Design-Build-Operate Model for Project Delivery System
This lesson discusses the challenges faced by contractors and construction management firms when performing projects in foreign countries.
8 Pages1464 Words97 Views
Added on 2023-06-15
About This Document
This paper discusses the Design-Build-Operate (DBO) model for project delivery system, which involves a third party responsible for completing the project on time and carrying out its maintenance operation throughout the project life. The paper covers the responsibilities, advantages, project life cycle cost, procurement methods, concern areas, and structure of the DBO model. The language barrier is identified as a major concern area in the DBO model. The DBO model is a cost-effective development scheme and is widely accepted by the private sector of the corporate area.
Design-Build-Operate Model for Project Delivery System
This lesson discusses the challenges faced by contractors and construction management firms when performing projects in foreign countries.
Added on 2023-06-15
ShareRelated Documents
End of preview
Want to access all the pages? Upload your documents or become a member.
Contract and Procurement Management Plan for Greenwich Private Limited
|14
|2801
|302
Contract Management Concepts Assignment
|13
|2893
|102
Construction Project Delivery Systems and Procurement Practices
|35
|10048
|348
Choosing a Project Delivery Method - Design-Build Done Right Primer
|8
|2718
|136
Ethics & Professional Practice Report 2022
|15
|2722
|12
Project Delivery Methods, Financial Contract Types, and Procurement Methods for a Hospital Construction Project
|8
|2090
|49