logo

Development of Project Management System

   

Added on  2022-12-19

6 Pages758 Words43 Views
 | 
 | 
 | 
Running head: CREATION OF PROJECT MANAGEMENT SYSTEM
Creation of project management system
Enter: Name of the Student
Enter: Name of the University
Author note
Development of Project Management System_1

DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
1
Table of Contents
Project Requirements.......................................................................................................................2
Project Effort Monitoring and Tracking..........................................................................................3
Reference.........................................................................................................................................4
Development of Project Management System_2

DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
2
Comprehensive Plan
Project Requirements
The non-functional and functional requirements of the new software which can be
accessed and modified by the users as described as below:
Functional Requirements: The new software will wait for data to be accessible from
administrators. Each of the users must be signing up the software with personal details
such as name, role in the projects and experience of working in similar projects and
contact details. New projects can be added or dropped within a project or project
extension can be managed using the new software [4]. Measuring of the constraints will
be an integrated part of the new system. The new software will be supporting the overlay
applications and mobile network support as well. Thus, the entire process of a project can
be managed using the new software.
Non-functional requirements: The non-functional requirements includes the products
requirements which are aligned with the project requirements, it will also consider the
user interface of the new system and the human factors. The user of this new system must
have all the basic idea about the functionality of the new system so that the efficiency of
the software is maintained [3]. Tracking of the project records and updating will be done
in an organized manner by this new software as well. The new system will not have any
compatibility or maintainability issue which can affect the project. Thus, all the quality
attributes of the project will be considered by this new system.
Development of Project Management System_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents