This assignment provides a detailed project plan for setting up a network for ABC company. The project involves designing a network topology, evaluating technologies, managing the project timeline, and allocating a budget of $537,600. The plan includes tasks such as client meeting, project analysis, hardware and software analysis, budget allocation, project schedule, network design, procurement of raw materials, network implementation, testing, and delivery. The assignment also touches on copyright and legal issues related to emerging technologies.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: ICT NETWORK ARCHITECTURE DESIGN
ICT network architecture design
Name of the Student:
Name of the University:
Author Note
ICT network architecture design
Name of the Student:
Name of the University:
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
ICT NETWORK ARCHITECTURE DESIGN
Table of Contents
Project Overview.............................................................................................................................3
Client Overview...............................................................................................................................3
Scope................................................................................................................................................3
Project Assessment Report..............................................................................................................4
Introduction..................................................................................................................................4
Project Findings...........................................................................................................................4
Project recommendations.............................................................................................................4
Project OHS Concerns.................................................................................................................5
Project Analysis and Design............................................................................................................5
Project Estimation Duration........................................................................................................6
Target Audience...........................................................................................................................7
Mock-Up Design.........................................................................................................................8
Project Management........................................................................................................................8
Project Evaluation of Technologies.............................................................................................8
Project Timeline...........................................................................................................................9
Budget..........................................................................................................................................9
Copyright and Legal Issues.........................................................................................................9
Project Sign Off.............................................................................................................................10
Bibliography..................................................................................................................................12
ICT NETWORK ARCHITECTURE DESIGN
Table of Contents
Project Overview.............................................................................................................................3
Client Overview...............................................................................................................................3
Scope................................................................................................................................................3
Project Assessment Report..............................................................................................................4
Introduction..................................................................................................................................4
Project Findings...........................................................................................................................4
Project recommendations.............................................................................................................4
Project OHS Concerns.................................................................................................................5
Project Analysis and Design............................................................................................................5
Project Estimation Duration........................................................................................................6
Target Audience...........................................................................................................................7
Mock-Up Design.........................................................................................................................8
Project Management........................................................................................................................8
Project Evaluation of Technologies.............................................................................................8
Project Timeline...........................................................................................................................9
Budget..........................................................................................................................................9
Copyright and Legal Issues.........................................................................................................9
Project Sign Off.............................................................................................................................10
Bibliography..................................................................................................................................12
2
ICT NETWORK ARCHITECTURE DESIGN
Project Overview
The implementation of a network is very essential for any type of business and this helps
the organization in the communication procedures. The project deals with the network set up of
ABC Company. The company has its branches located at various locations however as the
company is a startup they need a layout for their network to start with. The company has started
with three branches and office building for the headquarters as well. As the branches would carry
out the departmental procedures of the company while the headquarters would be assigned with
the administrative procedures.
Client Overview
The client here is the ABC Company who looking to Implement a network for their start
up. Hence, they require a proper network plan so that they can develop their network architecture
very efficiently. In addition to this, the clients would also require the major insights to the
project. This network would be the most important part of business for the clients. The customers
would also be benefited to a great extent as the response time for the network would decreased to
a great extent. Hence, all the business procedures of the company are to be integrated with the
network architecture of the company.
Scope
The project can be described as the following:
ï‚· The budget allotted by the company and scheduled time for the project is to be kept in
mind and the completion of the project is also to be accordingly.
ï‚· The network architecture should be able to integrate successfully with the business of the
company and should act towards the increase of efficiency of the business of the
company.
ï‚· The network layout should also be very precise and meet all the requirements of the
company.
ï‚· The current market standards and prices should be kept in mind and the project should be
completed with at least expenditure as possible.
ICT NETWORK ARCHITECTURE DESIGN
Project Overview
The implementation of a network is very essential for any type of business and this helps
the organization in the communication procedures. The project deals with the network set up of
ABC Company. The company has its branches located at various locations however as the
company is a startup they need a layout for their network to start with. The company has started
with three branches and office building for the headquarters as well. As the branches would carry
out the departmental procedures of the company while the headquarters would be assigned with
the administrative procedures.
Client Overview
The client here is the ABC Company who looking to Implement a network for their start
up. Hence, they require a proper network plan so that they can develop their network architecture
very efficiently. In addition to this, the clients would also require the major insights to the
project. This network would be the most important part of business for the clients. The customers
would also be benefited to a great extent as the response time for the network would decreased to
a great extent. Hence, all the business procedures of the company are to be integrated with the
network architecture of the company.
Scope
The project can be described as the following:
ï‚· The budget allotted by the company and scheduled time for the project is to be kept in
mind and the completion of the project is also to be accordingly.
ï‚· The network architecture should be able to integrate successfully with the business of the
company and should act towards the increase of efficiency of the business of the
company.
ï‚· The network layout should also be very precise and meet all the requirements of the
company.
ï‚· The current market standards and prices should be kept in mind and the project should be
completed with at least expenditure as possible.
3
ICT NETWORK ARCHITECTURE DESIGN
Project Assessment Report
Introduction
The ABC Company is mock company assumed for this report. The company is a startup
and should be provided with a network architecture that would provide the company with the
opportunity so that there is an increase of efficiency in the business procedures. This would also
help the company in communication and also increase the security of the data of the company.
The response time for the company should also be managed efficiently with the network
implementation. I as the network administrator have been approached by the client for
development of the network. Hence, the project plan has been developed for the implementation
of the network for the client. The project plan and the security policies that have been developed
has been provided in this report.
Project Findings
The major findings in the project are:
ï‚· The company has no previous network layout and hence, the network topology for the
company has to be developed from scratch.
ï‚· The network designed is also to be based on an organization with multiple branch since,
the company is situated across several locations.
ï‚· The staffs of the company also save their data on the network and hence, the flow of
traffic is also to be managed by this network.
Project recommendations
The following recommendations can be very useful for the project:
ï‚· Cloud based solution: It is recommended that a cloud based solution is adopted for the
implementation of the network. The cloud based solution would provide the network the
ability of efficient communication and reduce the response time.
ï‚· Efficient Monitoring: The network should be monitored regularly after implementation.
The implemented network is to be upgraded regularly so that the possible lagging in the
network can be avoided.
ï‚· Portal based communication network: In addition to the above recommendations it is
recommended that a portal be maintained for the company as the employees of the
ICT NETWORK ARCHITECTURE DESIGN
Project Assessment Report
Introduction
The ABC Company is mock company assumed for this report. The company is a startup
and should be provided with a network architecture that would provide the company with the
opportunity so that there is an increase of efficiency in the business procedures. This would also
help the company in communication and also increase the security of the data of the company.
The response time for the company should also be managed efficiently with the network
implementation. I as the network administrator have been approached by the client for
development of the network. Hence, the project plan has been developed for the implementation
of the network for the client. The project plan and the security policies that have been developed
has been provided in this report.
Project Findings
The major findings in the project are:
ï‚· The company has no previous network layout and hence, the network topology for the
company has to be developed from scratch.
ï‚· The network designed is also to be based on an organization with multiple branch since,
the company is situated across several locations.
ï‚· The staffs of the company also save their data on the network and hence, the flow of
traffic is also to be managed by this network.
Project recommendations
The following recommendations can be very useful for the project:
ï‚· Cloud based solution: It is recommended that a cloud based solution is adopted for the
implementation of the network. The cloud based solution would provide the network the
ability of efficient communication and reduce the response time.
ï‚· Efficient Monitoring: The network should be monitored regularly after implementation.
The implemented network is to be upgraded regularly so that the possible lagging in the
network can be avoided.
ï‚· Portal based communication network: In addition to the above recommendations it is
recommended that a portal be maintained for the company as the employees of the
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4
ICT NETWORK ARCHITECTURE DESIGN
company would be able to communicate freely among themselves while maintaining
their privacy.
Project OHS Concerns
With the implementation of the network the employees of the company might be facing
some health hazards in the workplace. The various type of network hazards that can damage the
health of the people involved in the work area are shot circuits and data hazards of different type.
The OHS policy should be developed by the company so that they follow the standards prevalent
in the market or else the staffs of the company might face a great deal of difficulties.
Project Analysis and Design
Project Estimation Duration
The estimated duration in which the project would be completed is 40 days.
Task Name Duration Start Finish
Network Design For ABC company 40 days Tue 5/1/18 Mon 6/25/18
Project Initiation 1 day Tue 5/1/18 Tue 5/1/18
Client Meeting 1 day Tue 5/1/18 Tue 5/1/18
Project Analysis 4 days Wed 5/2/18 Mon 5/7/18
Checking Network requirments 2 days Wed 5/2/18 Thu 5/3/18
Harware and Software Analysis 2 days Fri 5/4/18 Mon 5/7/18
Project Planning 9 days Tue 5/8/18 Fri 5/18/18
Budget allocation 1 day Tue 5/8/18 Tue 5/8/18
Project Schedule 1 day Wed 5/9/18 Wed 5/9/18
Network Design 7 days Thu 5/10/18 Fri 5/18/18
Project Implementation 17 days Mon 5/21/18 Tue 6/12/18
Procurment of raw meterials 3 days Mon 5/21/18 Wed 5/23/18
Network Implemetation 14 days Thu 5/24/18 Tue 6/12/18
ICT NETWORK ARCHITECTURE DESIGN
company would be able to communicate freely among themselves while maintaining
their privacy.
Project OHS Concerns
With the implementation of the network the employees of the company might be facing
some health hazards in the workplace. The various type of network hazards that can damage the
health of the people involved in the work area are shot circuits and data hazards of different type.
The OHS policy should be developed by the company so that they follow the standards prevalent
in the market or else the staffs of the company might face a great deal of difficulties.
Project Analysis and Design
Project Estimation Duration
The estimated duration in which the project would be completed is 40 days.
Task Name Duration Start Finish
Network Design For ABC company 40 days Tue 5/1/18 Mon 6/25/18
Project Initiation 1 day Tue 5/1/18 Tue 5/1/18
Client Meeting 1 day Tue 5/1/18 Tue 5/1/18
Project Analysis 4 days Wed 5/2/18 Mon 5/7/18
Checking Network requirments 2 days Wed 5/2/18 Thu 5/3/18
Harware and Software Analysis 2 days Fri 5/4/18 Mon 5/7/18
Project Planning 9 days Tue 5/8/18 Fri 5/18/18
Budget allocation 1 day Tue 5/8/18 Tue 5/8/18
Project Schedule 1 day Wed 5/9/18 Wed 5/9/18
Network Design 7 days Thu 5/10/18 Fri 5/18/18
Project Implementation 17 days Mon 5/21/18 Tue 6/12/18
Procurment of raw meterials 3 days Mon 5/21/18 Wed 5/23/18
Network Implemetation 14 days Thu 5/24/18 Tue 6/12/18
5
ICT NETWORK ARCHITECTURE DESIGN
Project Testing 8 days Wed 6/13/18 Fri 6/22/18
Network Testing 4 days Wed 6/13/18 Mon 6/18/18
Network Upgrades 4 days Tue 6/19/18 Fri 6/22/18
Project Delivery 1 day Mon 6/25/18 Mon 6/25/18
Project Sign Off 1 day Mon 6/25/18 Mon 6/25/18
Target Audience
The target audience in this project plan would be client, the employees of the client, the
network engineers and the hired technicians. The clients are very important as the project is
entirely designed for them and the employees of the company are also very important as they are
the ones who would be using the network. In addition to this the technicians working in this
project also have to be addressed properly as they would need to have knowledge about the
network they are deploying.
Mock-Up Design
Figure 1: Network Topology for ABC Company
Source: (created by Author)
ICT NETWORK ARCHITECTURE DESIGN
Project Testing 8 days Wed 6/13/18 Fri 6/22/18
Network Testing 4 days Wed 6/13/18 Mon 6/18/18
Network Upgrades 4 days Tue 6/19/18 Fri 6/22/18
Project Delivery 1 day Mon 6/25/18 Mon 6/25/18
Project Sign Off 1 day Mon 6/25/18 Mon 6/25/18
Target Audience
The target audience in this project plan would be client, the employees of the client, the
network engineers and the hired technicians. The clients are very important as the project is
entirely designed for them and the employees of the company are also very important as they are
the ones who would be using the network. In addition to this the technicians working in this
project also have to be addressed properly as they would need to have knowledge about the
network they are deploying.
Mock-Up Design
Figure 1: Network Topology for ABC Company
Source: (created by Author)
6
ICT NETWORK ARCHITECTURE DESIGN
Project Management
Project Evaluation of Technologies
For the evaluation of the project the overall performances of the business for the project
is to be evaluated. In addition to this, communication and security of the network is also to be
assessed. The access points of the network also require proper assessments.
Project Timeline
Budget
The total budget for the project is around $537,600.
Task Name Cost
Network Design For ABC company $537,600.00
Project Initiation $9,600.00
Client Meeting $9,600.00
Project Analysis $51,200.00
Checking Network requirments $35,200.00
Harware and Software Analysis $16,000.00
Project Planning $91,200.00
Budget allocation $17,600.00
Project Schedule $17,600.00
ICT NETWORK ARCHITECTURE DESIGN
Project Management
Project Evaluation of Technologies
For the evaluation of the project the overall performances of the business for the project
is to be evaluated. In addition to this, communication and security of the network is also to be
assessed. The access points of the network also require proper assessments.
Project Timeline
Budget
The total budget for the project is around $537,600.
Task Name Cost
Network Design For ABC company $537,600.00
Project Initiation $9,600.00
Client Meeting $9,600.00
Project Analysis $51,200.00
Checking Network requirments $35,200.00
Harware and Software Analysis $16,000.00
Project Planning $91,200.00
Budget allocation $17,600.00
Project Schedule $17,600.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7
ICT NETWORK ARCHITECTURE DESIGN
Network Design $56,000.00
Project Implementation $193,200.00
Procurment of raw meterials $14,800.00
Network Implemetation $178,400.00
Project Testing $182,800.00
Network Testing $112,400.00
Network Upgrades $70,400.00
Project Delivery $9,600.00
Project Sign Off $9,600.00
Copyright and Legal Issues
The new and emerging technologies are to be considered for the implementation of the
copyright issues. The law of evidences would be related to this project. In addition to, this
privacy law, copyright law and the patent law would also be involved to some extent for this
project.
Project Sign Off
1. Project Summary
Start Date Tuesday 5/1/18 Finish Date Monday 6/25/18
Project Duration 40 days
2. Project Goal
The main aim of the project is to set up a new
3. Project Deliverables
ICT NETWORK ARCHITECTURE DESIGN
Network Design $56,000.00
Project Implementation $193,200.00
Procurment of raw meterials $14,800.00
Network Implemetation $178,400.00
Project Testing $182,800.00
Network Testing $112,400.00
Network Upgrades $70,400.00
Project Delivery $9,600.00
Project Sign Off $9,600.00
Copyright and Legal Issues
The new and emerging technologies are to be considered for the implementation of the
copyright issues. The law of evidences would be related to this project. In addition to, this
privacy law, copyright law and the patent law would also be involved to some extent for this
project.
Project Sign Off
1. Project Summary
Start Date Tuesday 5/1/18 Finish Date Monday 6/25/18
Project Duration 40 days
2. Project Goal
The main aim of the project is to set up a new
3. Project Deliverables
8
ICT NETWORK ARCHITECTURE DESIGN
The project can be delivered by Monday 6/25/18.
The development of the project can be completed within $537,600.
4. Comments (If any)
Some testing procedures would be required for checking the possible entry points into the
network and sealing them off. Hence, some additional budget is to be allocated for the testing
procedures.
5. Document Signatures
Name Description Signature Date
CEO By signing this document, I
acknowledge that I have received
all the stated deliverables at the
agreed to quality levels.
Project Manager
Please enter your
name
By signing this document, I
acknowledge that I have
delivered all the stated
deliverables at the agreed to
quality levels.
ICT NETWORK ARCHITECTURE DESIGN
The project can be delivered by Monday 6/25/18.
The development of the project can be completed within $537,600.
4. Comments (If any)
Some testing procedures would be required for checking the possible entry points into the
network and sealing them off. Hence, some additional budget is to be allocated for the testing
procedures.
5. Document Signatures
Name Description Signature Date
CEO By signing this document, I
acknowledge that I have received
all the stated deliverables at the
agreed to quality levels.
Project Manager
Please enter your
name
By signing this document, I
acknowledge that I have
delivered all the stated
deliverables at the agreed to
quality levels.
1 out of 9
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.