Running head: ECHUCA-MOAMA BRIDGE
Echuca-Moama Bridge
Name of the Student
Name of the University
Author Note
Procurement Management Plan for Echuca-Moama Bridge Construction Project_1
ECHUCA-MOAMA BRIDGE
1
Table of Contents
Introduction................................................................................................................................2
Procurement management approach..........................................................................................3
Procurement definition...............................................................................................................3
Type of contract.........................................................................................................................5
Procurement Risks.....................................................................................................................5
Procurement risk management...................................................................................................5
Cost Determination....................................................................................................................6
Standardized procurement documentation.................................................................................6
Procurement constraints.............................................................................................................6
Contract Approval Process.........................................................................................................7
Decision Criteria........................................................................................................................7
Vendor Management..................................................................................................................7
Performance matrices.................................................................................................................8
Sponsor Acceptance...................................................................................................................8
Procurement schedule milestones..............................................................................................9
Evaluation criteria....................................................................................................................10
Bibliography.............................................................................................................................11
Procurement Management Plan for Echuca-Moama Bridge Construction Project_2
ECHUCA-MOAMA BRIDGE
2
Introduction
Located in the banks of river Murray and River Campaspe, Echuca is a small town in
the Victoria, Australia. The city has diverse categories of business which are increasing each
year at the population of the city is tangentially increasing year. This report will be focussing
on the creation of a bridge which will be connecting Echuca and Moama as the bride is
supposed to be very much beneficial for the regular visitors of the these two cities. This
construction project is being built in four stages in terms of the highway, construction of the
warren streets, building of the bridge over the two rivers Camaspe and Murray. The detailed
stages of this this project can be understood in a descriptive manner using the below pictorial
Procurement Management Plan for Echuca-Moama Bridge Construction Project_3
ECHUCA-MOAMA BRIDGE
3
diagram.
Figure 1: Stages of this construction project
(Source: Langr and Tvrdik 2015)
This report will be providing a detailed project procurement management plan which
will be discussing diverse aspects of procurements like defining the selected procurements,
contracts deployed in the project, mitigation of the risks of procurement, sponsor acceptance
Procurement Management Plan for Echuca-Moama Bridge Construction Project_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Procurement Management Plan
|9
|2371
|32

Report about Procurement and Contract Management 2022
|8
|2139
|30

ARBE2309: Construction Procurement and Tendering
|17
|4141
|68

Application of the PMBOK's 3 processes of project procurement
|9
|1977
|338

Procurement Management Plan for ABZ Construction Company
|21
|3395
|143

Latter of Invitation to Tenders
|17
|4439
|28