ENGINEERING ASSIGMENT
By Name
Course
Instructor
Institution
Location
Date

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Documentation /Design Phase
Come up with a tender and assign the steel encasement work
Obtain the required construction approval alongside work permit from the recommended
local authorities
Develop a safety design inclusive of Health and safety at work (AS 1470)
Come up with a specialization alongside marking plan
Ascertain all design calculations as well as drawing according to the Australian Standards
inclusive of Steel Structures (AS 4100) alongside Steel & composite construction (AS
5100.6) besides Guideline for erection of steelwork building (AS 3828)
Sign an agreement with suppliers, contractors alongside clients which bear enough clarity
in terms of milestone, methods as well as budget besides special condition agreement
Developing a checklist for safety alongside needs for quality control
Establish with project team each drawing are of sufficient detail which are provided to
fabricators as well as contractors via technical design review
Choose on a plan for demolition that is not associated with devastating impacts on
building alongside the environment. The demolition procedure should be done as per the
outlined regulations as well as conforming to the sustainability development initiatives
and opportunities
Come up with traffic area maps suppose the construction would be associated with
impacts on the main road, streets as well as walkways.
Establish the plan procedure alongside the resources value as well as materials required
for construction phase
Document Page
Estimate the budget of the project which includes the pre-construction phase,
construction phase alongside furnishing phase. The budget estimates for each of the
phase would be summed together to give the budget of the whole project that is in turn
useful for planning of the execution of the project.
Acquire the necessary insurance cover for any possible unpredictable conditions on
construction site for example equipment, structures alongside manpower
Fabrication Phase
Ensure there is conformity between the measurements alongside quality with the
standards of design
Find the mostly recommended equipment usable for lifting steel member alongside its
position
Establish the welding of all members of steel are according to the outlined standards
which are based on Safety welding and associated processes (AS 1674.1)
Check as well as ensure fabricators can work as per the given drawings alongside the
outlined specification
Ensure the fabricators are finished using the recommended drawings alongside an
understanding of all details that are found within.
Construction Phase
Confirm the stability of the structure during the process of construction
Establish covering wholly engulfs the area of construction and does not permit entry of
debris to eliminate during the demolition process
Confirm end products are according to drawings as well as attain quality standard
Document Page
Establish durability of the floor to be adequate for the purposes of transmission of the
weight of underpinning
Ensure there is safe drilling through the wall
Find out and communicate with contractors, clients alongside project team at each stage
of construction via weekly status report
Have the procedure for sequential erection is recommended on site as well as updating
the current design
Ensure the members of the staff have to be compliant with safety practice (AS 1470)
sufficiently
Ensure all processes of construction are according to standards of steel and composite
construction (AS 5100.6)
Ensure welding or even bolting of joints is sufficiently conducted as per the quality
standards (AS 1674.1)
Communication Plan with main Stakeholders
Type of
communication Description Frequency Format Participants /
stakeholder Deliverable
Status report
every week
project status
Email
summary
Every week Email
Clients or
project team or
Contractors
Status Report
project team
meeting weekly
Convention to review action
register as well as status Every week Personally Project team Updated Action
register
Project monthly
review (PMR)
Present metrics alongside
status to clients as well as
team
Every
month Personally
Clients or
project team or
Contractors
Status & Metric
Presentation
Project gate
review
Present closed out of project
phases as well as kick-off next
phase
As required Personally
Clients or
project team or
Contractors
Phase
completion
report as well as
phase kick-off
Technical
Design Review
Review of any technical
design or work linked with
As required Personally Project team /
Contractors
Report for
Technical

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
project Design
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]