[COMPANY NAME AND LOGO]
CONSTRUCTION ENVIRONMENTAL AND MANAGEMENT PLANT
[COMPANY NAME]
[PROJECT]
[LOCATION]
NAME DESCRIPTION APPROVED BY SIGNED DATE

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Description of work:
Location: Construction site nearby Budj Bim Cultural Landscape, Australia.
Specific activities: Noise management, cultural heritage management, Contaminated soil
management, waste management, water quality management and so on.
Factory on plot: Construction site
Habitat agreements and pertinent circumstances:
Time period of work: 6am to 22pm
Schedule:
Evaluated period
7am-8am
8am-10pm
20pm-21pm
21pm-6am
Contractors Details:
Information regarding the contractor:
Name Position Contact number Email
Habitat agreements:
As per Australia, state of environment policy, there are several policies which highlighted the
requirement of land use planning reformation such as, Harper review of competition policy
(2015), public infrastructure (2014), zoning and development assessments (2011), and
Productivity Commission inquiries into planning,
NOISE
Document Page
Noise generation activities and sources: Building equipment, excavator equipment,
Rammers, uncluttered equipment and four-stroke engine.
Maintenance and operations of machinery:
Equipment Average Sound levels at operator
Background* 86
Excavator 88
Grader 86.5
Intimidator 96
Influx 90
Grind 96
Tracked vehicle <85
Working Hours:
Computed Time-period Acoustic pressure A LAeq, S (dB)
equivalent level for Hygiene limit
7am-8am 60
8am-10pm 65
20pm-21pm 60
21pm-6am 45
Activity specification at night:
Earthwork
Bridge Deck Pour
Structural Bridge Work
Bridge Deck Overlay
AIM: To suitably Control sound throughout building ventures to reduce the effect to
labourers, community members and neighbours.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Modify the
equipment or the
work area such as
mufflers, or
enclosures; erecting
barriers
Site Manager Non- working time
on equipment
Execution
measures
No issues concerning
sound
Site Manager All over building
work
Observing Noise monitoring
program
Site Manager All over building
work
Announcing Reporting to site All employees All over building
work
Corrective Actions Lapse of time
implementation
Site Manager All over building
work
Ethnic Custom:
Document Page
The cultural heritage nearby the construction site is Budj Bim Cultural Landscape, Australia.
Undertaking steps for uncovered heritage artefact:
Avoidance reduces the site impact by partial or entire project redesigning or
relocation.
For excluding the data recovery option due to destructive site and delay construction,
it is needed that salvage excavation must be conducted as per the needs of Project's
Cultural Heritage Investigation.
AIM: To manage constructions pursuits with the prospective to disarrange uncovered custom
commodities.
PARAMETERS REQUIREMENTS AUTHORITY SCHEDULE
Actions All the architects
must be trained on
their ethnic custom
responsibility.
Site Manager All over building
work
Execution
measures
No Ethnic custom
commodities exposed
Site Manager All over building
work
Observing Optical observing
program
Site Manager All over building
work
Announcing Announcing to plot
organizer
All employees All over building
work
Corrective Actions Remedial measures
and lapse of time
implementation
Site Manager All over building
work
Polluted land:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Existing pollution: Air Pollution
The construction site listed on the environmental management register : Yes
Importation of fill:
Fill material must not hold:
Domiciliary junk.
Commercial junk.
Biological matter
Class A, B or C authorized Commercial junk.
Kanamycin dirt and crag
Concrete crag.
Removal of fill from site:
Cut and fill Uncovering:
It is excavation procedure where the material is cut and stripped. The excluded earth and the
topsoil can be used for filling the elevated sections and embankments.
Contamination testing with soil disposal protocol appendix:
Soil Volumes Land use scenario
Urban residential
Land use scenario
Public parks
Total (m2)
Polluted dirt
capacity
151,178 26,967 178,145
Sanitized dirt
capacity
(Category-A)
46,218 11,036 57,245
(Category -B) 14,690 2,543 17,233
(Category -C) 37,540 639 38,179
Net Sanitized
capacity
98,448 14,218 112,666
Solid lump
capacity
6,369 1,898 8,267
Document Page
AIM: To direct the constructions ventures with the possible to disarrange the polluted crag.
PARAMETERS REQUIREMENTS AUTHORITY SCHEDULE
Actions No pollute
substances will be
exported to plot
Site Manager All over building
work
Execution
measures
No proof of polluted
crag on plot
Site Manager All over building
work
Observing Pollution nodding Consultant All over building
work
Announcing Announcing to plot
organizer
All employees All over building
work
Corrective Actions Remedial measures
and lapse of time
implementation
Site Manager All over building
work
Document Page
Junk Administration:
Tactful sensor:
It includes:
Hospitals
day-care facilities
elderly housing
Convalescent facilities.
Waste Receptacles and servicing:
The main technique for the effective jobsite segregation is to place the receptacles in the
route of least resistance at the workplace and provide the training to workforce for
investigating segregation practices, and policing the workplace for contamination prevention.
AIM: To control junk throughout constructions venture.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Suitable junk
vessels will be
issued on the plan
Construction manager Earlier to work
beginning
Execution
measures
No junk
intentionally
liberated
Site Manager All over building
work
Observing Vessels regularly
inspection and
weekly unload
Site manager All over building
work
Announcing Announcing to plot
organizer
All employees All over building
work
Corrective Actions Remedial measures
and lapse of time
implementation
Site Manager All over building
work

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Water Quality:
Environmental control:
Minimizing the land disturbance.
All drains covering on the construction site.
Waste water collection and treatment before it discharged as effluent.
Reuse of storm water:
A storm water gathering and utilize structure potentially has four components:
collection system
storage unit
treatment system: pre and post
Considered activities related to storm water and ground water:
Several activities should be considered as:
Refuelling
Hazardous chemicals storage
Waste
Stock pilling
Excavation
Ground water level:
18000 ft.
Surface and Ground water quality monitoring:
The water management problems analysis and aims are basis on specified information
requirements which are related to:
Usage
Issues
Measurement
AIM: To manage storm water and ground water feature throughout constructions ventures.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Uncovering of
settlements tarns
Construction
manager
Earlier to work
beginning
Execution
measures
No unprocessed
storm water arriving
Construction
manager
All over building
work
Document Page
at plot
Observing Aqua standard
observing scheme
Construction
manager
All over building
work
Announcing Announcing to
Construction
manager
All employees All over building
work
Remedial Measures Remedial steps and
interval
implementation
Construction
manager
All over building
work
Acid Sulphate soil:
Excavation and Depth:
For setting the foundation excavation layout, a benchmark shall be situated at the plan by the
masonry pillar and it connected to the nearby standard benchmark.
ACID SULPHATE SOIL MANAGEMENT PLAN:
Parameters Stage 1 Stage 2 Stage 3 Stage 4
Symbolic
Volume
60 Mtpa 120 Mtpa 180 Mtpa 240 Mtpa
Fly-tipper 1 1 1 1
abattoir 1 1 1 1
endless 1 1 1 1
Reclaimed 1 1 1 1
Rail Spur 1 1 1 1
AIM: To run constructions ventures with the probable to disarrange polluted clay.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Action take up if soil
is disrupted
Construction
manager
All over building
work
Performance
indicators
No proof of acid
sulphate soil effects
Construction
manager
All over building
work
Monitoring Optical observation
or area nibbling
Construction
manager
All over building
work
Reporting Announcing to
Construction
manager
All employees All over building
work
Corrective Actions Remedial steps and
interval
implementation
Construction
manager
All over building
work
Document Page
Perilous materials:
Storage:
List making for hazardous substances
Label reading for all products
Segregation and stored in proper manner.
MSDs of Hazardous Substances:
Figure.1 MSDs image for Hazardous Substances
Importance of Refuelling:
Improper fuelling techniques can have deadly consequences. Vapours from these
liquids can ignite with explosive force from no more than a spark.
Fuel spills resulting from poor refuelling procedures can cause needless damage to the
environment.
Inhalation of gasoline fumes from improper refuelling can cause nausea, dizziness,
headaches, and loss of coordination.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Once ignited, fires from liquid fuels can be very difficult to extinguish, as they often
spread quickly.
AIM: To organize constructions pursuits with the possible to source polluted clay.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Whole alchemistic
should store in
banded and ceiling
regions.
Construction
manager
All over building
work
Presentation
measures
No reveals Construction
manager
All over building
work
Observation alchemistic depot
regions and reveals
tools will be
examined
Construction
manager
All over building
work
Announcing Announcing to
Construction
manager
All employees All over building
work
Remedial steps Remedial steps and
interval
implementation
Construction
manager
All over building
work
Document Page
Air Quality:
Dust suppression:
Dust can be suppressed before becoming airborne with the usage of system. A nozzles series
discharge a chemical compound in the form of fine spray for water amount reduction or other
mandatory liquids for saturating fly ash and eliminating the dust.
Stockpiles utilized as the temporary dump before the coal is imported by the water paths to be
marketed at abroad and home. The vehicle movements such as trucks in and around the
building plans enhances the particles amount through the pulverizing and crushing on the
road surface which is the major problem of truck loading.
Methods of reduces dust:
Polymers as Dust Control.
Testifiers and Soil Stabilizers.
Chlorides.
Barriers.
Stone.
Sweep Equipment.
AIM: To directed the constructions ventures with the possible to effect on wind standard.
PARAMETERS REQUIREMENTS AUTHORITY SCHEDULE
Actions Aqua wagons will be
utilized in the dirt
subduing
Construction
manager
All over building
work
Presentation
measures
No protests regarding
dirt
Construction
manager
All over building
work
Observation Air quality
monitoring program
Construction
manager
All over building
work
Announcing Announcing to
Construction
manager
All employees All over building
work
Remedial steps Remedial steps and
interval
implementation
Construction
manager
All over building
work
Document Page
Site specific environmental issues:
Erosion and Sediment control:
For building plan establishment, designers will require data on existing site conditions and
the neighbouring assets. This consideration includes natural regions, water bodies, bluffs and
other sensitive regions.
AIM: To directed the constructions ventures with the possible to effect on abrasion and the
deliverance of sediments.
PARAMETERS DEMANDS AUTHORITY SCHEDULE
Actions Cattle grid insertion
at egress end
Construction
manager
Earlier to work
beginning
Presentation
measures
No slush perceptible
on road
Construction
manager
All over building
work
Observation diurnal visual
examination of work
Construction
manager
All over building
work
Announcing Announcing to
Construction
manager
All employees All over building
work
Remedial steps Remedial steps and
interval
implementation
Construction
manager
All over building
work

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Flora and Fauna:
Measures Target Timeframe Accountability Documentation
Number of native
Fauna injured
0 At all time Construction
project manager
Fauna spotter
catcher process
Land cleared
area
0 At all time Construction
project manager
Monitoring
records site
environmental
plan
Environmental
representative
stop work
recommendations
0 At all time Construction
project manager
ER reports
AIM: To manage constructions ventures with the possibility to disarrange nature.
PARAMETERS REQUIREMENTS AUTHORITY SCHEDULE
Actions No saltwater plants
will be disrupted
Construction
manager
Earlier to work
beginning
Presentation
measures
No injury Construction
manager
All over building
work
Observation Visual Observing Construction
manager
All over building
work
Announcing Announcing to
Construction
manager
All employees All over building
work
Remedial steps Remedial steps and
interval
implementation
Construction
manager
All over building
work
Document Page
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]