Demolition Plan for Eastwood Centre Building

This report provides a brief outline of the works required to demolish the existing buildings on the Eastwood Centre site to be redeveloped into a mixed use development consisting of retail, residential and commercial components.

14 Pages2516 Words256 Views
   

Added on  2023-06-15

About This Document

This paper provides a detailed demolition plan for the Eastwood Centre building, including pre-demolition activities, protective measures, equipment required, and demolition activities. The plan ensures public health, traffic, environment, and neighboring structures are not affected by the demolition activities. The paper also includes a site plan of the building in relation to surrounding structures.
No documents found. Try with a different documents.
Related Documents
Demolition Plan for Blue Mountains College: Techniques and Procedures for Safer and Resourceful Demolition
|19
|3832
|470

Demolition Plan for New Facility for Beauty Therapy and Complementary Health Classrooms and Offices
|13
|2302
|135

Demolition Plan for Block B, Block C, Block D, and Block E
|10
|1366
|86

Standardized WHS Hazard/Risk Levels
|24
|2736
|182

Demolition Plan for Existing Dwelling: Risk Management, Planning, and Execution
|23
|2093
|58

Science and Materials: Site Layout, Materials, Hazards, and Precautions
|16
|4347
|355