This paper develops a case study on the Venetian Casino project in Macau, exploring the empirical effect of Building Information Modelling (BIM) in construction projects. The case study describes how conflicts encountered during the detailed design stage were discussed by embracing BIM technology. The latter show how the use of BIM distorted the functions of the architect, structural engineer, and contractors involved in the building project.