ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Goonyella Riverside Mine History

Verified

Added on  2019/09/23

|7
|589
|97
Report
AI Summary
Goonyella Riverside Mine is a large open cut coal mine in Central Queensland, Australia. It started operation in 1971 and has undergone several changes in ownership and management over the years. The mine produces metallurgical coal and has a significant production output, with 12.4 million tonnes of coal produced in the year to July 2014. The mine uses various equipment such as excavators, draglines, drills, roof bolters, long wall miners, rock dusters, and shuttle cars. The resources and reserves of the mine are also reported according to US Securities and Exchange Commission (SEC) standards.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Goonyella Riverside Mine

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
History
Goonyella Riverside is a large open cut coking coal mine in the Bowen Basin. It is one of the
many coal mines in Central Queensland and is located at Moranbah about 30 Km north of the
township.
1971 Goonyella Mine commenced operation,
owned by CQCA joint ventures, managed by
Utah Development Co.
1982 Riverside Mine commenced operation, owned
by Thiess Dampier Mitsui, managed by BHP
1984 BHP purchased Utah International Inc., thus
major interest in both Goonyella and
Riverside
1989 CQCA’s Goonyella and BHP Mitsui’s
Riverside Mines management amalgamated,
to give improved operation while retaining
separate ownership
2000 Formal adoption of One Mine Plan enabling
optimum use of all site resources – people,
equipment and coal
2001 Formation of BHP Billiton Mitsubishi
Alliance; Owner of Goonyella and manager
of Riverside
Document Page
Location
Country Location Office
Australia Brisbane Coal Head Office
Australia Melbourne Global Headquarters
Australia Perth Iron Ore Head Office
Canada Saskatoon Potash Head Office
Chile Santiago Copper Head Office
Malaysia Kuala Lumpur Global Corporate Services
Centre
Singapore Singapore Marketing and Corporate
Office
UK London Corporate Office
US Houston Petroleum Head Office
US New York Corporate Office
Document Page
Production Output
The mine produced 12.4Mta of metallurgical coal in the year to July 2014, and output in the
current financial would not affected by the contract termination (Harvey,2015). Emily Perry said
that any potential production impact for 2015 will be reported by the organization in quarterly
production reports at time.
Year Net Output Raw Output
2013 182,582,379 231,442,262
2014 203,405,793 256,548,124
2015 205,268,763 257,242,288

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2013 2014 2015
0
50,000,000
100,000,000
150,000,000
200,000,000
250,000,000
300,000,000
Prouductivity
Net Output Raw Output
Mine Equipment
As per the view of Bureau of Labor Statistics, it is considered that the mining industry should
consists of five major segments like coal mining, non-metal mineral mining, metal ore mining,
gas and oil extracting and supporting activities such as resource transportation. Equipment are
differ as per the difference in segment. Equipment needed by Goonyella Riverside are shown in
below table:
List of Equipment Usage
Excavators It is used to break and remove earth
Draglines Draglines used to drag away dirt and expose
underlying coal or mineral deposits
Drills Drills are commonly used for extract gas and
oil
Document Page
Roof bolters Roof Bolters used to force bolts into roofs
Long wall miners It is used to remove large, rectangular
sections coals
Rock Dusters use to spray inert mineral dust over highly
flammable coal dust
Shuttle Cars use electric-powered shuttle cars to transport
coal from the coal bed to safer points in the
mine
Resources and Reserves
BHP Billiton Petroleum proved reserves are estimated and reported according to US Securities
and Exchange Commission (SEC) standards and have been determined in accordance with SEC
Rule 4-10(a) of Regulation S-X (Billiton,2012). Resources and Reserves of Goonyella Riverside
are shown in table:
Proved
developed
reserves at 30
June 2012-15
Australia United States Other Total
As of 30 June
2012
53.9 22.5 0.2 76.6
As of 30 June
2013
54.7 54.1 0.2 108.9
As of 30 June 46.0 75.0 - 121.0
Document Page
2014
Developed
reserves as of 30
June 2015
40.1 59.7 - 99.8
1 out of 7
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]