logo

Engineering Project Management PDF

   

Added on  2020-05-11

8 Pages725 Words74 Views
Running head: ENGINEERING PROJECTS MANAGEMENTEngineering Projects managementInstallation of Botts dotts for Car in fog seasonStudent Name:University Name:
Engineering Project Management PDF_1
ENGINEERING PROJECTS MANAGEMENT1Table of Contents1. Cost of the components...............................................................................................................22. Specification of components........................................................................................................23. Block Diagram.............................................................................................................................34. Input Output Specification...........................................................................................................45. Modification of project plan........................................................................................................56. Bibliography................................................................................................................................8
Engineering Project Management PDF_2
ENGINEERING PROJECTS MANAGEMENT21. Cost of the componentsThe various components that are required for designing the installation of Botts dotts forCar in fog seasonso as to avoid major mishaps or accidents are listed as below along with theircosts:ComponentsCostSensor$ 2.5 per pieceLED lights$ 0.25 per pieceSolar panels$ 25 per panelLight Post$ 30 per postBoost Converter $ 2.6 per setFilter$ 300 per filterBattery$ 50 per unit2. Specification of componentsThe specification of the various components that are required for installation of Bottsdotts for Car in fog seasonare documented as below:ComponentsDescriptionSpecification(Required value)SensorThis component is required for detecting the passingcars in speedways and highways.10LED lightsThis component acts as indicator lights for the cars thatare passing through speedways or highways.100Solar panelsThis component is necessary for absorption of the solarrays to convert the solar energy into electrical energy.30Light PostThis component will serve as structure for the LEDlights.20BoostConverter This component is required to convert the heat energyinto electrical energy.08FilterThis component is basically a circuit that performs05
Engineering Project Management PDF_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Pw Engineering Group Assignment Report
|34
|5392
|27