Ask a question from expert

Ask now

42908: Engineering Project Preparation Assignment

24 Pages4854 Words241 Views
   

42908 Engineering Project Preparation (42908)

   

Added on  2020-05-04

42908: Engineering Project Preparation Assignment

   

42908 Engineering Project Preparation (42908)

   Added on 2020-05-04

BookmarkShareRelated Documents
ENGINEERING PROJECTUNDERGROUND WATER TANK DESIGN
42908: Engineering Project Preparation Assignment_1
ENGINEERING PROJECTEXECUTIVE SUMMARYWater is the livelihood primary need for human kind in the world. No water can leave thehuman kind, with no question of survival. Though the total amount of water required is varied,with respect to various aspects and factors, it is needless to say that a few liters of water aremandatory for survival of any and every human being. But the availability of water is not linearin all the places and all the seasons. Hence, storage of water is mandate to ensure that minimumrequirement of water is always available within the compound wall of the dwelling. Thisnecessity is the mother of creation of the storage tanks and underground is one of them.Underground water tanks can serve the purpose of day to day water availability and supply to thehousehold to perform the domestic as well as the cleaning tasks for the human beings. The objective of this project is to construct an underground water tank. The projectinitially, makes estimation of the total water capacity needed for the a specific society, based onthe total number of units, which are flats, present in multiple floors and multiple apartments,present in the society. The society is considered as the total site, in which underground has to bebuilt and the flats are considered as the basic units. The project is intended to be conducted in thesite, with all the background work performed in indoor. The estimation and survey of the project are expected to perform, both with the numericalanalysis as well as the empirical data present, from the existing or the past underground tankdesign and construction projects. The project is expected to be conducted with the theoreticalconcepts as well as the practical and empirical data considered and involved.
42908: Engineering Project Preparation Assignment_2
ENGINEERING PROJECTContentsUNDERGROUND WATER TANK DESIGN.....................................................................5Introduction..........................................................................................................................5Literature Review................................................................................................................5Water Tank..................................................................................................................................5Classification...............................................................................................................5Underground Water Tank............................................................................................................6Classification...............................................................................................................6Features........................................................................................................................8Tank Construction.......................................................................................................................8Requirement.................................................................................................................8Survey..........................................................................................................................9Excavation.................................................................................................................10Requirements of the design........................................................................................11Approvals from the consultant...................................................................................12Plane Cement Concrete and water proofing..............................................................12Research Questions............................................................................................................13Theory................................................................................................................................13Underground Water Tank..........................................................................................................13
42908: Engineering Project Preparation Assignment_3
ENGINEERING PROJECTDesign Aspects..........................................................................................................................15Primary Data..............................................................................................................15Experimental Set-up..........................................................................................................16Results, Outcome and Relevance......................................................................................17Project Planning and Gantt Chart......................................................................................17Gantt Chart.................................................................................................................................18Conclusions........................................................................................................................19References..........................................................................................................................19
42908: Engineering Project Preparation Assignment_4
ENGINEERING PROJECTUNDERGROUND WATER TANK DESIGNIntroductionWater is the primary cause for the sustainability of the human being, in theplanet Earth, rather than the rest of the planets in the Solar system. Eventually,water becomes the basic and primary need for the sustainability of the life, in dayto day activities. The project is intended for water tank design, for the purpose of utility andstoring the drinking water. The water tank is expected to serve the day to dayrequirements of the houses present in the society (Kapadia et al, 2017).Literature ReviewWater TankWater tank has been in usage for storing water, so that the daily requirementscan be fulfilled. The capacity of the tanks would be different and based on therequirements of the end user (Thalapathy et al, 2016). Classification Water tanks are of various types and the categorization is done usually, on itsposition, shape, with respect to the ground. These can be 1.Tanks that rest over the ground2.Underground tanks
42908: Engineering Project Preparation Assignment_5
ENGINEERING PROJECT3.Elevated tanksUnderground Water TankUnderground water tank is placed below the ground level, to store water.Mostly, these tanks store runoff, after collecting water from ground catchments,like hillsides, grasslands, roads, hillsides, areas of unpaved and paved areas, homecompounds, footpaths, etc. At some of the instances, channeling of the roofcatchments is also done into the underground tanks. The advantage of the underground water tank is that it can allow largervolumes of water (Ramamrutham & Narayan, N.D). It is suitable for theapplications of products having higher vapor pressure. Classification In terms of the shape, the underground water tanks can be classified as 1.Rectangular tanks The rectangular tank walls are subjected to the moments of bending, invertical as well as in the horizontal direction. It is hard to analyze themoment present in the wall, because triangular load is resulted from thewter pressure, over them. And the moment magnitude is based on manyof the factors, like height, breadth and length of the tank along with thewall support condition at the bottom and top edges. When thecompressed length of the wall is greater compared to the height of it, thenthe moment would be in direction of vertical, primarily, eventually, thebent of the panel would be cantilever. In case the height is more than thelength, the resultant moments would be in horizontal direction and thebend of the panel would be as a thin slab, supporting over the edge.Bending is taken place, in vertical direction and horizontal direction, forintermediate condition. Apart from the moments, walls would be
42908: Engineering Project Preparation Assignment_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
42908 : Engineering Project Preparation Assignment
|24
|4316
|61

Project Planning and Scheduling
|11
|2764
|437

Assignment: Introduction to Marketing (Marketing Management)
|6
|1188
|87