This assessment is designed to test the student's ability to read and interpret plans and specifications, calculate labour costs, establish physical resource requirements, and develop estimated project costs. The assessment involves a scenario where the student is responsible for developing a cost estimate for the construction of a garage and workshop for David and Tara King. The assessment includes a Part A with 10 questions and a Part B where the student has to prepare a cost estimate based on the specifications provided.