Case Study Report on Program Management of Elizabeth Route
VerifiedAdded on 2023/06/04
|11
|3858
|277
AI Summary
This report evaluates the program management of Elizabeth Route, a section of mass transit in Great Britain. It includes an assessment of architectural and non-structural elements, determinants of project success and failure, causes for project failure, lessons learned, and recommendations for successfully completing the project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Case study report
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents
Contents...........................................................................................................................................2
INTRODUCTION...........................................................................................................................1
MAIN BODY..................................................................................................................................1
A thorough evaluation of the chosen programme........................................................................1
Architectural elements.................................................................................................................2
Non-structural elements...............................................................................................................3
Determinants of project success and failure................................................................................4
Causes for this project's failure....................................................................................................4
Lesson learnt from this project....................................................................................................5
Recommendations for successfully completing the project........................................................5
Reflective project assessment outlining the skills required for a project manager to be
successful.....................................................................................................................................6
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9
Contents...........................................................................................................................................2
INTRODUCTION...........................................................................................................................1
MAIN BODY..................................................................................................................................1
A thorough evaluation of the chosen programme........................................................................1
Architectural elements.................................................................................................................2
Non-structural elements...............................................................................................................3
Determinants of project success and failure................................................................................4
Causes for this project's failure....................................................................................................4
Lesson learnt from this project....................................................................................................5
Recommendations for successfully completing the project........................................................5
Reflective project assessment outlining the skills required for a project manager to be
successful.....................................................................................................................................6
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9
INTRODUCTION
In order for the group to successfully accomplish the project's objectives sooner than
anticipated, program administration is the practice of monitoring all group activities.
Management frequently keep a careful eye on the project's duration, size, and cost as it starts and
develops (Alziyadat and Ahmed, 2019). One of the most crucial tasks in project administration is
putting together a group so that participants may start working together and concentrating on the
project objectives the company desires. The report's objective is to identify an old, still-standing
low-rise housing building which was constructed before 1992 and define various aspects of the
building, including its layout, floor plans, superiority, insufficiencies, and so on in an attempt to
obtain a thorough grasp of the old houses in London. Innovating more would be made easier by
grasping the core concept. This study focuses on the management and operation of numerous key
components of the Elizabeth Route, a section of mass transit in the Great Britain that travels over
100 kilometres via several stations from Reading to Heathrow in the west. The modern railroad
route had already been built. Starting on May 17, 2022, the Elizabeth line will travel across the
first entirely contemporary, underground facilities built in Britain since the turn of the 20th
century. The programme will be carefully examined as part of this review, and the primary
determinants of success and failures would be noted. It includes insights learned from this
project in addition to suggestions for people thinking about a future in project manager. This
study would additionally explore the abilities needed to successfully execute tasks.
MAIN BODY
A thorough evaluation of the chosen programme
A railway would've been built as part of the Cross Railway Line plan to connect Reading
and Heathrow in the west with Sheffield and Abbey Wood in the east. There will be 41 stops
along the 100-kilometer railway route which runs across the heart of Britain. In 2009, £17.8
billion had been the estimated price of the construction; in 2014, that figure had dropped to £14.8
billion. The work needed an unprecedented amount of preparation, research, and construction
prior it could start. The company was able to make the best decision for pricing and capital
financing thanks to careful planning. The major strategy additionally included an overview of
each project's main goals (Bozdo, 2020). The crossings of railway vital criteria, the project's
ecological effects, and the business model have been a few of the main project outcome issues. A
In order for the group to successfully accomplish the project's objectives sooner than
anticipated, program administration is the practice of monitoring all group activities.
Management frequently keep a careful eye on the project's duration, size, and cost as it starts and
develops (Alziyadat and Ahmed, 2019). One of the most crucial tasks in project administration is
putting together a group so that participants may start working together and concentrating on the
project objectives the company desires. The report's objective is to identify an old, still-standing
low-rise housing building which was constructed before 1992 and define various aspects of the
building, including its layout, floor plans, superiority, insufficiencies, and so on in an attempt to
obtain a thorough grasp of the old houses in London. Innovating more would be made easier by
grasping the core concept. This study focuses on the management and operation of numerous key
components of the Elizabeth Route, a section of mass transit in the Great Britain that travels over
100 kilometres via several stations from Reading to Heathrow in the west. The modern railroad
route had already been built. Starting on May 17, 2022, the Elizabeth line will travel across the
first entirely contemporary, underground facilities built in Britain since the turn of the 20th
century. The programme will be carefully examined as part of this review, and the primary
determinants of success and failures would be noted. It includes insights learned from this
project in addition to suggestions for people thinking about a future in project manager. This
study would additionally explore the abilities needed to successfully execute tasks.
MAIN BODY
A thorough evaluation of the chosen programme
A railway would've been built as part of the Cross Railway Line plan to connect Reading
and Heathrow in the west with Sheffield and Abbey Wood in the east. There will be 41 stops
along the 100-kilometer railway route which runs across the heart of Britain. In 2009, £17.8
billion had been the estimated price of the construction; in 2014, that figure had dropped to £14.8
billion. The work needed an unprecedented amount of preparation, research, and construction
prior it could start. The company was able to make the best decision for pricing and capital
financing thanks to careful planning. The major strategy additionally included an overview of
each project's main goals (Bozdo, 2020). The crossings of railway vital criteria, the project's
ecological effects, and the business model have been a few of the main project outcome issues. A
program management contract which was crucial to the project's longevity too was made
available to the contributors. The programme was very careful to acknowledge the project
execution partner and the business growth partner as essential players. The construction of the
railway grade crossover was once expected to be done in 2019. The crossover railway link was
built with the hope of it would encourage ethical codes and good standards.
Architectural elements
Edifice is built up of a few different components, including brickwork, columns, tunnels,
doors, and vents. The foundation and column are just a few of elementary examples of
foundation components. The platform to the northwest offers the most breathtaking
perspective of the structure, in which the rooftops, huge chimney columns, and remaining
staircase towers combine to provide a serene and unusually beautiful perspective. With
the exception of having just one window on each storey and one duct over the upper
framework to illuminate the ceilings, the homes in the two levels are comparable to those
located on the northern boundary (Chiarini and Vagnoni, 2017). There is a large enclave
containing what is defined as "an iron hanger erected on a cement bridge and presumably
utilised as a closet" at the eastern part of the space, facing the passage leading to the main
stairway, the chambers, and the entry to the walled area. Whenever the carpeting was
removed from the columns and the fence coverings were removed, the higher tier was left
exposed. There are still remnants of paintings on the eastern half of this flooring's walls.
The paintings featured dressed-up figures, some of whom were drawn and are presented
here. It appears that emerald tinting was frequently applied. On the south-western aspect
of the area, a separate rectangle courtyard's southern and western edges are still there.
Trees surround the home on all sides, and a pool of liquid can be seen southeast of it.
The basis of the southwestern part consists of a floor and three storeys. Two large
stairway structures which are roughly octagonal on the outside and circular on the inside
are joined to the corridor on the southern side of the area, which also has a square three-
story entry next to the southwestern building. In the courtyard, there seem to be three
spectacular marble pipe rises, and more may be seen rising from the roofs. On clusters of
octagonal foundations with attractive, well-designed set-offs, these feature sculpted tips
and bases. The stone chimney pieces, the sculpted chimney construction, the backgrounds
that may offer a chosen pediment over the entry, and the ornamental on the roofing are
available to the contributors. The programme was very careful to acknowledge the project
execution partner and the business growth partner as essential players. The construction of the
railway grade crossover was once expected to be done in 2019. The crossover railway link was
built with the hope of it would encourage ethical codes and good standards.
Architectural elements
Edifice is built up of a few different components, including brickwork, columns, tunnels,
doors, and vents. The foundation and column are just a few of elementary examples of
foundation components. The platform to the northwest offers the most breathtaking
perspective of the structure, in which the rooftops, huge chimney columns, and remaining
staircase towers combine to provide a serene and unusually beautiful perspective. With
the exception of having just one window on each storey and one duct over the upper
framework to illuminate the ceilings, the homes in the two levels are comparable to those
located on the northern boundary (Chiarini and Vagnoni, 2017). There is a large enclave
containing what is defined as "an iron hanger erected on a cement bridge and presumably
utilised as a closet" at the eastern part of the space, facing the passage leading to the main
stairway, the chambers, and the entry to the walled area. Whenever the carpeting was
removed from the columns and the fence coverings were removed, the higher tier was left
exposed. There are still remnants of paintings on the eastern half of this flooring's walls.
The paintings featured dressed-up figures, some of whom were drawn and are presented
here. It appears that emerald tinting was frequently applied. On the south-western aspect
of the area, a separate rectangle courtyard's southern and western edges are still there.
Trees surround the home on all sides, and a pool of liquid can be seen southeast of it.
The basis of the southwestern part consists of a floor and three storeys. Two large
stairway structures which are roughly octagonal on the outside and circular on the inside
are joined to the corridor on the southern side of the area, which also has a square three-
story entry next to the southwestern building. In the courtyard, there seem to be three
spectacular marble pipe rises, and more may be seen rising from the roofs. On clusters of
octagonal foundations with attractive, well-designed set-offs, these feature sculpted tips
and bases. The stone chimney pieces, the sculpted chimney construction, the backgrounds
that may offer a chosen pediment over the entry, and the ornamental on the roofing are
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
examples of subsequent Middle or Elizabethan design components. The hall's layout is
clearly in keeping with its characteristics as a middle-eastern structure, and the two
rotating framing stairs date the invention of the conventional Italian staircase. The old
wooden entryway, which is still present and attached to a sturdy, gently rounded
structure, has already been mentioned as blocking the window beneath the entrance
rooftop lights due of its placement (Choi, Chan and Yue, 2016).
Non-structural elements
The flat was formerly a beautiful space, measuring 5 metres by 21 feet, with a screens
and fireplace, three windows facing north and two facing south, and the necessary
furnishings. It has been split in two and completely redone. A substantial niches that
overlooks the passage connecting to the main stairway, the chambers, and the entry to the
private garden is located on the floor's eastern edge. It looks to be a matching countertop
and includes a metal stack which is elevated on a concrete brick entrance. Whenever a
gateway from the south-western hallway goes into a lower unit over the entry, an opening
appears on a place covering about 3 feet 6 inches height below the ground of the chamber
and the rooftop ceiling beyond.
The servants' stairs on the south-western side of the property nevertheless appears to be
completely renovated. The noisy Tudor-style stairway that connected to all levels of the
house were held by the main wire linked column that was made of three wood stems and
extended from the bottom level to the roofs. Its main feature was the wire links column of
the winding stairway (Cruciani, 2017). It's constructed by piling two oaks timber trees on
top of each other. Each stairway was carved out of the pillar before the concrete
framework was constructed around it. The Southern Circle has stayed completely
unharmed and is still available to visitors today, but the Eastern Circle deteriorated and
was demolished in the late 19th century.
The panels measure 18 inches in height, 11 inches in width, and 11 inches in depth. The
function of these recesses, which are widely found in the yard edges of buildings from the
1600s, has become the subject of considerable conjecture. While a broad area is
decorated with miniature emblems and flowers, the granite edge over the gateway
alternates between someone being circular and being draped with flowers and foliage.
clearly in keeping with its characteristics as a middle-eastern structure, and the two
rotating framing stairs date the invention of the conventional Italian staircase. The old
wooden entryway, which is still present and attached to a sturdy, gently rounded
structure, has already been mentioned as blocking the window beneath the entrance
rooftop lights due of its placement (Choi, Chan and Yue, 2016).
Non-structural elements
The flat was formerly a beautiful space, measuring 5 metres by 21 feet, with a screens
and fireplace, three windows facing north and two facing south, and the necessary
furnishings. It has been split in two and completely redone. A substantial niches that
overlooks the passage connecting to the main stairway, the chambers, and the entry to the
private garden is located on the floor's eastern edge. It looks to be a matching countertop
and includes a metal stack which is elevated on a concrete brick entrance. Whenever a
gateway from the south-western hallway goes into a lower unit over the entry, an opening
appears on a place covering about 3 feet 6 inches height below the ground of the chamber
and the rooftop ceiling beyond.
The servants' stairs on the south-western side of the property nevertheless appears to be
completely renovated. The noisy Tudor-style stairway that connected to all levels of the
house were held by the main wire linked column that was made of three wood stems and
extended from the bottom level to the roofs. Its main feature was the wire links column of
the winding stairway (Cruciani, 2017). It's constructed by piling two oaks timber trees on
top of each other. Each stairway was carved out of the pillar before the concrete
framework was constructed around it. The Southern Circle has stayed completely
unharmed and is still available to visitors today, but the Eastern Circle deteriorated and
was demolished in the late 19th century.
The panels measure 18 inches in height, 11 inches in width, and 11 inches in depth. The
function of these recesses, which are widely found in the yard edges of buildings from the
1600s, has become the subject of considerable conjecture. While a broad area is
decorated with miniature emblems and flowers, the granite edge over the gateway
alternates between someone being circular and being draped with flowers and foliage.
Determinants of project success and failure
A better link since it's thought that all Elizabeth sites are step-free from the street to the
amenities. The railway organisation anticipates removing the grades from that location in
the summers of 2022 too though (Delkhosh and Mousavi, 2016).
To successfully maintain and run the Elizabeth transport cables and ensure the smooth
operation of the train line network, personnel at the installations are required. The railway
route has run more efficiently, and operational administration has been reinforced to
preserve consumer worth as a result of increasing manpower and facilities development.
Furthermore, the rail tracks have the right cleansing supplies, sterilisation tools, and
airflow which enhance both the hygiene and restroom amenities.
Causes for this project's failure
Along with its benefits, this project presently confronts a number of system failures that the
organisation must adequately address, including the following:
Environment protection because Elizabeth Path's activities disturb the calm due to sound,
illumination, garbage, and other pollutants. Every time a railroad is built or maintained,
the nearby environment is altered, which results in a reduction in the ecological
boundaries occupied by numerous creatures. They removed a lot of woods while they
were being used resulting in an impact on the ecosystem and different creatures. The
global ecology is being destroyed as a result of the pollution the vehicle sector produces.
Additionally, the administration advises that companies collaborate on it in order to avoid
difficulties (Dogru and Keskin, 2020).
Safety and health concerns since security and wellbeing are the foremost concerns for the
wider populace, Elizabeth Railroad faces several difficulties when doing its duties amid
epidemics. As a result, people may have difficulty completing their assignment by the
deadline since doing so would negatively impact their profession. Along with making
sure the principles of health and security measures are preserved, companies must
establish and maintain their programs. Additionally, they aim to create long-term reforms
which will aid the company in resolving this issue and finishing their project on schedule.
Due to constraints placed on the railroads during the COVID-19 stage, their expansion
was hampered since no further upkeep can be carried out. This resulted in a detrimental
impact on overall effectiveness as well as the economy and progress of the nation in its
A better link since it's thought that all Elizabeth sites are step-free from the street to the
amenities. The railway organisation anticipates removing the grades from that location in
the summers of 2022 too though (Delkhosh and Mousavi, 2016).
To successfully maintain and run the Elizabeth transport cables and ensure the smooth
operation of the train line network, personnel at the installations are required. The railway
route has run more efficiently, and operational administration has been reinforced to
preserve consumer worth as a result of increasing manpower and facilities development.
Furthermore, the rail tracks have the right cleansing supplies, sterilisation tools, and
airflow which enhance both the hygiene and restroom amenities.
Causes for this project's failure
Along with its benefits, this project presently confronts a number of system failures that the
organisation must adequately address, including the following:
Environment protection because Elizabeth Path's activities disturb the calm due to sound,
illumination, garbage, and other pollutants. Every time a railroad is built or maintained,
the nearby environment is altered, which results in a reduction in the ecological
boundaries occupied by numerous creatures. They removed a lot of woods while they
were being used resulting in an impact on the ecosystem and different creatures. The
global ecology is being destroyed as a result of the pollution the vehicle sector produces.
Additionally, the administration advises that companies collaborate on it in order to avoid
difficulties (Dogru and Keskin, 2020).
Safety and health concerns since security and wellbeing are the foremost concerns for the
wider populace, Elizabeth Railroad faces several difficulties when doing its duties amid
epidemics. As a result, people may have difficulty completing their assignment by the
deadline since doing so would negatively impact their profession. Along with making
sure the principles of health and security measures are preserved, companies must
establish and maintain their programs. Additionally, they aim to create long-term reforms
which will aid the company in resolving this issue and finishing their project on schedule.
Due to constraints placed on the railroads during the COVID-19 stage, their expansion
was hampered since no further upkeep can be carried out. This resulted in a detrimental
impact on overall effectiveness as well as the economy and progress of the nation in its
entirety. The main impact of these limitations has been a decrease in customer
interactions. Individuals begin to avoid taking mass transportation due to their afraid of it
and believe it to be unsafe with so many individuals traveling at once. All kinds of
transportation have been impacted by this catastrophe, and business public transportation
has decreased as a consequence. Producers and consumers were required to emphasize
maintaining essential operations functioning throughout the epidemic. It also has an
impact on worker security (Dumitru-Alexandru, 2016).
Lesson learnt from this project
It helps with understanding how to maintain track of, organise, and monitor multiple tasks
such that everyone works together to accomplish the project's objectives. It generally helps with
understanding how to handle big groupings of individuals. Assessments of the firm's interior and
exterior environments—which may be studied utilizing a range of approaches and strategies—
are necessary for a strategy to be effectively executed. After an analysis, it is crucial to evaluate
the program's overall efficiency as well as its advantages and flaws. Other topics that might be
explored include the foregoing:
Establishing objectives is crucial because this approach has taught the firm's participants
the importance of assigning the suitable tasks in accordance with their schedules. To
avoid problems and disagreements across the term, project-related tasks that seem to be
due on a constant schedule must be completed with everyone's participation.
When a computerised communication mechanism is used, it is found that perhaps the
ecosystem changes in certain way and that movement is the sole feature which actually
holds true. This indicates that change isn't progressing. In order to successfully execute
and expand its needed and intended efforts, a company must determine its strategies,
processes, and processes based on its highly comparative environment (Emiaso and
Egbunike, 2018).
Recommendations for successfully completing the project
The following basic guidelines may be helpful to the organisation when setting the strategy
into action and carrying it out:
The ability to lead a productive group of knowledgeable and seasoned workers is crucial
for the responsibility to be completed effectively. Defining the plan's aims, purpose, and
interactions. Individuals begin to avoid taking mass transportation due to their afraid of it
and believe it to be unsafe with so many individuals traveling at once. All kinds of
transportation have been impacted by this catastrophe, and business public transportation
has decreased as a consequence. Producers and consumers were required to emphasize
maintaining essential operations functioning throughout the epidemic. It also has an
impact on worker security (Dumitru-Alexandru, 2016).
Lesson learnt from this project
It helps with understanding how to maintain track of, organise, and monitor multiple tasks
such that everyone works together to accomplish the project's objectives. It generally helps with
understanding how to handle big groupings of individuals. Assessments of the firm's interior and
exterior environments—which may be studied utilizing a range of approaches and strategies—
are necessary for a strategy to be effectively executed. After an analysis, it is crucial to evaluate
the program's overall efficiency as well as its advantages and flaws. Other topics that might be
explored include the foregoing:
Establishing objectives is crucial because this approach has taught the firm's participants
the importance of assigning the suitable tasks in accordance with their schedules. To
avoid problems and disagreements across the term, project-related tasks that seem to be
due on a constant schedule must be completed with everyone's participation.
When a computerised communication mechanism is used, it is found that perhaps the
ecosystem changes in certain way and that movement is the sole feature which actually
holds true. This indicates that change isn't progressing. In order to successfully execute
and expand its needed and intended efforts, a company must determine its strategies,
processes, and processes based on its highly comparative environment (Emiaso and
Egbunike, 2018).
Recommendations for successfully completing the project
The following basic guidelines may be helpful to the organisation when setting the strategy
into action and carrying it out:
The ability to lead a productive group of knowledgeable and seasoned workers is crucial
for the responsibility to be completed effectively. Defining the plan's aims, purpose, and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
objectives is essential if the group is to effectively accomplish the actions and initiatives
that support the initiative.
Program administrators have a responsibility to routinely assess the effectiveness of the
individuals who make up their team after objectives and processes have been established.
This involves keeping an eye on advancement and productivity. It aids customers in
identifying any future operational issues so that they can create plans and programmes to
solve them as quickly and efficiently as feasible (Eyers and Naim, 2019).
Reflective project assessment outlining the skills required for a project manager to be successful
Since this product relies heavily on technologies, it needs workers with relevant expertise and
certification who could really effectively handle technical challenges. Information collection and
professional opinion are used to evaluate regional and global issues that influence project
efficacy. I've witnessed how teamwork improves project implementation, and different social
abilities likewise enable individuals to work together because they could increase efficiency.
Many of the difficulties and problems that the Elizabeth network project ran into have previously
been covered in the study's first section. The delayed tale served as an example of how project
administration could be leveraged to effectively finish significant projects. The Elizabeth
Channel transportation system wasn't designed with a range of project administration ideas in
mind, and the following are crucial abilities for a productive project manager:
Preparation that comprises an effective asset allocation and utilisation strategy that serves
as the foundation for the scheduling required to carry out the project, is yet another
crucial aspect of project administration. This stage of the project was inadequate in the
context of the Elizabeth Line because there was no clear plan in position in the event of
disturbances that were considered to be substantial as the project experienced numerous
delayed owing to the COVID-19 epidemic.
Supervision is necessary at this stage of project administration because it allows for
continuing confirmation that the project is moving forward in accordance with the
established timelines. Certainly, there is a much of effort to be done in this respect,
particularly when it relates to how Elizabeth Line was restricted. The undertaking is seen
as a beautiful yet challenging endeavour due to the significant expenditures and
difficulties (Ferro, Ordóñez and Anholon, 2017).
that support the initiative.
Program administrators have a responsibility to routinely assess the effectiveness of the
individuals who make up their team after objectives and processes have been established.
This involves keeping an eye on advancement and productivity. It aids customers in
identifying any future operational issues so that they can create plans and programmes to
solve them as quickly and efficiently as feasible (Eyers and Naim, 2019).
Reflective project assessment outlining the skills required for a project manager to be successful
Since this product relies heavily on technologies, it needs workers with relevant expertise and
certification who could really effectively handle technical challenges. Information collection and
professional opinion are used to evaluate regional and global issues that influence project
efficacy. I've witnessed how teamwork improves project implementation, and different social
abilities likewise enable individuals to work together because they could increase efficiency.
Many of the difficulties and problems that the Elizabeth network project ran into have previously
been covered in the study's first section. The delayed tale served as an example of how project
administration could be leveraged to effectively finish significant projects. The Elizabeth
Channel transportation system wasn't designed with a range of project administration ideas in
mind, and the following are crucial abilities for a productive project manager:
Preparation that comprises an effective asset allocation and utilisation strategy that serves
as the foundation for the scheduling required to carry out the project, is yet another
crucial aspect of project administration. This stage of the project was inadequate in the
context of the Elizabeth Line because there was no clear plan in position in the event of
disturbances that were considered to be substantial as the project experienced numerous
delayed owing to the COVID-19 epidemic.
Supervision is necessary at this stage of project administration because it allows for
continuing confirmation that the project is moving forward in accordance with the
established timelines. Certainly, there is a much of effort to be done in this respect,
particularly when it relates to how Elizabeth Line was restricted. The undertaking is seen
as a beautiful yet challenging endeavour due to the significant expenditures and
difficulties (Ferro, Ordóñez and Anholon, 2017).
Reliable data transmission is necessary for project management since managers must be
capable of providing data and services when they are needed. I was capable of
communicating with the group participants clearly that reduces the possibility of mistakes
and raises overall efficiency and income. By open communication, I was capable of
establishing good relationships with my group participants and meet their requirements,
allowing everybody to offer their valuable skills and expertise to the successful
completion of the scheduled stage.
I would examine the essential facts and concepts with the aid of sociology and logic so
that I can cope with any problems that could arise and endanger the activities. I could use
my cognitive abilities to examine a scenario efficiently, and I was ready to rationally
resolve any issues which arose using a variety of methods and approaches. The
implementation, understanding, assessment, and creative skills needed for efficient
project management can be developed with the help of rational introspective.
This ability aids in comprehending the idea that is essential for the success of a project. I
am able to instruct and inform individuals successfully because if everyone did as they
were instructed, the program will be able to accomplish its main objectives. It aids in
increasing efficiency and efficacy whilst simultaneously helping with the delegation of
authority and the imposition of responsibility where necessary to guarantee a seamless
flow of operations. I can handle activities that are plainly vital from the beginning thanks
to my ability to assess them, and I can also educate group members to impart the
necessary abilities.
Security review is crucial since it aids in identifying prospective risks that could
negatively affect the project as a whole. This ability allows me to efficiently oversee
efforts. Administrators must assess the flaws and mistakes from the beginning phases in
order to design plans and targets to reduce such issues. I was able to develop a broad
variety of different solutions thanks to my skilful information analysis, which will help
the organisation as a whole reduce dangers and be advantageous to the management
(Marin-García and Alfalla-Luque, 2019).
In able to effectively recognize the technological aspects that might have an effect on
business efforts, project managers often need to have both technological knowledge and
social skills. Utilizing a variety of innovative techniques and technologies while boosting
capable of providing data and services when they are needed. I was capable of
communicating with the group participants clearly that reduces the possibility of mistakes
and raises overall efficiency and income. By open communication, I was capable of
establishing good relationships with my group participants and meet their requirements,
allowing everybody to offer their valuable skills and expertise to the successful
completion of the scheduled stage.
I would examine the essential facts and concepts with the aid of sociology and logic so
that I can cope with any problems that could arise and endanger the activities. I could use
my cognitive abilities to examine a scenario efficiently, and I was ready to rationally
resolve any issues which arose using a variety of methods and approaches. The
implementation, understanding, assessment, and creative skills needed for efficient
project management can be developed with the help of rational introspective.
This ability aids in comprehending the idea that is essential for the success of a project. I
am able to instruct and inform individuals successfully because if everyone did as they
were instructed, the program will be able to accomplish its main objectives. It aids in
increasing efficiency and efficacy whilst simultaneously helping with the delegation of
authority and the imposition of responsibility where necessary to guarantee a seamless
flow of operations. I can handle activities that are plainly vital from the beginning thanks
to my ability to assess them, and I can also educate group members to impart the
necessary abilities.
Security review is crucial since it aids in identifying prospective risks that could
negatively affect the project as a whole. This ability allows me to efficiently oversee
efforts. Administrators must assess the flaws and mistakes from the beginning phases in
order to design plans and targets to reduce such issues. I was able to develop a broad
variety of different solutions thanks to my skilful information analysis, which will help
the organisation as a whole reduce dangers and be advantageous to the management
(Marin-García and Alfalla-Luque, 2019).
In able to effectively recognize the technological aspects that might have an effect on
business efforts, project managers often need to have both technological knowledge and
social skills. Utilizing a variety of innovative techniques and technologies while boosting
each group member's productivity assists. I am technologically skilled enough to use a
range of techniques to cut down on effort and needless expenditure which could
significantly affect the program's fiscal status.
The governing bodies in control of the railroad transportation channels significantly
overestimated the amount of money required for this initiative from the beginning, and as
a consequence, the railroad route seemed doomed to experience a string of disasters from
the program's early beginnings. Estimating the assets required to complete the job is a
crucial criterion that, if disregarded, could cause significant problems.
CONCLUSION
The aforementioned information leads to the conclusion that a variety of relevant abilities,
expertise, methods, and processes are required for efficient project administration. According to
evaluations, project administrators must employ a variety of technology and expertise to increase
everybody's performance and effectiveness while operating on a specific initiative. Project
administration places a significant priority on assigning tasks to team individuals so that each can
complete them to the best of their abilities. Participants must establish the project's aims,
intentions, and funds early on in order for them to be capable of achieving their objectives as
planned. It is the responsibility of the project management to make sure that group participants
are aware of their specific duties, goals, and standards in order for them to properly design their
operations. This section offers a comprehensive analysis of the initiative and information on both
its positive and detrimental aspects. The strategy includes both the information that would have
been learned through the project and additional suggestions that will help the project
management conduct out the project in the most efficient way possible. This study outlines a few
of the abilities necessary to maintain an efficient project management.
range of techniques to cut down on effort and needless expenditure which could
significantly affect the program's fiscal status.
The governing bodies in control of the railroad transportation channels significantly
overestimated the amount of money required for this initiative from the beginning, and as
a consequence, the railroad route seemed doomed to experience a string of disasters from
the program's early beginnings. Estimating the assets required to complete the job is a
crucial criterion that, if disregarded, could cause significant problems.
CONCLUSION
The aforementioned information leads to the conclusion that a variety of relevant abilities,
expertise, methods, and processes are required for efficient project administration. According to
evaluations, project administrators must employ a variety of technology and expertise to increase
everybody's performance and effectiveness while operating on a specific initiative. Project
administration places a significant priority on assigning tasks to team individuals so that each can
complete them to the best of their abilities. Participants must establish the project's aims,
intentions, and funds early on in order for them to be capable of achieving their objectives as
planned. It is the responsibility of the project management to make sure that group participants
are aware of their specific duties, goals, and standards in order for them to properly design their
operations. This section offers a comprehensive analysis of the initiative and information on both
its positive and detrimental aspects. The strategy includes both the information that would have
been learned through the project and additional suggestions that will help the project
management conduct out the project in the most efficient way possible. This study outlines a few
of the abilities necessary to maintain an efficient project management.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES
Books and journals
Alziyadat, N. and Ahmed, H., 2019. Ethical decision‐making in Islamic financial institutions in
light of Maqasid Al‐Sharia: A conceptual framework. Thunderbird international
business review. 61(5). pp.707-718.
Bozdo, R., 2020. Public Perception on Reputation and Its Influence on Decision
Making. Mednarodno inovativno poslovanje= Journal of Innovative Business and
Management. 12(2). pp.70-78.
Chiarini, A. and Vagnoni, E., 2017. Strategies for modern operations
management. Benchmarking: An International Journal.
Choi, T. M., Chan, H. K. and Yue, X., 2016. Recent development in big data analytics for
business operations and risk management. IEEE transactions on cybernetics. 47(1).
pp.81-92.
Cruciani, C., 2017. Investor decision-making and the role of the financial advisor: a behavioural
finance approach. Springer.
Delkhosh, M. and Mousavi, H., 2016. Strategic Financial Management Review on the Financial
Success of an Organization. Mediterranean Journal of Social Sciences. 7(2 S2). p.30.
Dogru, A. K. and Keskin, B. B., 2020. AI in operations management: applications, challenges
and opportunities. Journal of Data, Information and Management, pp.1-8.
Dumitru-Alexandru, B., 2016. Business Intelligence for decision making in economics.
In Artificial Intelligence in Financial Markets (pp. 125-158). Palgrave Macmillan,
London.
Emiaso, D. and Egbunike, A. P., 2018. Strategic management accounting practices and
organizational performance of manufacturing firms in Nigeria. Journal of Accounting
and Financial Management. 4(1). pp.10-18.
Eyers, D. and Naim, M., 2019. Project management for effective operations management.
In Contemporary Operations and Logistics (pp. 11-27). Palgrave Macmillan, Cham.
Ferro, R., Ordóñez, R. E. C. and Anholon, R., 2017. Analysis of the integration between
operations management manufacturing tools with discrete event simulation. Production
Engineering. 11(4-5). pp.467-476.
Marin-García, J. A. and Alfalla-Luque, R., 2019. Protocol: How to deal with Partial Least
Squares (PLS) research in Operations Management. A guide for sending papers to
academic journals. Working Papers on Operations Management. 10(1). pp.29-69.
Books and journals
Alziyadat, N. and Ahmed, H., 2019. Ethical decision‐making in Islamic financial institutions in
light of Maqasid Al‐Sharia: A conceptual framework. Thunderbird international
business review. 61(5). pp.707-718.
Bozdo, R., 2020. Public Perception on Reputation and Its Influence on Decision
Making. Mednarodno inovativno poslovanje= Journal of Innovative Business and
Management. 12(2). pp.70-78.
Chiarini, A. and Vagnoni, E., 2017. Strategies for modern operations
management. Benchmarking: An International Journal.
Choi, T. M., Chan, H. K. and Yue, X., 2016. Recent development in big data analytics for
business operations and risk management. IEEE transactions on cybernetics. 47(1).
pp.81-92.
Cruciani, C., 2017. Investor decision-making and the role of the financial advisor: a behavioural
finance approach. Springer.
Delkhosh, M. and Mousavi, H., 2016. Strategic Financial Management Review on the Financial
Success of an Organization. Mediterranean Journal of Social Sciences. 7(2 S2). p.30.
Dogru, A. K. and Keskin, B. B., 2020. AI in operations management: applications, challenges
and opportunities. Journal of Data, Information and Management, pp.1-8.
Dumitru-Alexandru, B., 2016. Business Intelligence for decision making in economics.
In Artificial Intelligence in Financial Markets (pp. 125-158). Palgrave Macmillan,
London.
Emiaso, D. and Egbunike, A. P., 2018. Strategic management accounting practices and
organizational performance of manufacturing firms in Nigeria. Journal of Accounting
and Financial Management. 4(1). pp.10-18.
Eyers, D. and Naim, M., 2019. Project management for effective operations management.
In Contemporary Operations and Logistics (pp. 11-27). Palgrave Macmillan, Cham.
Ferro, R., Ordóñez, R. E. C. and Anholon, R., 2017. Analysis of the integration between
operations management manufacturing tools with discrete event simulation. Production
Engineering. 11(4-5). pp.467-476.
Marin-García, J. A. and Alfalla-Luque, R., 2019. Protocol: How to deal with Partial Least
Squares (PLS) research in Operations Management. A guide for sending papers to
academic journals. Working Papers on Operations Management. 10(1). pp.29-69.
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.