Ask a question from expert

Ask now

Different Procurement Routes

4 Pages572 Words189 Views
   

Added on  2019-12-28

Different Procurement Routes

   Added on 2019-12-28

BookmarkShareRelated Documents
ALTERNATIVEPROCUREMENTROUTES
Different Procurement Routes_1
To Adrin, We have been basically working on the two projects but still the working speeds of theprojects are different from one another. The construction speed’s main emphasis is on themethod which is adopted by the organization for carrying out its construction. There are differentprocurement routes such as construction management, custom build, emerging cost contracts etc.So to make the work faster, Trad-Build needs to adopt the effective strategy. It has beenwitnessed that the major delay in construction Trad-Build factory because of the procurement ofraw materials which are required in the site. The problem is that the construction managementprocurement route is not good for this industry. There are different contractors involved in thework so they are taking their own time to complete it. This is basically hindering the workprocess of the Trad-Build factory. So in tyhis case, design and build is the procurement routewhich has been advised. On the other hand, in case of Trad-Build factory as most the materials which are used inthe factory have been imported from other country. Due to this, there is delay in the work. As thematerial has not been arrived so in this case, the sign of coming soon has been built on the road.On the other hand, the procurement routes which have been selected were the traditionalprocurement route which was not good for the progress of the building. So in this case, as theconsultant, it is advisable to design and build where all the responsibilities are in the hands ofone contractor. This is the best design because in this, the contractor focuses on one project onlywhich gives full time to the construction. On the other hand, regarding the price also theconstructors give the price limit in advance this will help in estimating the cost in construction.On the other hand, in the traditional process, the cost incurred is more as compare to this. Besides this, the procurement route which can be adopted by the Trad-Build factory isthat the main contractor can be adopted to design the construction works. This will help the firmto monitor the activity effectively. Besides this, all the responsibility will be in the hands of thecontracts. He is the one who will be responsible for the procurement of the goods and services.even the most important part will be that in the construction process, he will be the one who willgive input in the design and the decision making process. Through the different trade contractors,it takes time as well as the quality is also hampered. Regarding the risk, design and build is thesafest because the whole and sole power is in the hands of the contractor so the risk attached islow. So in case of the Trad-Build factory it is advisable to adopt the design and build
Different Procurement Routes_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Construction Law: Types of Contract and Procurement Route
|10
|3277
|71

Procurement Routes for Central Queensland University
|16
|2603
|74

Presentation on Contract and Procurement Management
|17
|1031
|76

Assignment What are project delivery methods?
|14
|3981
|43

Civil Engineering | Assessment | 1
|11
|2948
|18

Professional Practice in Construction Research Paper 2022
|19
|3202
|30