ENGINEERING ASSIGMENT By Name Course Instructor Institution Location Date
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Documentation /Design Phase Come up with a tender and assign the steel encasement work Obtain the required construction approval alongside work permit from the recommended local authorities Develop a safety design inclusive of Health and safety at work (AS 1470) Come up with a specialization alongside marking plan Ascertain all design calculations as well as drawing according to the Australian Standards inclusive of Steel Structures (AS 4100) alongside Steel & composite construction (AS 5100.6) besides Guideline for erection of steelwork building (AS 3828) Sign an agreement with suppliers, contractors alongside clients which bear enough clarity in terms of milestone, methods as well as budget besides special condition agreement Developing a checklist for safety alongside needs for quality control Establish with project team each drawing are of sufficient detail which are provided to fabricators as well as contractors via technical design review Choose on a plan for demolition that is not associated with devastating impacts on building alongside the environment. The demolition procedure should be done as per the outlined regulations as well as conforming to the sustainability development initiatives and opportunities Come up with traffic area maps suppose the construction would be associated with impacts on the main road, streets as well as walkways. Establish the plan procedure alongside the resources value as well as materials required for construction phase
Estimate the budget of the project which includes the pre-construction phase, construction phase alongside furnishing phase. The budget estimates for each of the phase would be summed together to give the budget of the whole project that is in turn useful for planning of the execution of the project. Acquire the necessary insurance cover for any possible unpredictable conditions on construction site for example equipment, structures alongside manpower Fabrication Phase Ensure there is conformity between the measurements alongside quality with the standards of design Find the mostly recommended equipment usable for lifting steel member alongside its position Establish the welding of all members of steel are according to the outlined standards which are based on Safety welding and associated processes (AS 1674.1) Check as well as ensure fabricators can work as per the given drawings alongside the outlined specification Ensure the fabricators are finished using the recommended drawings alongside an understanding of all details that are found within. Construction Phase Confirm the stability of the structure during the process of construction Establish covering wholly engulfs the area of construction and does not permit entry of debris to eliminate during the demolition process Confirm end products are according to drawings as well as attain quality standard
Establish durability of the floor to be adequate for the purposes of transmission of the weight of underpinning Ensure there is safe drilling through the wall Find out and communicate with contractors, clients alongside project team at each stage of construction via weekly status report Have the procedure for sequential erection is recommended on site as well as updating the current design Ensure the members of the staff have to be compliant with safety practice (AS 1470) sufficiently Ensure all processes of construction are according to standards of steel and composite construction (AS 5100.6) Ensure welding or even bolting of joints is sufficiently conducted as per the quality standards (AS 1674.1) Communication Plan with main Stakeholders Type of communicationDescriptionFrequencyFormatParticipants / stakeholderDeliverable Status report every week project status Email summary Every weekEmail Clients or project team or Contractors Status Report project team meeting weekly Convention to review action register as well as statusEvery weekPersonallyProject teamUpdated Action register Project monthly review (PMR) Present metrics alongside status to clients as well as team Every monthPersonally Clients or project team or Contractors Status & Metric Presentation Project gate review Present closed out of project phases as well as kick-off next phase As requiredPersonally Clients or project team or Contractors Phase completion report as well as phase kick-off Technical Design Review Review of any technical design or work linked with As requiredPersonallyProject team / Contractors Report for Technical