This report discusses the project management of a family relocation project with adjustments made to the schedule, implications of changes, personal reflection, and updated milestone plan and task list.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROJECT MANAGEMENT Family Relocation Project Name of the Student: Name of the University:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT Table of Contents 1. Introduction..................................................................................................................................2 2. Project status detailing completion, slip and delays....................................................................2 3. Implications of changes made.....................................................................................................3 4. Detailed adjustments made to schedule.......................................................................................3 5. Personal reflection on the process...............................................................................................6 6. Updated milestone plan...............................................................................................................7 7. Updated task list..........................................................................................................................7 8. Revised Gantt chart......................................................................................................................8 Bibliography....................................................................................................................................9 Appendix........................................................................................................................................11 Appendix 1: Updated milestone plan........................................................................................11 Appendix 2: Updated task list....................................................................................................11 Appendix 3: Revised Gantt chart...............................................................................................15
2PROJECT MANAGEMENT 1. Introduction The project case is related to family relocation of two adults such as Kelly and Jeff with their two children. Relation of this project is based on accomplishment within 31stJanuary, as their two children Will and Lexie wants to attend their classes from first day. The project activities are listed in the project plan in such a way that the total project budget is $15,000 and the project must commence in Wednesday 31stJanuary. The total time required to complete family relocation is nearly 12 months. The progress report is based on summarizing the status of the project plan with project completion, slip and project delays. The project changes are also discussed and detailed adjustments related to project schedule is discussed in the report. A personal reflection on process is analyzed so that the way the project manager works in the project is analyzed. After making changes in the project, the project manager updated the milestone plan, list of project tasks and Gantt chart so that possible project changes are analyzed in this case. 2. Project status detailing completion, slip and delays From the project status, it is analyzed that the family relocation project should complete in timeframe of 65 days where the Perth school term of two children commences on Wednesday 31stJanuary. Jeff started their job on 5thFebruary, 2019 and they were required to vacant the current property on 20thJanuary, 2019. New rental in Perth commenced on 27thJanuary, 2019. Due to illness of Kelly, the doctor advised to take 2 days to become healthy and carrying belongs of Kelly and Jeff has broken down and it will take nearly 3 days for repairmen to be made. Therefore, there is delay of 5 days in the project plan. Previously, the time required to
3PROJECT MANAGEMENT complete the project is 65 days and now after making changes in the project plan, the time required to complete the work is 70 days. The project budget remains same but there is an increase in number of days. 3. Implications of changes made From the changes made in the project plan, it is seen that there is a delay of 5 days in the entire plan from its current duration as it takes 2 days for Kelly to become healthy and 3 days to repair the carrying belongs of Kelly and Jeff. Previously the project completed with a time period of 65 days, while after the lead time due to possible causes, the project is ended with 70 days. Therefore, there is a change of 5 days means the scheduled time period of the project is increased by 5 days more. It is concluded that after addition of extra causes to the project, there is only change in the time but there is no change in project schedule as no extra resources and cost is added to the project plan. Only number of days is added to the project plan and caused delay in the entire project by 5 days. 4. Detailed adjustments made to schedule Based on the current schedule, adjustments are based on three factors. First factor is that Australia hits by worst flu, therefore Kelly has fallen ill and cannot able to undertake tasks which are assigned to Kelly. The doctor of her advised to take rest for two weeks, commencing 15th January. Second factor is that Removalist advised that truck which is carrying belongs of Kelly and Jeff has broken down and it will take nearly 3 days for repairmen to be made. Therefore, it will cause delay in arrival of the furniture until 30thJanuary. Third factor is that due to Australian
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7PROJECT MANAGEMENT 5. Personal reflection on the process From the entire discussion on the project work, it is seen that in order to conduct entire family relocation project in Perth, it becomes critical for the project manager to recognize risks at the initiation phase. Due to changes in the project schedule and budget, then there are some adjustments in the schedule which can increase the project time and cause delay in the project. However, for the three factors which are mentioned in point 4, there is some increment in the days required to complete the project work. In order to avoid overrun of time and cost, it is required to complete job in assigned period of time. The project manager and team members require taking possible actions to complete entire project with estimation of proper project budget, time. Communication approaches is required to take proper project related decisions. Work breakdown structure is developed to make entire project work easier. While working in the project plan, there is also knowledge of communication as well as risk management along with time and cost management, therefore it becomes easier to manage entire project work as per planned. Knowledge and skills of MS Project helps me a lot to schedule time, cost and divide the project activities in smaller elements. 6. Updated milestone plan The entire project plan is divided in 5 sections where milestone is termed as completion of each project phases. The entire project plan is divided in smaller segments. Refer to Appendix-1
8PROJECT MANAGEMENT 7. Updated task list This section shows segments of the each project activities assigned with the resources and each of the resources are assigned to perform their role and responsibilities with assigned rate for each resources. The project schedule and budget is done based on division of the tasks in the project. Refer to Appendix-2 8. Revised Gantt chart Gantt chart shows the graphical representation of the project activities. In order to complete entire project work successfully in estimated budget of $15,000, it is required that project manager should divide each of the project activities in smaller segments so that it becomes easier to allocate each of the project activities to respective resources based on their skills and knowledge. Refer to Appendix-3
9PROJECT MANAGEMENT Bibliography Binder, J., 2016.Global project management: communication, collaboration and management across borders. Routledge. Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute. Harrison, F. andLock,D., 2017.Advancedprojectmanagement:astructuredapproach. Routledge. Heagney, J., 2016.Fundamentals of project management. Amacom. Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and projectsuccessindifferentprojectgovernancecontexts.InternationalJournalofProject Management,33(6), pp.1377-1392. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kerzner, H., 2017.Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons. Kerzner, H., 2018.Project management best practices: Achieving global excellence. John Wiley & Sons. Larson, E.W. and Gray, C.F., 2015. A Guide to the Project Management Body of Knowledge: PMBOK (®) Guide. Project Management Institute.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT MANAGEMENT Lock, D., 2017.The essentials of project management. Routledge. Martinelli, R.J. and Milosevic, D.Z., 2016.Project management toolbox: tools and techniques for the practicing project manager. John Wiley & Sons. Nicholas,J.M.andSteyn,H.,2017.Projectmanagementforengineering,businessand technology. Routledge. Schwalbe, K., 2015.Information technology project management. Cengage Learning. Turner, R., 2016.Gower handbook of project management. Routledge. Verzuh, E., 2015.The fast forward MBA in project management. John Wiley & Sons. Walker, A., 2015.Project management in construction. John Wiley & Sons.
11PROJECT MANAGEMENT Appendix Appendix 1: Updated milestone plan WBSTask NameDuratio nStartFinishPredecessorsResource NamesCost 1.8 Milestone 1: Planning to Perth projectphase completion 0 days Mon 29-01- 18 Mon 29- 01-188project consultant/manager$0.00 2.6 Milestone2: Completion of the pre packing phase 0 daysFri16- 02-18 Fri16- 02-1815project consultant/manager$0.00 3.4 Milestone 3: Completionof packing phase 0 daysTue 06- 03-18 Tue06- 03-1815,20project consultant/manager$0.00 4.3 Milestone 4: Completion of the execution phase 0 days Wed 21-03- 18 Wed 21- 03-1824project consultant/manager$0.00 5.4 Milestone 5: Completionof projectclosure and unpacking 0 days Mon 09-04- 18 Mon 09- 04-1829$0.00 Appendix 2: Updated task list WBSTask NameDurationStartFinishPredecessorsResource NamesCost 0 Scheduling Jeff'sfamily shifting project 70 days Tue 02-01- 18 Mon 09-04- 18 $15,000.00 1Planningto move to Perth20 daysTue 02- 01-18 Mon 29- 01-18$1,760.00
12PROJECT MANAGEMENT 1.1 Sign off contractto currentlandlord due to new shift 2 daysTue 02- 01-18 Wed 03- 01-18$0.00 1.2 Estimation of allpossible cost (excludingthe between rent) 8 daysThu 04- 01-18 Mon 15- 01-182financial advisor$640.00 1.3 Feasibility studyofthe project 5 daysThu 18- 01-18 Wed 24- 01-183FS+2 daysfinancial advisor$400.00 1.4Procurement management plan5 daysTue 16- 01-18 Mon 22- 01-183project consultant/manager$720.00 1.5 Explaining thereasonfor shifttothe children 1 dayThu 25- 01-18 Thu25- 01-184$0.00 1.6 Contact to current school to approve transfer 1 dayTue 23- 01-18 Tue23- 01-185$0.00 1.7 Taking the transfer certificate 2 daysFri26- 01-18 Mon 29- 01-186,3,7$0.00 1.8 Milestone 1: Planning to Perth projectphase completion 0 days Mon 29-01- 18 Mon 29- 01-188project consultant/manager$0.00 2 Pre-packing phase(20th January, 2018) 14 daysTue 30- 01-18 Fri16- 02-18$7,670.00 2.1Contact for logistic services2 daysTue 30- 01-18 Wed 31- 01-189shifting cost[1]$2,800.00 2.2 Contract to anagentin SunshineCoast torentanew apartmentin Sunshine Coast 2 daysThu 01- 02-18 Fri02- 02-1811agent cost$112.00 2.3Collecting medicalrecords 3 daysThu 08-Mon 12-12FS+3 daysmedicinal cost[1]$1,250.00