logo

CPCCBC4010B Apply Structural Principles to Residential Low Rise Constructions

8 Pages1733 Words245 Views
   

Apply structural principles to residential low rise constructions (CPCCBC4010B)

   

Added on  2020-04-13

CPCCBC4010B Apply Structural Principles to Residential Low Rise Constructions

   

Apply structural principles to residential low rise constructions (CPCCBC4010B)

   Added on 2020-04-13

ShareRelated Documents
Name: Course:Professor:Date:LA017855 Assessment6,CPCCBC4010B,Ed 4© New South Wales Technical and Further Education Commission, 2017(TAFE NSW), Archive version3,September 2017
CPCCBC4010B Apply Structural Principles to Residential Low Rise Constructions_1
Question 1Step 1: First, the analysis of the effect of the demolition of the dwelling will be carried out. This will ensure that a proper preventive mechanism is created to ensure the environmental protection is attained. Definition of the location area and status of the dwelling to be demolished. Step 2: Acquisition of the proper protective wear to ensure the health of the worker is protected will be acquired. Step 3: acquisition of the relevant license according to demolition class of the dwelling from the authorities. Step 3: Issue the notice 5 days before demolition activity to start. Step 4: proposed methods of demolition to be used in the planning document. Step 5: issue and indication of proposed methods of handling and disposing the asbestos materials and other hazardous material. Step 6: enhanced plan for the control and maintaining access to the demolishing area. Step 7: Before the start of the demolition activity, proper removal of the asbestos in the area will be carried out to enhance safety measures Step 8: Ensure that the demolition works to be carried out comply with work safety on OHS regulations and site requirements. Step 9: Planning requirements for the demolition works are met with proper strategy such that the demolition will not affect other activities within the region. Step 10: indication of the demolition sequence and indication of the demolition equipments to be used. Step 11: analysis of other services in the location and the manner which they will be handledduring the demolition activities. Step 12: confine the area where the demolition activity of demolition is taking place. Step 13: indication of the status and conditions of the adjoining structures and provide the mechanism which they will be protected from the demolition activity Step 14: provide emergency services to be stand by in case of any incident. Question 22LA017855 Assessment 6, CPCCBC4010B, Ed 4© New South Wales Technical and Further Education Commission, 2017(TAFE NSW), Archive version3,September 2017
CPCCBC4010B Apply Structural Principles to Residential Low Rise Constructions_2
Question 3Bushfire (medium risk)LA017855 Assessment6,CPCCBC4010B,Ed 4© New South Wales Technical and Further Education Commission, 2017(TAFE NSW), Archive version3,September 2017
CPCCBC4010B Apply Structural Principles to Residential Low Rise Constructions_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Construction and Building Assignment
|40
|6766
|220

Science and Materials: Site Layout, Materials, Hazards, and Precautions
|16
|4347
|355

LA017545 - Management Cluster on the Job Assessment
|10
|2048
|33