Running head: EXPRESSION OF INTEREST
1
EXPRESSION OF INTEREST (EOI) FOR RENEWABLE GENERATION
Name
Institutional Affiliation
Expression of Interest for Renewable Generation_1

EXPRESSION OF INTEREST2
Introduction
Amare Electrical LTD is a private Limited Company, established in 1989 and incorporated in the year
1997. It is registered under the Ministry of Public Works, and among the top contractors in the country.
The company’s business scope includes general electric works, security installation, Information
Communication Technology (ICT), and renewable energy solutions. The company is well equipped with
the latest technological equipment, specialized hardworking staff, and has a lot of potential in the
electrical engineering world. The company boasts of undertaking a wide range of projects, from hospitals,
to residential, hotels, schools, factories, sub-stations and big power reticulations, just to name a few.
Today, all services that have been undertaken by Amare Electrical LTD, have been of high standards and
have met all the standards by the regulation bodies like Chartered Institution of Building and Services
Engineering (CIBSE), Institution of Electrical Engineering (IEE), and International Electrotechnical
Commission (IEC). The company has had an enormous growth since its inception, with a turnover of
rising from US$60,000 in 1991 to US$14,800,000 by the end of 2018. This growth has paved way for job
creation thereby attracting top brains in the country to work for us, our workforce which currently stands
at 587, up from just 25 in the year 1995.
The Largest Capacity of Uncontrolled renewable
The threshold capacity of the renewable energy (Wind) that can be generated in the place is 350MW, this
is the wind power generation that is required. This load shall be distributed at node 2, we can generate up
to a maximum of 200MW worth of electricity and at node 3 which targets site A, connected to line 3, we
can generate a maximum of 150MW, this is since we are targeting side D, which is connected to line 7.
Line 2-3 is connected to a cable called Lacrosse of length 14.14km, while that of 6-7 is connected to a
cable called Bowls and is of length 30km and both have not been duplicated.
Bowls cable costs $ 300,000 per km, and Lacrosse cable costs $600,000 per km and since there’s no
duplication, that will be the cost.
Expression of Interest for Renewable Generation_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Australia's Renewable Energy: A Comprehensive Overview
|10
|1315
|170

EE-362 Electrical Engineering Department Tasks 2022
|14
|2216
|16

Renewable Energy Technology
|9
|1230
|14

Feasibility Analysis of Hybrid Energy System for Scone Region
|18
|4543
|156