logo

WORK PACKAGE 1 WORK PACKAGE: Our Language is Important

6 Pages680 Words141 Views
   

Added on  2020-02-24

About This Document

WORK PACKAGE 1 WORK PACKAGE Project Name: Our language is important Work package 2 Work package 1: Selection of theme 2 Bibliography 5 Work package Organizations Work package 1: Selection of theme Project Name: Our Language is Important Work package ID: 1.1 Work package name: Selection of theme Work package description: A theme is selected for the project as “Our language is important”. As the project is based on integration of language into the CQU university campus, therefore “Our language is important” is selected as the theme

WORK PACKAGE 1 WORK PACKAGE: Our Language is Important

   Added on 2020-02-24

ShareRelated Documents
Running head: WORK PACKAGEProject Name: Our language is importantName of the Student:Name of the University:
WORK PACKAGE 1 WORK PACKAGE: Our Language is Important_1
1WORK PACKAGETable of ContentsWork package..................................................................................................................................2Work package 1: Selection of theme...........................................................................................2Bibliography....................................................................................................................................5
WORK PACKAGE 1 WORK PACKAGE: Our Language is Important_2
2WORK PACKAGEWork packageWork package 1: Selection of themeProject Name: Our Language is ImportantWork package ID: 1.1Work package name: Selection of themeWork package description:A theme is selected for the project as “Our language isimportant”. The School of Engineering and Technology (SET)Indigenisation Committee is interested into promotion of theinclusion of indigenous perspectives within SET unit curriculumsand cultural awareness. The language translation services areincluded of translation of written and electronic materials. Thetranslation is done as per client requirements. As the project isbased on integration of language into the CQU universitycampus, therefore “Our language is important” is selected as thetheme of the project. Person authorized: Project Manager and Work package team leaderTechniques, Processes andProcedures1. Decision making processes: The project manager takes theresponsibility to take decision on which and what type of themeshould be suitable for the project. 2. Prepare the students and organize them into group3. MoSCoW prioritization technique: It is used fordevelopment of project management method to reach commonunderstanding with the stakeholders on importance they put ondelivery of every requirement.Development InterfacesUser Interface: Both the user and computer system are interactedwith providing of the inputs devices and system required
WORK PACKAGE 1 WORK PACKAGE: Our Language is Important_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
PPMP20008 Work Breakdown Structure and Work Package
|7
|844
|99

Case Study Project Management
|6
|970
|150

Importance of Languages in CQU University Campus ID
|6
|904
|223

Project Documentation Work Package Assignment
|7
|1461
|154

PPMP20008 Work Breakdown Structure and Work Package Assignment
|7
|967
|132

Assignment | Project Management Concepts
|11
|2330
|160