logo

Critical Evaluation of a Project

   

Added on  2022-12-30

18 Pages4513 Words97 Views
Critical Evaluation of a Project

Contents
INTRODUCTION...........................................................................................................................................3
MAIN BODY..................................................................................................................................................3
REFERENCES..............................................................................................................................................13
APPENDIX..................................................................................................................................................15

INTRODUCTION
A comprehensive and realistic analysis of an existing or finished project is project evaluation. In
other words, project assessment is a method of gathering and evaluating data to understand the
development, performance, and efficacy of a project. In order to assess a project, there are a
range of project management techniques (Nesticò and Maselli, 2018). Techniques for project
management allow it easy and more reliable to execute tasks. They may be extended, irrespective
of size or business, to any enterprise. They can save time and minimize costs, and are used in
combination with project management techniques. The report is based on analysis of importance
of budgeting techniques irrespective to case or project of Volkswagen company. The project is
based on launching of an electric car and this project will be launched in market only after
critical evaluation.
The report contains detailed information about assessment of project of Volkswagen Company.
This has been done in accordance of different kinds of tools and techniques of project
management like stakeholder analysis, work break down structure etc.
MAIN BODY
Scope of project
The project is related to launching an electric car which can reduce dependency over fuel and
oil. As well as this project will also help in reducing pollution in environment (Elshaikh, Jiao and
Yang, 2018). There are many kinds of people in the corporate world and all of them have unique
goods and services with varying attitudes. This project is focused on the launching of electric
vehicles or car by Volkswagen which is a part of UK automotive industry. The introduction of
electric vehicles has been described as contributing to reducing CO2 pollution from the
atmosphere. In basic terms, it can be seen that electric car releases have a broad positive effect
on the environment. Because the use of petrol and gasoline engines and hybrid cars will
minimize emissions relative to petrol, diesel and gas will be affordable compared to electric
vehicles. Therefore, the air pollution will actually be decreased and this will have a detrimental
effect on the development of the British people and also on the atmosphere because they'll be
able to breathe fresh air free of CO2.

In addition, it can be seen that electric vehicles are a good option for the environment, since the
United Kingdom has a massive number and 90 out of 100 residents have their own cars, resulting
in immense emissions. If all these individuals continue to use electric vehicles, so there will be a
broad positive benefit to the economy, and the supply of CO2 will also be lowered. Therefore,
the launch of electric vehicles plays a major part in addressing environmental issues.
Below some key requirements of such project are mentioned:
To assess how electric vehicle releases, lead to the reduction of environmental issues.
To discover various ways in which the UK automotive industry can explore customer
attitudes towards electric cars
To investigate the influence of customer behavior on the efficiency of electric cars in the
UK market.
Work break down structure
A Work Breakdown Structure (WBS) is a process of breaking down to be involved in the
construction team in order to meet the project priorities and produce the necessary project
requirements (Andrews, Pepler and Motz, 2019). It is to define, predict, plan, and plan all of the
work found within the WBS. The Work Breakdown Framework (WBS) is intended to establish a
mutual view of the project complexity. It is a bureaucratic summary of the work to be performed

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Critical Evaluation of a Project
|15
|3823
|162

Electric vehicles and sustainability
|10
|2731
|362

Influence of Electric Car Launch on Consumer Attitude towards UK Car Industry
|12
|3703
|23

The impact of electric cars on sales of diesel or petrol cars in London
|39
|9693
|48

Effectiveness of UK Policy on Banning New Diesel and Petrol Sales
|12
|2765
|36

Integrated Marketing Communication Plan Of Toyota
|17
|4428
|217