Running head: DENVER AIRPORT PROJECT CONSTRUCTION
Proj6010 Project Management Application: Denver Airport Project Construction
Name of the student:
Name of the university:
Proj6010 Project Management Application: Denver Airport_1

1DENVER AIRPORT PROJECT CONSTRUCTION
Table of Contents
Introduction......................................................................................................................................2
Module 1..........................................................................................................................................3
1. Part A: Project influence..............................................................................................................3
1.1 From PESTLE perspectives analysis of the Denver Case project.........................................3
1.2 For project preparation the necessary steps those have been undertaken..............................4
1.3 Evaluation the project decision to be build............................................................................6
Module 2..........................................................................................................................................7
2. Part B: Assessing project viability...............................................................................................7
2.1Decisions to be undertaken for project feasibility..................................................................7
2.2 Assessing the approach of project size and scale..................................................................7
2.3 Analyzing the need for project estimation.............................................................................8
2.4 Explanation on how the importance of the decisions could be determined..........................8
Module 3..........................................................................................................................................9
3. Part C: Project planning...............................................................................................................9
3.1Analyzing the role of each phase of project planning............................................................9
Conclusion.....................................................................................................................................12
References......................................................................................................................................13
Proj6010 Project Management Application: Denver Airport_2

2DENVER AIRPORT PROJECT CONSTRUCTION
Proj6010 Project Management Application: Denver Airport_3

3DENVER AIRPORT PROJECT CONSTRUCTION
Introduction
This project the importance of considering all the construction standards while
developing any construction based projects. With the help of the construction level project
standard the developing companies would be able to gain effective market revenue and
measurable success from the marketplace as well. After analyzing the background of Denver
case project, it would be able to analyze the details of Denver construction sector. It has been
found that in order to analyze the critical factors in this specific market domain the global project
management practices and processes including the project development strategies for addressing
the project specificities are elaborated in this report. In order to reduce the project complexity
proper range of construction project tools and technologies are also elaborated in this report.
After analyzing the Denver case project, from PESTLE perspectives, the analysis impact,
the importance of each of the project activities for project success are illustrated in this report. In
addition to this, for establishing the construction project successfully, it is necessary for the
project manager to make accurate project decision as well. It would help the project manager to
make effective decision for assessing the project viability is also illustrated in this report. Apart
from this, in order to build the construction project it is necessary to make proper cost estimation
and time allotment as well. The last and most vital part of the project is project planning phase.
In this phase, the role of each undertaken project plans and its positive impact for the successful
project outcome are elaborated it his report.
Proj6010 Project Management Application: Denver Airport_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management: A case Study of Denver Airport
|11
|2565
|433

Case Study Analysis: Leadership Challenges in Project Failure
|13
|3384
|155

Project Application Construction Management
|10
|2527
|166

Denver International Airport Baggage Report
|10
|4276
|60

Denver International Airport Project Management | Report
|12
|2488
|113

Project Management Application for Denver Airport Project
|12
|2588
|273