DESIGNING A NETWORK IMPLEMENTATION
PROJECT
COMMUNICATIONS MANAGEMENT PLAN
Version <1.0>
07/11/2019
[Insert appropriate disclaimer(s)]
PROJECT
COMMUNICATIONS MANAGEMENT PLAN
Version <1.0>
07/11/2019
[Insert appropriate disclaimer(s)]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
<Project Name>
VERSION HISTORY
Version
#
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
Page 2 of 6
[Insert appropriate disclaimer(s)]
VERSION HISTORY
Version
#
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
Page 2 of 6
[Insert appropriate disclaimer(s)]
<Project Name>
TABLE OF CONTENTS
1 INTRODUCTION...........................................................................................................5
1.1 Purpose of Communications Management Plan...........................................5
2 STAKEHOLDER IDENTIFICATION AND ANALYSIS.................................................5
3 COMMUNICATIONS VEHICLES.................................................................................5
3.1 Communications Matrix..................................................................................5
3.1.1 Project Meetings........................................................................................5
3.1.2 Project Reporting......................................................................................6
3.1.3 Other Communication Vehicles................................................................6
APPENDIX A: REFERENCES..........................................................................................8
APPENDIX B: KEY TERMS..............................................................................................9
Page 3 of 6
[Insert appropriate disclaimer(s)]
TABLE OF CONTENTS
1 INTRODUCTION...........................................................................................................5
1.1 Purpose of Communications Management Plan...........................................5
2 STAKEHOLDER IDENTIFICATION AND ANALYSIS.................................................5
3 COMMUNICATIONS VEHICLES.................................................................................5
3.1 Communications Matrix..................................................................................5
3.1.1 Project Meetings........................................................................................5
3.1.2 Project Reporting......................................................................................6
3.1.3 Other Communication Vehicles................................................................6
APPENDIX A: REFERENCES..........................................................................................8
APPENDIX B: KEY TERMS..............................................................................................9
Page 3 of 6
[Insert appropriate disclaimer(s)]
<Project Name>
1 INTRODUCTION
1.1 PURPOSE OF COMMUNICATIONS MANAGEMENT PLAN
The communication management plan is defined as an important aspect of
project. This plan determines the success criteria of a certain project based on
meeting with the needs of information for project stakeholders. The Network
Design Implementation Project describes the structure of the project and different
methods for collecting information.
The anticipated audience for the project is the Project Manager, Manager, Senior
Systems Architect and Branch Office Manager. They would be responsible for
maintaining the communications between the team performing the design project.
2 STAKEHOLDER IDENTIFICATION AND ANALYSIS
Name Title Contact Communication Vehicle Comments
James T.
Kirk
Manager james.85@gmail.com Internal meeting,
face-to-face
interaction, video
conference
Email
Deana Troy Senior
Systems
Architect
troy.deana@yahoo.com face-to-face
interaction, email
reports
Email
Jack
Crusher
Branch
Office
Manager
Jackcrusher24@gmail.co
m
face-to-face
interaction,
internal reports
Email,
phone
To be filled Project
Manager
To be filled face-to-face
interaction
Email
3 COMMUNICATIONS VEHICLES
3.1 COMMUNICATIONS MATRIX
Vehicle Target Description
Purpose
Frequenc
y
Owner Distributio
n
Vehicle
Internal/
External
Comments
Face-to-
face
meeting
s
Senior
Systems
Architec
t
They would
be notified
about the
progress of
the network
design layout.
Daily Project
Manager
Face-to-
face
meetings
Internal
Email Manage
r
They would
be informed
about the
progress over
the plan and
work progress
Weekly Project
Manager
, Senior
Systems
Architect
Email External
Email,
phone
Branch
Office
Manage
r
They would
be informed
about any
form of
specific
details that
might be
Weekly Project
Manager
Email,
phone
Internal
Page 4 of 6
[Insert appropriate disclaimer(s)]
1 INTRODUCTION
1.1 PURPOSE OF COMMUNICATIONS MANAGEMENT PLAN
The communication management plan is defined as an important aspect of
project. This plan determines the success criteria of a certain project based on
meeting with the needs of information for project stakeholders. The Network
Design Implementation Project describes the structure of the project and different
methods for collecting information.
The anticipated audience for the project is the Project Manager, Manager, Senior
Systems Architect and Branch Office Manager. They would be responsible for
maintaining the communications between the team performing the design project.
2 STAKEHOLDER IDENTIFICATION AND ANALYSIS
Name Title Contact Communication Vehicle Comments
James T.
Kirk
Manager james.85@gmail.com Internal meeting,
face-to-face
interaction, video
conference
Deana Troy Senior
Systems
Architect
troy.deana@yahoo.com face-to-face
interaction, email
reports
Jack
Crusher
Branch
Office
Manager
Jackcrusher24@gmail.co
m
face-to-face
interaction,
internal reports
Email,
phone
To be filled Project
Manager
To be filled face-to-face
interaction
3 COMMUNICATIONS VEHICLES
3.1 COMMUNICATIONS MATRIX
Vehicle Target Description
Purpose
Frequenc
y
Owner Distributio
n
Vehicle
Internal/
External
Comments
Face-to-
face
meeting
s
Senior
Systems
Architec
t
They would
be notified
about the
progress of
the network
design layout.
Daily Project
Manager
Face-to-
face
meetings
Internal
Email Manage
r
They would
be informed
about the
progress over
the plan and
work progress
Weekly Project
Manager
, Senior
Systems
Architect
Email External
Email,
phone
Branch
Office
Manage
r
They would
be informed
about any
form of
specific
details that
might be
Weekly Project
Manager
Email,
phone
Internal
Page 4 of 6
[Insert appropriate disclaimer(s)]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
<Project Name>
needed.
3.1.1 Project Meetings
Meeting Description
Purpose
Frequency Owner Internal/
External
Comments/
Participants
Project
plan
meeting,
technical
plan
meeting
Progress of project
and proper network
design
Weekly Project
manager
Internal
Project
completion
meeting
Status of project
completion and
success status
Weekly Project
manager,
Senior
Systems
Architect
External
3.1.2 Project Reporting
Meeting Description
Purpose
Frequency Owner Internal/
External
Comments/
Distribution
List
Daily status
report
Describing the
daily update status
of tasks done for
the network design
Daily Project
manager
Internal
Amendment
s in project
progress
Asking for any form
of changes within
the implemented
plan
Weekly Project
Manager,
Senior
Systems
Architect
Internal
3.1.3 Other Communication Vehicles
Vehicle Description
Purpose
Frequency Owner Internal/
External
Comments/
Distribution
List
Email Describing the
work progress
activity for each
tasks
Weekly Project
manager
Internal
Page 5 of 6
[Insert appropriate disclaimer(s)]
needed.
3.1.1 Project Meetings
Meeting Description
Purpose
Frequency Owner Internal/
External
Comments/
Participants
Project
plan
meeting,
technical
plan
meeting
Progress of project
and proper network
design
Weekly Project
manager
Internal
Project
completion
meeting
Status of project
completion and
success status
Weekly Project
manager,
Senior
Systems
Architect
External
3.1.2 Project Reporting
Meeting Description
Purpose
Frequency Owner Internal/
External
Comments/
Distribution
List
Daily status
report
Describing the
daily update status
of tasks done for
the network design
Daily Project
manager
Internal
Amendment
s in project
progress
Asking for any form
of changes within
the implemented
plan
Weekly Project
Manager,
Senior
Systems
Architect
Internal
3.1.3 Other Communication Vehicles
Vehicle Description
Purpose
Frequency Owner Internal/
External
Comments/
Distribution
List
Email Describing the
work progress
activity for each
tasks
Weekly Project
manager
Internal
Page 5 of 6
[Insert appropriate disclaimer(s)]
<Project Name>
Communications Management Plan approval
The undersigned acknowledge they have reviewed the Network Design
Implementation Project Communications Management Plan and agree with the
approach it presents. Changes to this Communications Management Plan will be
coordinated with and approved by the undersigned or their designated
representatives.
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Page 6 of 6
[Insert appropriate disclaimer(s)]
Communications Management Plan approval
The undersigned acknowledge they have reviewed the Network Design
Implementation Project Communications Management Plan and agree with the
approach it presents. Changes to this Communications Management Plan will be
coordinated with and approved by the undersigned or their designated
representatives.
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Page 6 of 6
[Insert appropriate disclaimer(s)]
1 out of 6
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.