Hospital Management System: An Advanced Java Project Proposal
Verified
Added on 2024/05/20
|2
|555
|68
AI Summary
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
CSC8416 – Advanced Java Programming – Project Proposal Student Name:Student ID: HOSPITAL MANAGEMENT SYSTEM Abstract Hospital management administration project is an automated framework composed and modified to manage everyday hospital operations. The reason for the implementing project is to modernize the Management of Hospitals front desk. The application will be developed which is easy to use, basic, quick, and affordable. It manages the accumulation of patient's data, doctor’s data and so. Generally, it was done physically. Introduction Clinics manage the life and wellbeing of their patients. The project will keep up the patient's subtle elements, specialist's points of interest, billing details and facilities given by hospital (Segura, Campos& Morales 2016, p. 181-197). Motivation The motivation behind implementing this project is the automated hospital management. The project will maintain the patient’s details, doctor’s details and more. System structures Software requirements: Programming language: Advanced java IDE: NetBeans Database: XAMPPserver Web server: Phpmyadmin Hardware requirements: Processor: Intel core i5, Hard Disk: 40 GB, RAM: 1 GB Functions The application will maintain records for doctors, patient. The application also provides the details like billing, treatments and more. The application includes the register and login feature for new or existing user respectively (Barone, Peyton & Rizzolo 2015, p. 149- 165). User requirements Operating system: Windows XP/2003/7/8/10. CSC8416 – Advanced Java Programming
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
CSC8416 – Advanced Java Programming – Project Proposal Student Name:Student ID: Additional features If the user wants to change password then he can do so. Help option is also provided so as to resolve the user issues. Inherent complexities and challenges The database connectivity is the big challenge as all the information needs to be store and extract from the database. Project Plan ItemsActivity date rangeActivities 1Week 1-week 2An initial study of the project. 2Week 3-week 4Practicabilitystudy of the project. 3Week 5- week 6Requirement analysis. 4Week 7-week 8Requirement specification. 5Week 9- week10Logical and Physical design. 6Week 11-week 12Coding of the project 7Week 13Testing and implementation of the project. Conclusion The application designed will be easily adaptable to the changes as per the requirements. The efficiency of the system will be improved and a good GUI will be implemented. The application implemented will be secured and reliable. The project has good scope in future. References Cánovas-Segura, B, Campos, M, Morales, A et al. Prog ArtifIntell 2016, ‘Development of a clinical decision support system for antibiotic management in a hospital environment’,vol. 5, no. 3,pp. 181-197. Barone, D, Peyton, L, Rizzolo, F. et al. J Data Semant 2015, ‘Model- Based Management of Strategic Initiatives’, vol. 4, no. 3,pp. 149-165. CSC8416 – Advanced Java Programming