Enterprise Project Management MSPM1-GC4000 Edward Kleinert Statement of Work (SOW) The Project Title The Organization NameorBusiness Unit NameorDepartment Name The Project Solution Authors Name: Date: Student Name: Course Name: Course ID Number: Team Name and Number: 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Enterprise Project Management MSPM1-GC4000 Edward Kleinert 1.Purpose The statement of work discusses the work that is to be covered in a specific project (Wright, 2018).It binds the five-season resort and the contractors in an agreement. In the development of the report, there is a need to write all the project deliverables, milestones, and all the end products. In essence, there is a need to be specific on the agreements that are made, since this is one of the major problems that face the statement of work. In essence, this document tries to devolve all the technological augmentation involved in the construction of the four seasons resort. In order to create a luxury resort that fully meets the demand of the people, it is important to understand that technology needs to be incorporated into the project design and implementation(Dangerfield, Green, & Austin, 2010). Technological aspects of the luxury hotel design are a move away from the traditional manual methodology, and as such, it is important to understand all the project requirements. 1.1.Organization Four seasons is an organization that has focused all its energies into the provision of quality resort services. What is of most significance to this organization is the technological enhancement of service provision. With the increasing demand for quality services, there is a need to move away from the manual methodology of service provision into an automated system. Biometric system, technological service provision and technological security measures are some of the aspects that are discussed in this document. The history of the company has no parallel and that being the case, there is a major focus to increase the market share in Mexico by around 5%. Working on a tight 2
Enterprise Project Management MSPM1-GC4000 Edward Kleinert There is also the need to ensure that there are civil and structural engineers(Giani, 2017) who will provide a blueprint and the foundation for implementing the IT infrastructure. Nevertheless, in order to optimize the use of the IT infrastructure, there needs to be the development of applications that manage the whole system. Control of the building infrastructure can be managed through the use of apps. Software experts will come in handy in the development of applications that suit the building’s functionality. This means that they will have to work closely with IT experts. 4.2.Scope of Work – ‘Statement of Work’ This section discusses the project requirements in terms of deliverables, milestones and the eventual product output. This means that the scope of the project needs to be discussed so that the consultants are well aware of the agreement. 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Enterprise Project Management MSPM1-GC4000 Edward Kleinert 4.2.1.Description The contractors, in this case, civil engineers, IT experts and software engineers, are mandated with the responsibility of ensuring that the building structure is technologically equipped to ensure that the services provided in the luxury hotel are top-notch. This means that the latest technology has to be applied in the development of the building blueprint. The rooms are supposed to be technologically equipped to handle the customers in both a security perspective and on the services provided. The building is supposed to engage with the customer, which can only be achieved by technological integration. This contract is expected to come to a conclusion by July 2021. Therefore, one of the project milestones is the installation of It infrastructure all over the building. This should be closely related to the actual building completion. The use of applications to control the building marks the final product and should be about the same period as the project completion. Nevertheless, the project deliverables are as follows: ï‚·An understanding of the current technologies available in the building and how the required technology can be implemented. ï‚·Design of a building structure that ensures the food services are automated. ï‚·Ensuring that the building has an automated system that can be monitored through the use of mobile applications. ï‚·Design and installation of a biometric system that allows the guests and the customers to access the rooms and the building premises. ï‚·Sensors installation for seamless service provision. ï‚·Installation of procurement technologies. 5
Enterprise Project Management MSPM1-GC4000 Edward Kleinert ï‚·Integration of the various technological blueprints with each other for efficient service delivery. In this line, the following professionals will be required: ï‚·The civil engineers have an extensive task in providing building blueprints that are compatible with the project requirements. ï‚·The IT experts will have to work with the civil engineers to ensure that the IT framework can be implemented throughout the building structure. ï‚·Software engineers will work with the IT experts in order to ensure that the applications can be integrated into the building structure. 6
Enterprise Project Management MSPM1-GC4000 Edward Kleinert 4.2.2.Estimated Effort and Cost Cost Estimate Item #DescriptionUnitsHoursRateTotal 1It infrastructuren/an/an/a500,000US D 2Apps to manage the system n/an/an/a50,000USD Labor Total200,000US D Other Expenses100,000US D Grand Total850,000USD 4.2.3.Deliverables 4.2.3.1.Itemized list and due dates 4.2.3.2.Acceptance Criteria Format 4.2.3.3.Delivery Instructions 4.2.2.4Timeline and Period of Performance 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Enterprise Project Management MSPM1-GC4000 Edward Kleinert 5.Customer Furnished Resources 5.1.Facilities, Supplies and Services 5.2.Information Sources 5.3.Documentation 6.Contractor Furnished Resources 6.1.Facilities, Supplies and Services 7.Administrative Considerations 7.1.Place of Performance/Work Location 7.2.Hours of Work 7.3.Period of Performance 7.4.Other Direct Costs 7.4.1.Incidental Supplies, Equipment and Materials 8
Enterprise Project Management MSPM1-GC4000 Edward Kleinert 7.4.2.Travel Requirements 7.4.3.Travel and Per Diem 7.4.4.Other Unique Costs 7.5.Security and Privacy 7.6.Personnel Services 7.7.Audit and Review 7.8.Reports 8.Special Instructions 8.1.Unique Reporting Requirements 8.2.Standards and References 8.3.Evaluation Criteria 8.4.General and Miscellaneous 9
Enterprise Project Management MSPM1-GC4000 Edward Kleinert References Dangerfield, B., Green, S., & Austin, S. (2010). Understanding construction competitiveness: the contribution of system dynamics.Construction Innovation. Giani, F. (2017, January 4).The added value of project management: The business perspective. Retrieved from www.p3mo-team.org/EN/added-values-of-project- management-the-business-perspective/?lang=en Wright, T. C. (2018, April 13).Scope of Work vs. Statement of Work. Retrieved from https://yourbusiness.azcentral.com/scope-work-vs-statement-work-17353.html 11