as well as time
without facing
any difficulty in
doing work.
In the project,
proper level of
training is not
provided to the
team members
of the project.
Appropriate
level of training
is not provided
to the team
members of the
project is mainly
reflected by the
difficulties that
the project team
members are
facing while
working with the
project.
It is very much
important to
provide proper
quality of
training to the
team members
of the project so
that they can be
complete the
entire project
work
successfully
within the
estimated tine
and budget
without facing
any type of
challenges.
Use of proper It is very much Proper quality Poor quality of It is very much
15
PROJECT MANAGEMENT
quality of
materials
necessary to
utilize proper
quality of
materials within
the project so
that the project
manager does
not face any type
of quality issue
during
construction as
well as
furnishing the
project.
of materials are
not utilized
while
constructing.
materials are
generally
utilized within
the project is
mainly reflected
through the
quality issues
that the project
is facing.
necessary to
utilize
appropriate
quality of
materials within
the project so
that the entire
project will be
completed
successfully
within the
estimated budget
and time.
Use of
improper
equipment’s
The
equipment’s that
are not utilized
properly in the
project and as
the result the
ultimate
outcome of the
project gets
The
equipment’s are
not used
appropriately by
the team
members who
are mainly
involved with
the project.
The
equipment’s are
not used
appropriately if
reflected by the
project that the
project manager
faces in dealing
with tasks that
Proper
utilization of
equipment’s are
necessary so that
the project work
can be
successfully
completed with
the desired due
PROJECT MANAGEMENT
quality of
materials
necessary to
utilize proper
quality of
materials within
the project so
that the project
manager does
not face any type
of quality issue
during
construction as
well as
furnishing the
project.
of materials are
not utilized
while
constructing.
materials are
generally
utilized within
the project is
mainly reflected
through the
quality issues
that the project
is facing.
necessary to
utilize
appropriate
quality of
materials within
the project so
that the entire
project will be
completed
successfully
within the
estimated budget
and time.
Use of
improper
equipment’s
The
equipment’s that
are not utilized
properly in the
project and as
the result the
ultimate
outcome of the
project gets
The
equipment’s are
not used
appropriately by
the team
members who
are mainly
involved with
the project.
The
equipment’s are
not used
appropriately if
reflected by the
project that the
project manager
faces in dealing
with tasks that
Proper
utilization of
equipment’s are
necessary so that
the project work
can be
successfully
completed with
the desired due
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16
PROJECT MANAGEMENT
affected. Thus, it
is very much
necessary to
utilize the
equipment’s of
the project quite
effectively.
needs to be
completed by
utilization of
equipment’s.
date by not
compromising
the quality of the
project.
Investigations
on the project
must be
undertaken
properly
Due to
improper
investigation
about the
project, the
needs as well as
requirements of
the project does
not get clear and
as result the
project managers
are not able to
meet the
demands as well
as needs of the
project
Proper
investigation on
the project is not
undertaken
before the
initiation phase
of the project.
The project
manager’s faces
difficulty in
making proper
investigation is
mainly reflected
by the
challenges as
well as issues
they face in
meeting the
needs as well as
objectives of the
project.
Proper
investigation
must be
undertaken in
order to identify
the needs as well
as requirements
of the project
appropriately so
that proper
quality based
project can be
delivered to the
clients
PROJECT MANAGEMENT
affected. Thus, it
is very much
necessary to
utilize the
equipment’s of
the project quite
effectively.
needs to be
completed by
utilization of
equipment’s.
date by not
compromising
the quality of the
project.
Investigations
on the project
must be
undertaken
properly
Due to
improper
investigation
about the
project, the
needs as well as
requirements of
the project does
not get clear and
as result the
project managers
are not able to
meet the
demands as well
as needs of the
project
Proper
investigation on
the project is not
undertaken
before the
initiation phase
of the project.
The project
manager’s faces
difficulty in
making proper
investigation is
mainly reflected
by the
challenges as
well as issues
they face in
meeting the
needs as well as
objectives of the
project.
Proper
investigation
must be
undertaken in
order to identify
the needs as well
as requirements
of the project
appropriately so
that proper
quality based
project can be
delivered to the
clients
17
PROJECT MANAGEMENT
appropriately.
PROJECT MANAGEMENT
appropriately.
18
PROJECT MANAGEMENT
Bibliography
Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley &
Sons.
Ika, L.A. (2015). Opening the black box of project management: Does World Bank project
supervision influence project impact?. International Journal of Project
Management, 33(5), pp.1111-1123.
Klein, L., Biesenthal, C. & Dehlin, E. (2015). Improvisation in project management: A
praxeology. International journal of project management, 33(2), pp.267-277.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. & Villanueva, P. (2014). Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. & Villanueva, P. (2014). Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Mir, F.A. & Pinnington, A.H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), pp.202-217.
Pollack, J. & Adler, D. (2015). Emergent trends and passing fads in project management
research: A scientometric analysis of changes in the field. International Journal of
Project Management, 33(1), pp.236-248.
PROJECT MANAGEMENT
Bibliography
Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley &
Sons.
Ika, L.A. (2015). Opening the black box of project management: Does World Bank project
supervision influence project impact?. International Journal of Project
Management, 33(5), pp.1111-1123.
Klein, L., Biesenthal, C. & Dehlin, E. (2015). Improvisation in project management: A
praxeology. International journal of project management, 33(2), pp.267-277.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. & Villanueva, P. (2014). Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. & Villanueva, P. (2014). Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
Mir, F.A. & Pinnington, A.H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), pp.202-217.
Pollack, J. & Adler, D. (2015). Emergent trends and passing fads in project management
research: A scientometric analysis of changes in the field. International Journal of
Project Management, 33(1), pp.236-248.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
19
PROJECT MANAGEMENT
Rowell, C.J., 2016. Book Review: Project Management for Information Professionals. Library
Resources & Technical Services, 60(4), pp.280-281.
PROJECT MANAGEMENT
Rowell, C.J., 2016. Book Review: Project Management for Information Professionals. Library
Resources & Technical Services, 60(4), pp.280-281.
1 out of 20
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.