FMEC Modeling & Security Issues: Weekly Progress Report
VerifiedAdded on  2023/06/11
|12
|1850
|79
AI Summary
This weekly progress report discusses the planning, issues, milestones, and outcomes of a research project on FMEC Modeling & Security Issues. It includes a clear distinction between current and proposed solutions, risk analysis, and future work.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
FMEC Modeling & Security Issues: Weekly Progress Report
Name of the Student
Name of the University
Author Note
1
Name of the Student
Name of the University
Author Note
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Week 2:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 2 DATE: Please Insert
PLANNING The research question will found by properly examining
the domain area of research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Completion of
information and
requirements
gathering in order
to formulate the
research question
It was assumed
that the feasibility
study of the
project will be
performed in the
first week before
moving on to
requirements
gathering
According to the
project plan, the
feasibility analysis
of the project was
performed and
successfully
completed in week
1. Various papers
are analyzed to
properly formulate
the research
questions.
The research
questions could
successfully be
identified by the
end of week 2
ISSUES As such no issues were faced
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Proper
Identification of the
research questions
helps in directing
the research in a
proper manner
Please Insert The research
questions were
formulated in and
effective manner
YES
2
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 2 DATE: Please Insert
PLANNING The research question will found by properly examining
the domain area of research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Completion of
information and
requirements
gathering in order
to formulate the
research question
It was assumed
that the feasibility
study of the
project will be
performed in the
first week before
moving on to
requirements
gathering
According to the
project plan, the
feasibility analysis
of the project was
performed and
successfully
completed in week
1. Various papers
are analyzed to
properly formulate
the research
questions.
The research
questions could
successfully be
identified by the
end of week 2
ISSUES As such no issues were faced
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Proper
Identification of the
research questions
helps in directing
the research in a
proper manner
Please Insert The research
questions were
formulated in and
effective manner
YES
2
Week 3:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 3 DATE: Please Insert
PLANNING Work breakdown structure of overall plan will be made in
order to verify its timescale that each section is
competing on decided time limits or not.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Completion of
Research plan
It was assumed
that all the
activities of the
research project
will be identified
and the research
plan will be
formulated by the
end of week 3
The researcher
was able to
develop a proper
project plan that
was drafted for
approval
This activity was
executed
successfully by
taking the help of
the professor and
within the
allocated time.
ISSUES Assuming the time required for collection of data was
difficult.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The work
breakdown
structure is
important to
determine the
timescale of each
activities
associated with the
research
Please Insert The work
breakdown structure
was prepared with
the assumed time
scale for the
research.
YES
3
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 3 DATE: Please Insert
PLANNING Work breakdown structure of overall plan will be made in
order to verify its timescale that each section is
competing on decided time limits or not.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Completion of
Research plan
It was assumed
that all the
activities of the
research project
will be identified
and the research
plan will be
formulated by the
end of week 3
The researcher
was able to
develop a proper
project plan that
was drafted for
approval
This activity was
executed
successfully by
taking the help of
the professor and
within the
allocated time.
ISSUES Assuming the time required for collection of data was
difficult.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The work
breakdown
structure is
important to
determine the
timescale of each
activities
associated with the
research
Please Insert The work
breakdown structure
was prepared with
the assumed time
scale for the
research.
YES
3
Week 4:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 4 DATE: Please Insert
PLANNING Different papers of the authors will be reviewed and
documented properly in order to document their findings
and contribution.
MILESTONE: PLANNED: ACTUAL: COMMENT:
In order to
successfully
complete the
secondary data
collection,
previously
published journals
were reviewed and
documented so
that the process of
data collection
becomes easier
It was planned
that the literature
review will act as
a support to the
secondary data
collection
It was possible to
review the
previously
published
literatures and
research papers
successfully
All the activities
associated with
review of the
previously
published
literature were
successfully
completed.
ISSUES Searching of the proper research papers was a time
consuming task.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
It is a difficult
phase of research
as the authenticity
of the research
papers is needed
to be analyzed
Please Insert In order to
complete the task in
a proper manner, an
extensive literature
search was
performed
YES
Week 5:
4
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 4 DATE: Please Insert
PLANNING Different papers of the authors will be reviewed and
documented properly in order to document their findings
and contribution.
MILESTONE: PLANNED: ACTUAL: COMMENT:
In order to
successfully
complete the
secondary data
collection,
previously
published journals
were reviewed and
documented so
that the process of
data collection
becomes easier
It was planned
that the literature
review will act as
a support to the
secondary data
collection
It was possible to
review the
previously
published
literatures and
research papers
successfully
All the activities
associated with
review of the
previously
published
literature were
successfully
completed.
ISSUES Searching of the proper research papers was a time
consuming task.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
It is a difficult
phase of research
as the authenticity
of the research
papers is needed
to be analyzed
Please Insert In order to
complete the task in
a proper manner, an
extensive literature
search was
performed
YES
Week 5:
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 5 DATE: Please Insert
PLANNING Research gap of each literature review will be founded in
order to examine that what work of the authors are still
pending to do.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Identification of the
research gaps from
the previously
published literature
It was assumed
that the gaps in
the literature will
be properly
analyzed in order
to eliminate the
issues associated
with the
The research gaps
could be identified
quite easily by
making use of the
documentation that
was prepared in
the previous week
Proper
identification of the
research gap was
essential in order
to examine the
works that the
authors are still
pending to do.
ISSUES Identifying the research gaps from all the previously
published journals and literatures were a difficult task.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Identification of the
research gap was
essential to
propose an
effective solution
Please Insert The researcher
was able to infer the
research gaps.
YES
5
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 5 DATE: Please Insert
PLANNING Research gap of each literature review will be founded in
order to examine that what work of the authors are still
pending to do.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Identification of the
research gaps from
the previously
published literature
It was assumed
that the gaps in
the literature will
be properly
analyzed in order
to eliminate the
issues associated
with the
The research gaps
could be identified
quite easily by
making use of the
documentation that
was prepared in
the previous week
Proper
identification of the
research gap was
essential in order
to examine the
works that the
authors are still
pending to do.
ISSUES Identifying the research gaps from all the previously
published journals and literatures were a difficult task.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Identification of the
research gap was
essential to
propose an
effective solution
Please Insert The researcher
was able to infer the
research gaps.
YES
5
Week 6:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 6 DATE: Please Insert
PLANNING The required data will be collected in order to prepare
data-set that will help in continuation of research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Successful
Completion of Data
Collection
Since in this
project mainly the
secondary data
will be collected,
collection of the
data from the
secondary
sources should
follow a planned
approach
The Data that was
needed for the
research project
could be collected
successfully from
the secondary
sources which
were previously
published research
papers and
journals
A successful data
collection was
necessary in order
to prepare the
data set that is
required for the
project
ISSUES As such no issues were faced while collection of dat
from secondary sources.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Precise Data
collection is an
important phase of
this research
project as the
solution to be
proposed largely
depends on the
proper analysis of
the data set.
Please Insert A structured
dataset is prepared
for analysis
YES
6
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 6 DATE: Please Insert
PLANNING The required data will be collected in order to prepare
data-set that will help in continuation of research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
Successful
Completion of Data
Collection
Since in this
project mainly the
secondary data
will be collected,
collection of the
data from the
secondary
sources should
follow a planned
approach
The Data that was
needed for the
research project
could be collected
successfully from
the secondary
sources which
were previously
published research
papers and
journals
A successful data
collection was
necessary in order
to prepare the
data set that is
required for the
project
ISSUES As such no issues were faced while collection of dat
from secondary sources.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Precise Data
collection is an
important phase of
this research
project as the
solution to be
proposed largely
depends on the
proper analysis of
the data set.
Please Insert A structured
dataset is prepared
for analysis
YES
6
Week 7:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 7 DATE: Please Insert
PLANNING Existing solutions of the problem will discuss along with
the proposed methodology in detail.
MILESTONE: PLANNED: ACTUAL: COMMENT:
After successful
data collection,
successful analysis
of the research
problem and
methodology
It was planned
that the viability of
the proposed
methodology will
be analyzed
Proper analysis of
the existing
solution and the
viability of the
proposed
methodology could
be analyzed
At the end of
week 7, it was
possible to
discuss the
proposed
methodology in
detail.
ISSUES As such no issues were faced
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Analysis of the
existing solution
was necessary in
order to formulate
the suitability of the
proposed solution.
Please Insert The proposed
methodology is
found to be effective
for the research.
YES
Week 8:
7
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 7 DATE: Please Insert
PLANNING Existing solutions of the problem will discuss along with
the proposed methodology in detail.
MILESTONE: PLANNED: ACTUAL: COMMENT:
After successful
data collection,
successful analysis
of the research
problem and
methodology
It was planned
that the viability of
the proposed
methodology will
be analyzed
Proper analysis of
the existing
solution and the
viability of the
proposed
methodology could
be analyzed
At the end of
week 7, it was
possible to
discuss the
proposed
methodology in
detail.
ISSUES As such no issues were faced
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Analysis of the
existing solution
was necessary in
order to formulate
the suitability of the
proposed solution.
Please Insert The proposed
methodology is
found to be effective
for the research.
YES
Week 8:
7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 8 DATE: Please Insert
PLANNING A clear and concise distinction will made between the
current and proposed solution of the particular domain
area.
MILESTONE: PLANNED: ACTUAL: COMMENT:
A clear distinction
of the current and
the proposed
Solution
It was planned
that the solution
that will be
proposed will be
more effective in
comparison to the
current solution
The effectiveness
of the proposed
solution could be
measured
The risks
associated with
the proposed
solution could be
identified and
mitigated
ISSUES The identification of the issues associated with the
proposed solution needed a concise and a practical
approach
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The clear
distinction of the
current and
proposed solution
will help in
determining the
success of the
project
Please Insert The milestone of
week 8 could be
completed
successfully
YES
8
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 8 DATE: Please Insert
PLANNING A clear and concise distinction will made between the
current and proposed solution of the particular domain
area.
MILESTONE: PLANNED: ACTUAL: COMMENT:
A clear distinction
of the current and
the proposed
Solution
It was planned
that the solution
that will be
proposed will be
more effective in
comparison to the
current solution
The effectiveness
of the proposed
solution could be
measured
The risks
associated with
the proposed
solution could be
identified and
mitigated
ISSUES The identification of the issues associated with the
proposed solution needed a concise and a practical
approach
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The clear
distinction of the
current and
proposed solution
will help in
determining the
success of the
project
Please Insert The milestone of
week 8 could be
completed
successfully
YES
8
Week 9:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 9 DATE: Please Insert
PLANNING Risk analysis of the overall research is made to verify the
risk that can occur within the research along with their
mitigation strategy
MILESTONE: PLANNED: ACTUAL: COMMENT:
Proper Risk
Assessment was
possible
The risk
management
steps were
planned prior its
implementation. It
was assumed that
the process of
risk management
will follow the
steps of risk
identification, risk
assessment and
risk mitigation
It was possible to
properly identify
the risks
associated with
project.
The risk
management was
one of the
important stages
of successful
completion of the
research project.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/
RESULTS:
FINISHED (Y/N)
Risk Analysis helps
in unveiling the
issues associated
with a project
Please Insert Risk management
process could be
successfully
executed
YES
9
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 9 DATE: Please Insert
PLANNING Risk analysis of the overall research is made to verify the
risk that can occur within the research along with their
mitigation strategy
MILESTONE: PLANNED: ACTUAL: COMMENT:
Proper Risk
Assessment was
possible
The risk
management
steps were
planned prior its
implementation. It
was assumed that
the process of
risk management
will follow the
steps of risk
identification, risk
assessment and
risk mitigation
It was possible to
properly identify
the risks
associated with
project.
The risk
management was
one of the
important stages
of successful
completion of the
research project.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/
RESULTS:
FINISHED (Y/N)
Risk Analysis helps
in unveiling the
issues associated
with a project
Please Insert Risk management
process could be
successfully
executed
YES
9
Week 10:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 10 DATE: Please Insert
PLANNING Expected outcomes will be documented properly in order
to compare it with actual outcomes of the research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
First draft of the
project
documentation
It was planned
that all the
research findings
will be properly
documented to
present to the
assessor
The documentation
could be completed
in time
The
documentation
helped in
structuring the
collected data.
ISSUES As such no issues were faced.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Proper
documentation is
essential in order
to prepare the final
report
Please Insert Timely drafting of
the prepared
document could be
achieved.
YES
10
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 10 DATE: Please Insert
PLANNING Expected outcomes will be documented properly in order
to compare it with actual outcomes of the research.
MILESTONE: PLANNED: ACTUAL: COMMENT:
First draft of the
project
documentation
It was planned
that all the
research findings
will be properly
documented to
present to the
assessor
The documentation
could be completed
in time
The
documentation
helped in
structuring the
collected data.
ISSUES As such no issues were faced.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Proper
documentation is
essential in order
to prepare the final
report
Please Insert Timely drafting of
the prepared
document could be
achieved.
YES
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Week 11:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 11 DATE: Please Insert
PLANNING Deliverables will be listed properly
MILESTONE: PLANNED: ACTUAL: COMMENT:
The list of
deliverables were
listed
It was planned to
properly identify
and list the
deliverables
The activities of
listing the
deliverables could
be completed
successfully.
This step was one
of the important
stages of success
project
completion.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Listing the
deliverables helps
in creation of the
checklist at the end
of the project that
will further help in
checking whether
all the deliverables
were met
Please Insert The deliverables
could be
successfully
submitted at the end
of week 11
YES
11
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 11 DATE: Please Insert
PLANNING Deliverables will be listed properly
MILESTONE: PLANNED: ACTUAL: COMMENT:
The list of
deliverables were
listed
It was planned to
properly identify
and list the
deliverables
The activities of
listing the
deliverables could
be completed
successfully.
This step was one
of the important
stages of success
project
completion.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Listing the
deliverables helps
in creation of the
checklist at the end
of the project that
will further help in
checking whether
all the deliverables
were met
Please Insert The deliverables
could be
successfully
submitted at the end
of week 11
YES
11
Week 12:
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 12 DATE: Please Insert
PLANNING Future work that is still pending to do will also be
documented in order to carry forward the same research
area and problem in nearby future.
MILESTONE: PLANNED: ACTUAL: COMMENT:
A plan for carry
forward future work
The plan will act
as a base for the
future works
The plan could be
made successfully
This is another
significant stage or
phase f a research
project. The
project should
include the scope
for future works.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Leaving a scope
for future work is
essential for
identifying the
issues with FMEC
Modeling that can
arise in future
Please Insert The future works
will address the
security issues that
could not covered in
this research
project.
YES
12
NAME: Please Insert
PROJECT TITLE: FMEC Modeling & Security Issues
WEEK NO: 12 DATE: Please Insert
PLANNING Future work that is still pending to do will also be
documented in order to carry forward the same research
area and problem in nearby future.
MILESTONE: PLANNED: ACTUAL: COMMENT:
A plan for carry
forward future work
The plan will act
as a base for the
future works
The plan could be
made successfully
This is another
significant stage or
phase f a research
project. The
project should
include the scope
for future works.
ISSUES As such no issues were identified.
DESCRIPTION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Leaving a scope
for future work is
essential for
identifying the
issues with FMEC
Modeling that can
arise in future
Please Insert The future works
will address the
security issues that
could not covered in
this research
project.
YES
12
1 out of 12
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.