The Challenges of Agile Method in Software Development
Verified
Added on  2019/12/28
|8
|3479
|166
Essay
AI Summary
The use of traditional software development processes can sometimes create problems in developing complicated software, as the whole process is divided into a series of steps and it is difficult to make changes in every stage according to client requirements (Ghani et al., 2013).
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Coursework Agile v/s Traditional Methods 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
INTRODUCTION In the present era, to manage the projects in an effectual way business organizations of IT industry make use of Agile approach. This approach places high level of emphasis on delivering software incrementally from the beginning of the project instead of trying to provide it all at once near theend. This in turn facilitates rapid delivery of software products and thereby evolves high level of satisfaction among them. In this regard, the present report will discuss the extent to which agile process helps IT companies in managing the projects. Along with this, it will also shed light on the challenges which can be easily resolved through the means of Agile approach. Further, it will develop understanding about the manner through which one can easily deal with the challenges by using agile approach.The main benefit of using agile approach is that it help in maximizing the customer contentment level as each Sprint operating attribute of the software is rendered to them. It further concentrate on superior design of the offering. The agile approach can be used to minimize thecostandriskofprojectbyimprovingthesoftwarequality.Withthehelpofagile approach,company can simply the software development process . Other than this, the visibility of project can be enhanced with the help of agile methods.The various studies shows that there is 11% hike as compared to last two years in the number of people consenting with the fact that agile assist company in finishing the projects at faster pace. MAIN BODY According the view points ofStol, O'Sullivan and O'Brien (2013)agile model believes that to handle every project business unit requires varied resources and strategic framework. Hence, in this regard, to assess the methods for handling the projects business unit divides all the tasks according to the time frame. This in turn helps software companies in managing and accomplishing the project within the suitable time frame. Hence, adaptability and flexibility is one of the main aspects due to which software companies make use of agile approach and gets benefit from it. FurtherGhani,S ultan and Nafchi (2013)describedagile as aspectwhich lays high level of emphasisonassessingthedeviationsbymakingcontinuousmonitoringofthesoftware development process. This process exists throughout the life cycle of project. Along with this, agile process focuses on four core values to develop the software in the best possible manner. Core values includes high level of interaction among the team members throughout the process. Drangmeister, Kern and Naumann, (2013)stated from their study that there are lots of deficiencies are present in the traditional methods of software development. Moreover, SDLC models such as waterfall follows predictive approach. In this, detailed planning is highly required for completing the project. Along with this, under traditional methods' software development 2
company is require making proper forecast of the task and features they need to deliver in the upcoming months. Hence, under traditional method business unit makes prior planning for the product life cycle. Further, company also faces difficulty in changing the process or aspects of product development. In this, regard, by making use of agile approach software development companies can remove such deficiency to the large extent. The reason behind this agile process of software development is based on adaptive approach in which detailed planning is not highly required. Agile process only makes focus on clarifying the future tasks and features which they need to develop. Further, team who follows such approach is ready to accept the changes more frequently by making continuous testing of the product. This in turn reduces the possibility of product failure to the large extent. Hence, all such aspects highly attract to the software development companies to make use of agile process rather than traditional methods. Kruchten, ( 2013) states that Agile software development details a set of principles for development of software wherein requirement and solution develop via the join, collaborative effort of self-governing cross functional teams.As per the opinion ofDingsøyr and Moe, ( 2013) there are wide range of challenges that non agile entities face while trying to adopt Agile development practice.According to the views ofCampanelli and Parreiras (2015)) agile methods are mainly dependent upon the collaborative teamwork. For this aspect,the team must be developed and trained so as to enable them to perform varied functions and work independently. This further involve significant cost and resources and lack of availability can have adverse impact on overall project success. Thereafter, agile process require individual to work in different functions within the same team. However, for this aspect, they must have adequate skills and knowledge.Tripp and Armstrong (2014)states that success of agile practices depends upon the availability of skilled, competent and knowledgeable employees. Therefore, it is important for company to have proper human inventory. It can also be stated that agile project will pay more emphasis on above average individuals. It may further result into adverse staffing and morale issues. According to the views ofHannola Friman and Niemimuukko, (2013) Agile projects requires effective customer collaboration .for this aspect, it is important for business to develop a atmosphere of mutual trust and open interaction. However, entity may face challenge, in terms of getting positive involvement of employees in varied processes. As per the words ofMeyer ( 2014) for success of Agile practices, entity must shift from mechanistic style to an organic one or to have proper blend of both styles. This further involve change de to which entity can face resistance issue. In the opinion ofGhani,S ultan and Nafchi (2013)Organizational culture impacts the way individuals behave and work with each other. Culture has important outcome on business processes 3
suchasdecisionmaking,resolvingproblems,enhancinginterpersonalrelationships, communication, and others. Therefore, shift to Agile practices needs a sound knowledge and understanding of the present business practises and functions before altering them. The change to agile practices means shift from dominating a command-and-control style to a collaborative one. The project manager becomes a supporter who proper guidance and coaching to the team members and coordinates their cooperative attempts. The prime challenge in this context is related with would be to make the manager give up the authority they relished so far. According to the views of () various companies have done significant investment in traditional practices to assure powerful processes and check stableness in their way of performing functions. Here, shift to Agile practices stimulate company to observe the present setup and forego the rigid processes that obstruct team from using new methods. In this respect, entity face challenge in shifting from a process centric business system. As per theopinion ofAshmore and Runyan, (2014) historic life cycle processes are characterized, measured, and controlled in a elaborate way to decrease variations. On the contrast,Kruchten, ( 2013) states that in Agile practices project management has to depend on assessment rather than measurement and has to maintain the processes extremely custom-made. The exercise of writing code and then using test cases is constituted in traditional methods. On the contrastin Agile practices, it is reversed as there the test cases are engrossed before any code is generated. This redefines the role of quality assurance and control departments in the company. However, on the critical note,Ashmore and Runyan, (2014)argued that agile process carries high level of risk in relation to sustainability, maintainability and extensibility of the project. Along with this, agile is not highly suitable for managing the complex task. Companies can attain success with such process only when the project is not highly difficult. Further, under this, team members are highly dependent on each other for the generation of document. On the other hand,Frimheden (2013) presented that customer interaction is the backbone of agile methodology. According to the views ofAshmore and Runyan, (2014)Under the waterfall development method the entire project is bifurcated into a series of different phase. At first planning is done, in which the project needs are analysed and noted down. Erstwhile the needs have been amply specified, the project then continues through the designing, coding, testing and integration phases, in the end resulting into preparation of the finished product. The main emphasis of waterfall development method is on documentation of each activity. According to this, the record will improve the efficiency of company regarding its present program in forthcoming time. The major limitation of this method is t ha t after the completion of one step, it is not possible for the project developer to go back to previous stage for doing alteration. Also, Waterfall method mainly depends on first necessitate. However, if these necessitate are 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
defective in any way, than it can become cause of failure of entire project.On the other hand, I n agile approach,in place of series an incremental approach is considered. The project developers commence with simplistic designing of project followed by operative on small modules. Thereafter, modification and work is done on modules in a month or week sprints and during the conclusion of each sprint the precedence are assessed and test are done. With the aid of these sprints the bugs can be detected. The advantage of agile method is that it permit the modification that are required after the initial planning. Therefore, the program is written again as per the client decision to make modification. Furthermore,therearevariousmethodsthroughwhichAgilepracticesaddressthe limitations of the traditional software development life cycle. In the light of agile methods, the practices takes into consideration the empirical process control model rather than the outlined process control model used in traditional methods (Campanelli and Parreiras, 2015). Here, the empirical process control is mainly utilized for processes that are not properly characterized and are uncertain and unquotable. The empirical process employ control through regular review and adaptation. Since software building methodsareextremelycomplex and multivariate in nature therefore, empirical process control methods appear to be a foremost choice for the corporation so as to support in rendering fruitful outcomes. Accordant tothe complexity theory, a complex adaptive system (CAS) manages on its own and adjust to modification in the surroundings regardless to any fundamental rules administrating its action. Further, the Agile development system can be compared to a CAS, reactingto tough and unforeseeable alteration in the needs. Addressing the limitation of Waterfall by Agile The most important limitation of waterfall model is that manager cannot move to the next activity before completing first. Moreover, it cannot be considered suitable to account constant change in the planned activities. Finding it necessary to complete prior activity before moving to the next does not allow consumers to do anything until and unless the entire system will be complete. Furthermore, no allowances are available to the project planners for prototyping which is also a limitation of it and at the end of project completion, only maintenance remains that need to be done. All these limitations are perfectly addressed by Agile methodology as it is an iterative and rapid The varioustechniquesare adopted by software development companiesfor making software. It supports in developing the required software in effective manner. Agile is a efficient methodology which aids in promoting continuous designing and development of software's. It also 5
aids in testing the software throughout the life cycle of project development. In the agile technique a systematic procedure is adopted for designing the computer application programme. Various core values are included in this technique and comprehensive documentation is done for developing software. Regular interaction with consumers is done for doing contract negotiation. The software is developed in a team and and regular interactions is done with consumers for making software as per their requirement (Ghani,S ultan and Nafchi, 2013). An incremental and iterative technique is adopted for developing the computer application program. Whole process is divided into series of steps and team members are assigned specific tasks to accomplish. Clients who gave order for designing the software are regularly communicated and proper information is provided to them about designing stages of software making. Opportunities are provided to clients for looking at development stages of software making. Feedback given by customers are recorded properly and necessary changes are made in the software as per the requirement of clients. The software development cycle is broken into series of steps due to which it becomes easier for making necessary changes as per requirement of client (Meyer,2014). Many IT firms are making use of Agile technique for designing computer application programme. Before initiating the development cycle proper interaction is done among team members and they are assigned specific works to accomplish. Some companies uses waterfall model which is a traditional method for making software. In this techniques structured approach is used and major focus is given on frequent delivery of products. Clients are not asked there requirements in the project development cycle due to which it becomes difficult to make improvements as per the requirement of clients.ITfirms uses various techniques for developing softwares and the method adopted proves beneficial for making the product as per the orders given by clients. Agile technique used by firms aids in meeting the requirement of clients in proper manner. It is a effective method and also known as unstructured technique for developing the software (Kruchten, 2013). Whole process of making the computer application programme is divided in series of steps and teams are assigned on specific projects. The whole team is invited in a conference meeting and basic requirement and major objective for making the application program is described to them. All the team members are assigned specific tasks to accomplish and they are encourage to make regular interaction with team members. Clients are informed at every stage of software development and regular feedback are taken from them. If and disruptions are found by the client then necessary changes are made instantly and it supports in avoiding final rejection of product. A comprehensive documentation process is used and contract negotiation is also done for avoiding any legal trouble. It is a very effective technique and regular interaction with clients aid in developing the software as per the needs of client. Waterwall method of designing software is a traditional approach and no breaks are given in the project development 6
cycle under this method. In this method requirement and orders from the customers are taken once only and they are not informed about various stages of development of software. This approach is less effective as it is difficult to develop the product as per the needs of clients. Majority of IT firms are giving preferences to Agile technique as it is more productive. IT firms are adopting various techniques for developing computer application program as per the requirement of clients. The methods provide approaches for designing the software as per the need of clients. Many issues are faced in using different methods for making softwares and it is vital that complications should be avoided for making effective application product as per the need of the clientsHannola Friman and (Niemimuukko, 2013). Agile method is more efficient for making the computer application programme but there are many issues associated within. In this method at every stage of software development cycleit is vital to take feedback from the client and it increases duration of project development cycle. Regular feedback from client influence working of all the team members and disruption is created due to regular modifications done in the software. It becomes time consuming and it takes more time to develop the software as per the requirement of client. It is also assertive that regular and close communication should be done with clients and for that employees need to be appointed which increase cost for completing the project. In this method documentation is given less priority which sometimes create problem in the software development. It becomes difficult to develop complicated software as the whole process is divided into series of steps and it is assertive to make changes in every stage as per the requirement of clients (Ghani,S ultan and Nafchi, 2013). CONCLUSION From the above report, it can be concluded that agile methods are better than that of traditional processes. Agile is important method that boost constant process of development and testing during the software designing and testing throughout the software development life cycle of the project. From the project, significant differences in Agile and traditional, Waterfall method has been identified. The agile method suggest additive and repetitive approach for software designing. On the other hand, development of the software flows in sequence from the beginning to closing point. 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES Books and Journal Ashmore, S. and Runyan, K., 2014.Introduction to agile methods. Addison-Wesley Professional. Campanelli, A.S.andParreiras,F.S.,2015. Agilemethodstailoring–A systematicliterature review.Journal of Systems and Software.110.pp.85-100. Dingsøyr,T.andMoe,N.B.,2013.Researchchallengesinlarge-scaleagilesoftware development.ACM SIGSOFT Software Engineering Notes.38(5). pp.38-39. Drangmeister, J., Kern, E. and Naumann, S., 2013, May. Green software engineering with agile methods.InGreenandSustainableSoftware(GREENS),20132ndInternational Workshop on(pp. 78-85). IEEE. Ghani, A.A.A., Sultan, A.B.M. and Nafchi, M.Z., 2013. Obstacles in moving to agile software development methods; at a glance.Journal of Computer Science.9(5). p.620. Grimheden,M.E.,2013.Canagilemethodsenhancemechatronicsdesign education?.Mechatronics.23(8). pp.967-973. Hannola, L., Friman, J. and Niemimuukko, J., 2013. Application of agile methods in the innovation process.International Journal of Business Innovation and Research.7(1).pp.84-98. Kruchten, P., 2013. Contextualizing agile software development.Journal of Software: Evolution and Process.25(4). pp.351-361. Meyer, B., 2014. Agile methods. InAgile!(pp. 133-143). Springer International Publishing. Soundararajan, S., Arthur, J.D. and Balci, O., 2012. August. A methodology for assessing agile software development methods. InAgile Conference (AGILE), 2012(pp. 51-54). IEEE. Stol,K.J.,O'Sullivan, R.andO'Brien,D., 2013.May. Scalingagilemethodsto regulated environments:Anindustrycasestudy.InProceedingsofthe2013International Conference on Software Engineering(pp. 863-872). IEEE Press. Tripp, J.F. and Armstrong, D.J., 2014, January. Exploring the relationship between organizational adoption motives and the tailoring of agile methods. In2014 47th Hawaii International Conference on System Sciences(pp. 4799-4806). IEEE. 8