Critical Evaluation of Elizabeth Line Project Management
Verified
Added on 2023/06/08
|11
|3362
|493
AI Summary
This paper evaluates the program management of the Elizabeth Line project, including critical success and failure factors, lessons learned, and recommendations for successful execution. It also discusses the skills required to become a successful project manager.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Management Assessment 2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents Contents...........................................................................................................................................2 INTRODUCTION...........................................................................................................................1 MAIN BODY..................................................................................................................................1 Critical evaluation of the project chosen.....................................................................................1 Success and failure factors of this project...................................................................................2 Lesson learnt from this project....................................................................................................3 Recommendations for the successful execution of project..........................................................4 Reflective report of the project and skills which are required in order to become successful project manager...........................................................................................................................4 CONCLUSION................................................................................................................................6 REFERENCES................................................................................................................................8
INTRODUCTION The practice of managing all group activities such that they could successfully complete the program's objectives ahead of schedule is referred to as program managing(Altukhov, Predeus and Predeus, 2019). Program administrators typically keep track of the program's duration, size, and money while beginning and expanding it. Program administration entails a variety of crucial tasks, such as building a group such that they can start working and concentrate on the program results that the company expects. This paper focuses on the operation and management of several key components of the Elizabeth Line, a mass transit route in the Great Britain that runs via several trenches for more than 100 kilometres from Reading to Heathrow in the west. It was passed that the modern railroad track. On May 17, 2022, the Elizabeth line via the inaugural brand-new, underground passageways in Britain since the turn of the century opens. This analysis would involve a comprehensive assessment of the program as well as the determination ofcrucialperformancedriversandfailingcauses.Togetherwithsuggestionsforthe programmanaging professional route, it also includes the experience that was learned from this program.Thisstudywouldadditionallycovertheabilitiesneededtoexecuteprojects successfully. MAIN BODY Critical evaluation of the project chosen A railway connection connecting Reading and Heathrow in the west to Sheffield and Abbey Wood in the east will be built as part of the Cross Rail Line initiative. There would be 41 stops along the 100-kilometer railway route, which would run across the heart of Britain. In 2009, the program's anticipated budget was £17.8 billion, however in 2014, that figure was revised down to £14.8 billion(Borthick and Pennington, 2017). The work underwent an unprecedented amount of preparation, research, and layout prior it started. The company was enabled to decide on the best option for expenses and financing of the system via careful planning. The major strategy additionally included a list of the initiatives' major deliverables. The cross railway design standards, the program's ecological effect, and the distribution plan wereamongtheprogram'simportantoutcomeconsiderations.Additionally,aprogram management contract which was necessary for the success of the program was conveyed to the funders. The program made careful to include the projects execution partnership and the venture
programming associate as important critical stakeholders. 2019 was the projected completion date for the cross railway route construction. A concept of how the railway lines could result in quality standards and ethical purchasing led to the development of the cross rail line. Success and failure factors of this project Enhanced connectivity as from the road to the platforms, all Elizabeth destinations are thought to be step-free. The railway system anticipates removing the steps from such a location in the warmer months of 2022 too though(Dahlan, 2019). Restroom amenities as the hygiene and lavatory amenities are both enhanced by the railroad tracks, which also have the right cleansing supplies, sterilizing gear, and aeration. Employment at the terminals as the Elizabeth route channels are efficiently maintained and run to ensure the smooth operation of the rail network. The railroad route has performed more efficiently thanks to improved personnel and terminal expansion, and operational administration has improved to preserve consumer worth. Failure factors of this project Including the positive aspects, this program already has a number of reasons for operation failing that the institution must deal effectively, including the following: COVID-19 time as during the COVID-19 period, the railroads were subject to limitations that were bad for their expansion as no extra work can be done and thus it impacted the overall performance and thus leaving a bad consequence on the overall growth and development(Eisenberg, 2016). The major effects of these limitations have been a decrease in customer traffic. Individuals begin resisting using mass transportation since they are afraid of using it since they believe it is risky with hundreds of individuals travelling around at once. All types of transportation have been impacted by this emergency, and commercial transportation has indeed decreased since throughout the epidemic's driving producers and consumers really have to maintain the functioning of key operations. It has an impact on the worker concerns as well. Healthcare and safety aspect since security and wellbeing are major concerns for the public, Elizabeth Railroad faces several difficulties when doing their duties throughout epidemics. This would therefore have an impact on their employment, which is why they would have trouble finishing their assignment on schedule(Prihastuti, Wahyuni and Ramadhani, 2018). Together with making certain that the foundation of healthcare and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
security administration is maintained, they also require to establish and revise their strategies. Additionally, they would like to make permanent improvements that will enable company to address this issue and finish their program on schedule(Emiaso and Egbunike, 2018). Environmental protection asElizabeth Line's activities cause disturbances owing to sound, light, sediment,and other pollutants.When railroadsare builtor run, the surrounding environment is altered,which contributesto the decline of numerous organisms'ecologicalhabitats.Theytookdownalotofforestswhiletheywere operatingthat had an impact on the ecosystem and the species as well. The emissions generatedfromtransportationbuildingalsocontributetoglobalenvironmental devastation. The administration additionally issues the directive that they must cooperate on it in order to avoid problems(Masztalerz, 2016). Lesson learnt from this project It helps in understanding how to handle huge teams of individuals as well as how to maintain, organise, and oversee different tasks such that everyone works together to accomplish the proposal's objectives(Fleischer, 2021). Assessments of the organization's interior and exterior environmentsthat could be assessed with the use of numerous methods and approaches, are necessary for the effective implementation of a strategy. After a program has been evaluated, it is crucial to appraise its shortcomings and advantages as well as the program's overall performance. There are numerous further lessons that will be addressed as follows: Prioritizing operations as this program has taught the participants of the team how important it is to arrange respective tasks in accordance with their schedules. To avoid difficulties and issues during the program, it is necessary to accomplish project-related tasks that seem to be necessary on a previous premise with the assistance of each and every participant(Giacomini, Sicilia and Steccolini, 2016). Changing is static as when a digital distribution mechanism is used, it is determined that perhaps the surroundings does not stay unchanged and also that movement is the only element that really does. In order for a company to successfully perform and develop its needed and intended projects, strategies, methods, and techniques must be chosen based on the comparative context of the company.
Recommendations for the successful execution of project Following are a number of tips that the institution could adhere to when implementing and carrying out the proposal: Managing an efficient group is acompetent and skilled staff is crucial to the successful completion of the workthat would be a good thing. Setting the initiative objectives, purpose, and objectives is essential if the group is to effectively carry out the tasks and initiatives that support the initiative(Glushchenko, Yarkova and Kucherova, 2017). Continuously assess productivity and advancement as a programadministrators have a responsibility to routinely assess the effectiveness of their team colleagues following functions and processes have been put in place. It aids customers in identifying any drawbacks that might impact their business such that they might create plans and methods to deal with them as quickly and efficiently as feasible. Reflective report of the project and skills which are required in order to become successful project manager It demands experience and qualified personnel who really could handle the things connected to the technical components since this program was technology-based. Information collection and professional judgment are required for this program's assessment of domestic and foreign elements that contribute to program performance(Gonzalez and Mendoza, 2020). I've observed that collaboration helps with program implementation, and different social abilities additionally enable participants coordinate with one another because they could increase efficiency. The Elizabeth route program experienced numerous setbacks and difficulties, many of them have previously been covered in the study's preceding section. The delayed tale demonstrated how programadministration could be employed to properly carry out large-scale projects. The manner the Elizabeth Line transportation system was created did not incorporate a number of program administration principles, and the following are the key talents that a good program administrator needs to have: Commencement as the official agencies in responsibility of the railroad transportation route severely overestimated the amount of materials required for this undertaking, and that is why the railroad route seemed destined to experience continuous setbacks starting from its first beginnings(Hyndman and McKillop, 2019). Estimating the assets required
to complete the operation is a crucial need that, if disregarded, will cause significant hassles(Hyndman, 2016). Preparation as another of the key elements in programadministration entails effective capacity allocation and utilisation strategythat serves as the foundation for the timetables required to carry out the program. This stage of the program was inadequate in the context of the Elizabeth Line because there was no explicit backup preparedness in existenceineventofinterruptionsthatdeemedtobeimportantastheprogram experienced numerous delayed owing to the COVID-19 epidemic(Jarwal, 2018). Supervision as this stage of programadministration is crucial because it allows for continualassurancethattheprogramismovingforwardinaccordancewiththe established timelines. Whenever it concerns to the manner Elizabeth Line was put to restraints, there is certainly a great of effort that needs to be done in this regard. The building is seen as a magnificent but problematic endeavour in large measure as a result of the significant expenditures and setbacks(Jermias, Gani and Juliana, 2018). Efficientdataexchangeasinorderforaprogrammanagementtobeproductive, managers must have the ability to provide expertise and material at the appropriate period. I could efficiently interact with the group participantsthat reduces chance and mistakes and boosts efficiency and profitability across the board. With the aid of conversation, I could additionally forge deep bonds with my group colleagues and meet their requirements, allowing them to offer their beneficial benefits and the successful completion of the planning process(Khajavi and Mohammadian, 2018). Logical and psychological abilities such abilities would aid me in analysing the important data and concepts such that I could address any problems that may arise that could compromise the operation. I could successfully assess a scenario with the use of my cognitive capabilities, and I could rationally address associated difficulties using a variety of tactics and methods. The implementation, understanding, assessment, and composition skills that are necessary for a good program management are greatly aided by rational reflection(Kogut, Janshanlo and Czerewacz-Filipowicz, 2020). Applied knowledge as this ability aids in comprehending the ideathat is important for undertaking success. I could successfully instruct and mentor individuals because that they might execute as intended, assisting in the venture's overall goal-achieving success.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
In order to maintain a good flow of operations, it aids in increasing efficiency and performance and moreover assists with authority and responsibility delegation. This ability helps me prioritise activities such that I could effectively handle those who are already crucial in the beginning and teach staff members to pass on the necessary abilities (Kouaib, Jarboui and Mouakhar, 2018). Quality assessment as with the usageof this ability, I could oversee projects successfully since it aids in the assessment of possible threats that could negatively impact the program as a whole. Management must assess the vulnerabilities and mistakes from early phases in order to create tactics and objectives to mitigate such threats. I could efficiently evaluate the data and therefore could come up with a variety of alternate solutions to help the organization as a whole reduce risks, which really is good for the operation(Kure, Nørreklit and Raffnsøe-Møller, 2017). Technological knowledge as in addition to personal qualities, program managers must usually have technological knowledge to properly assess the technological aspects that may influence business projects. It assists in utilising a variety of cutting-edge techniques and technology while improving the efficiency and production of every group worker. I have the technologicalknow-how to use various tools to cut down on schedule and unnecessary expenses that could indeed have an impact on the program's finances(Li, 2018). CONCLUSION From the aforementioned data, it could be inferred that good program administration requires a variety of relevant abilities, information, methods, and approaches. According to evaluations, program administrators could utilise a variety of tools with the aid of diverse abilities to increase the output and efficiency of every individual operating on that specific program. Program administration places a strong emphasis on allocating tasks amongst team workers such that they could each complete them to the best of their abilities and experience. In the early phases of the initiative, appropriate objectives, purpose, and funding must be developed such that participants could accomplish their aims as planned. It is the responsibility of the program management to make sure that group participantsare aware of their individual responsibilities, goals, and standards such that they may organise their procedures accordingly. This paper offers a comprehensive assessment of the initiative as well as information on its able
to succeed and unsuccessful elements. In order for the program management to conduct the venture in an efficient and efficacious way, the program includes the learning that would have been learned from the program as well as suggestions. In this paper, certain talents that are necessary to remain a successful program management are described.
REFERENCES Books and journals Altukhov, P. V., Predeus, N. V. and Predeus, J. V., 2019, June. Development of the Elements of theMechanismAccountingandAnalyticalSupportofEconomicSecurityof Construction Enterprises. InIOP Conference Series: Earth and Environmental Science (Vol. 272, No. 3, p. 032205). IOP Publishing. Borthick, A. F. and Pennington, R. R., 2017. When data become ubiquitous, what becomes of accounting and assurance?.Journal of Information Systems.31(3). pp.1-4. Dahlan, M., 2019. Analysis of interrelationship between usefulness of management accounting systems, interactive budget use and job performance.Management Science Letters,9(7), pp.967-972. Eisenberg, P., 2016. The Balanced Scorecard and Beyond–Applying Theories of Performance Measurement,EmploymentandRewardsinManagementAccountingEducation. International Research Journal of Management Sciences.4(7). pp.483-491. Emiaso,D.andEgbunike,A.P.,2018.Strategicmanagementaccountingpracticesand organizational performance of manufacturing firms in Nigeria.Journal of Accounting and Financial Management.4(1). pp.10-18. Fleischer,N.I.,2021.KIT-StudiumundLehre-LehrstuhlfürManagementAccounting- Abschlussarbeiten-abgeschlossene Arbeiten. Giacomini,D.,Sicilia,M.andSteccolini,I.,2016.Contextualizingpoliticians’usesof accounting information: reassurance and ammunition.Public Money & Management. 36(7). pp.483-490. Glushchenko, A. V., Yarkova, I. V. and Kucherova, Y. P., 2017, December. The Role of the Ecologically-Oriented Accounting Systems from the Perspective of Minimizing the Strategic Risks in Terms of Ecologizing the Production. InPerspectives on the use of New Information and Communication Technology (ICT) in the Modern Economy(pp. 741-747). Springer, Cham. Gonzalez, C. C. and Mendoza, K. H., 2020. Green accounting in Colombia: a case study of the mining sector.Environment, Development and Sustainability. pp.1-13. Hyndman, N. and McKillop, D., 2019. Accounting for the Public Sector at a Time of Crisis. Hyndman, N., 2016. Accrual accounting, politicians and the UK—with the benefit of hindsight. Public Money & Management.36(7). pp.477-479. Jarwal, C.S., 2018. Management Accounting: A Tool to Achieve Entrepreneurial Goals.IUP Journal of Accounting Research & Audit Practices,17(4). Jermias, J., Gani, L. and Juliana, C., 2018. Performance Implications of Misalignment Among BusinessStrategy,LeadershipStyle,OrganizationalCultureandManagement AccountingSystems.LeadershipStyle,OrganizationalCultureandManagement Accounting Systems (January 9, 2018). Khajavi, S. and Mohammadian, M., 2018. Accounting for citizenship conceptual paradigm based on critical thinking.Management Accounting.11(37). pp.97-106. Kogut, O. Y., Janshanlo, R. E. and Czerewacz-Filipowicz, K., 2020. Human capital accounting issues in the digital economy. InDigital Transformation of the Economy: Challenges, Trends and New Opportunities(pp. 296-305). Springer, Cham.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Kouaib, A., Jarboui, A. and Mouakhar, K., 2018. CEOs’ accounting-based attributes and earnings management strategies under mandatory IFRS adoption.Journal of Applied Accounting Research. Kure, N., Nørreklit, H. and Raffnsøe-Møller, M., 2017. 10 Language Games of Management Accounting—ConstructingIllusionsorRealities?.APhilosophyofManagement Accounting: A Pragmatic Constructivist Approach, p.211. Li,H.,2018.Unconditionalaccountingconservatismandrealearningsmanagement. International Journal of Financial Research.9(2). pp.203-215. Masztalerz,M.,2016.Whynarrativesinaccounting?.PraceNaukoweUniwersytetu Ekonomicznego we Wrocławiu, (434), pp.99-107. Prihastuti, A., Wahyuni, S. and Ramadhani, S., 2018. THE USE OF SOCIAL MEDIA AS A LEARNINGMEDIAINIMPROVINGSTUDENTS’MOTIVATIONINTHE MANAGEMENT ACCOUNTING COURSE.International Journal of Educational Best Practices,2(2), pp.55-62.