ICT Project Management: Team Charter, Roles, Learning Cycles, Communication Plan and Reflection
VerifiedAdded on 2023/06/12
|15
|2747
|236
AI Summary
This report discusses the detailed analysis of team charter, roles and responsibilities, team rules and expectations, skill and knowledge inventory, communication plan, learning cycle and reflections for the project 'Implementation of Online Stud Farm Management System for Globex'.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head; ICT Project Management.
ICT Project Management
Name of student
Author;s Note
ICT Project Management
Name of student
Author;s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2
ICT PROJECT MANAGEMENT
Table of Contents
Introduction......................................................................................................................................3
Part One: Project Name/Team/Description.....................................................................................3
Project Name...............................................................................................................................3
Project Team................................................................................................................................3
Project Overview.........................................................................................................................4
Team Charter...............................................................................................................................4
Skills and Knowledge Inventory.................................................................................................5
Roles and Responsibilities...........................................................................................................6
Team Communications................................................................................................................7
Team Rules & Expectations............................................................................................................8
Part Two: Learning Cycles............................................................................................................10
Part Three: Communication Plan...................................................................................................12
Part Four: Reflection......................................................................................................................13
Conclusion.....................................................................................................................................13
Bibliography..................................................................................................................................15
ICT PROJECT MANAGEMENT
Table of Contents
Introduction......................................................................................................................................3
Part One: Project Name/Team/Description.....................................................................................3
Project Name...............................................................................................................................3
Project Team................................................................................................................................3
Project Overview.........................................................................................................................4
Team Charter...............................................................................................................................4
Skills and Knowledge Inventory.................................................................................................5
Roles and Responsibilities...........................................................................................................6
Team Communications................................................................................................................7
Team Rules & Expectations............................................................................................................8
Part Two: Learning Cycles............................................................................................................10
Part Three: Communication Plan...................................................................................................12
Part Four: Reflection......................................................................................................................13
Conclusion.....................................................................................................................................13
Bibliography..................................................................................................................................15
3
ICT PROJECT MANAGEMENT
Introduction
The utilization of project management principles and techniques become more helpful in large
extent to align the implication of various operations. The utilization of different consecutive
operations is aligned to execute different activities related with the project work. It also becomes
helpful to perform all functions related to all activities. In this assignment, it discusses about the
detailed analysis of team charter, roles and responsibilities, team rules and expectations, skill and
knowledge inventory etc. The application of all activities becomes proper for the project to be
aligned for outlining the use of various activities in the favor of various operations alignment.
Moreover, communication plan, learning cycle and reflections are also discussed in this
particular report. The uses of different progressive tasks are adjusted for having the better
undertaking of the project. All associated tasks become helpful for the detailed investigation of
group correspondences, parts and obligations, group rules, information stock etc.
Part One: Project Name/Team/Description
Project Name
The name of the undertaken project is ““Implementation of Online Stud Farm Management
System (OSFMS) for Globex”.
Project Team
The project team comprises of 4 people as listed below,
First Name Last Name Email Phone No.
ICT PROJECT MANAGEMENT
Introduction
The utilization of project management principles and techniques become more helpful in large
extent to align the implication of various operations. The utilization of different consecutive
operations is aligned to execute different activities related with the project work. It also becomes
helpful to perform all functions related to all activities. In this assignment, it discusses about the
detailed analysis of team charter, roles and responsibilities, team rules and expectations, skill and
knowledge inventory etc. The application of all activities becomes proper for the project to be
aligned for outlining the use of various activities in the favor of various operations alignment.
Moreover, communication plan, learning cycle and reflections are also discussed in this
particular report. The uses of different progressive tasks are adjusted for having the better
undertaking of the project. All associated tasks become helpful for the detailed investigation of
group correspondences, parts and obligations, group rules, information stock etc.
Part One: Project Name/Team/Description
Project Name
The name of the undertaken project is ““Implementation of Online Stud Farm Management
System (OSFMS) for Globex”.
Project Team
The project team comprises of 4 people as listed below,
First Name Last Name Email Phone No.
4
ICT PROJECT MANAGEMENT
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
Project Overview
In this paper, it mainly focuses on organization ‘Globex’ which is one the important client of
Virtucon. This organization have signed contract with Virtucon for the development of a online
farm stud management system for the delivery of project at exact time. The system is developed
to substitute the manual system already used in Globex and also helps to resolve all faced
problems which mainly occurred because of the deployment of manual system.
Team Charter
The team charter for the mentioned project ‘Implementation of Online Stud Farm Management
System for Globex’ consists of some different group members that are mentioned below:
Team Charter Document
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Address Email Phone No.
<<Please fill the
name of the
<<Please fill the
name of the
14/2, *******
street, Queensland,
_______@****mail.com +61-
XXXX-
ICT PROJECT MANAGEMENT
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
<<Please fill the
name>>
<<Please fill the
name>>
_______@****mail.co
m
+61-XXXX-XXXX
Project Overview
In this paper, it mainly focuses on organization ‘Globex’ which is one the important client of
Virtucon. This organization have signed contract with Virtucon for the development of a online
farm stud management system for the delivery of project at exact time. The system is developed
to substitute the manual system already used in Globex and also helps to resolve all faced
problems which mainly occurred because of the deployment of manual system.
Team Charter
The team charter for the mentioned project ‘Implementation of Online Stud Farm Management
System for Globex’ consists of some different group members that are mentioned below:
Team Charter Document
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Address Email Phone No.
<<Please fill the
name of the
<<Please fill the
name of the
14/2, *******
street, Queensland,
_______@****mail.com +61-
XXXX-
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
5
ICT PROJECT MANAGEMENT
student>> student>> Australia XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
5, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
16, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
12, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
Skills and Knowledge Inventory
The knowledge and skill required to complete this project is mainly depends on the
implementation of IT operations and services based on the deliverables of online stud farm
management system. Hence, it also elaborates about the implication of different operations
depending of the effective alignment of functionalities. It also becomes helpful successive
system management of the development of all project operations.
Skills and Knowledge Inventory
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Skills and Knowledge Required
ICT PROJECT MANAGEMENT
student>> student>> Australia XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
5, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
16, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
12, ******* street,
Queensland,
Australia
_______@****mail.com +61-
XXXX-
XXXX
Skills and Knowledge Inventory
The knowledge and skill required to complete this project is mainly depends on the
implementation of IT operations and services based on the deliverables of online stud farm
management system. Hence, it also elaborates about the implication of different operations
depending of the effective alignment of functionalities. It also becomes helpful successive
system management of the development of all project operations.
Skills and Knowledge Inventory
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Skills and Knowledge Required
6
ICT PROJECT MANAGEMENT
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Project Management skills, leadership
skills, encouraging
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Planning knowledge, Activity listing
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Web functions Testing Skills,
innovation
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Online system Development Skills, IT
tools knowledge
Roles and Responsibilities
Skills and Knowledge Inventory
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Roles and Responsibilities
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Supervision of all project activities as well as
ensuring of the timely and successful completion of
project.
<<Please fill the
name of the
<<Please fill the
name of the
Preparation of effective schedule with exact resource
allocation based on dependencies.
ICT PROJECT MANAGEMENT
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Project Management skills, leadership
skills, encouraging
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Planning knowledge, Activity listing
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Web functions Testing Skills,
innovation
<<Please fill the name of
the student>>
<<Please fill the name of
the student>>
Online system Development Skills, IT
tools knowledge
Roles and Responsibilities
Skills and Knowledge Inventory
Project Name: ‘Implementation of Online Stud Farm Management System for Globex’
First Name Last Name Roles and Responsibilities
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Supervision of all project activities as well as
ensuring of the timely and successful completion of
project.
<<Please fill the
name of the
<<Please fill the
name of the
Preparation of effective schedule with exact resource
allocation based on dependencies.
7
ICT PROJECT MANAGEMENT
student>> student>>
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Examining of different web functions of developed
system depending of different security issues along
with their modifications.
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Development of the online system to achieve better
online management for Globex.
Team Communications
Meeting Schedule: The proper meeting schedule to achieve better communication of the
mentioned project is planned below:
24th April, 2018- Project commencement meetings
30th April, 2018- Proper Resource Allocation Meeting based on demands
15th May, 2018- Project Progress Meeting
25st May, 2018- Project Board Meeting
15th July, 2018- Project Success Meeting based on pre-determined criterion
Communication Processes: The communication process acts as a vital part to define the whole
process of project required information transfer. In this project “Implementation of Online Stud
Farm Management System for Globex” consider 3 types of information communication like
project meetings, emails and creating documenting work and timely reports. The process of
ICT PROJECT MANAGEMENT
student>> student>>
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Examining of different web functions of developed
system depending of different security issues along
with their modifications.
<<Please fill the
name of the
student>>
<<Please fill the
name of the
student>>
Development of the online system to achieve better
online management for Globex.
Team Communications
Meeting Schedule: The proper meeting schedule to achieve better communication of the
mentioned project is planned below:
24th April, 2018- Project commencement meetings
30th April, 2018- Proper Resource Allocation Meeting based on demands
15th May, 2018- Project Progress Meeting
25st May, 2018- Project Board Meeting
15th July, 2018- Project Success Meeting based on pre-determined criterion
Communication Processes: The communication process acts as a vital part to define the whole
process of project required information transfer. In this project “Implementation of Online Stud
Farm Management System for Globex” consider 3 types of information communication like
project meetings, emails and creating documenting work and timely reports. The process of
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
8
ICT PROJECT MANAGEMENT
project meetings is supported with the creation of proper alignment of all associated functions.
The way of sharing emails and chat facility become useful to serve the important factor to line up
the improvised communication way that occurred in the project. Lastly, the creation of report and
documentation work is one of the integral ways to transfer different project related information
throughout this whole project lifecycle. The understanding of all activities is adjusted to have the
proper arrangement of enhanced practical works. The work of 'Usage of Online Stud Farm
Management System for Globex' requires different 3 techniques of the proper data sharing
process.
Team Rules & Expectations
Overall Team Goal: The team has the basic goal to align all activities of the information
processing system of the project named ‘Implementation of Online Stud Farm Management
System for Globex’. The team mainly wants to arrange various operations related to the
deployment of effective process in Globex. The main of this project is the implementation of
“Online Stud Farm Management System” for the deployment of various modernized activities in
Globex. However, this group mainly requires undertaking various successful tasks to support the
execution arrangement for the better activity improvement. Hence, the consequence of all these
exercises to become helpful for the better services organization is considered for the
implementation of this project. The objective of venture is to development is talks about Online
Stud Farm Management System to support the sending of better exercises of Globex.
Team Values: The project team of “Implementation of Online Stud Farm Management System
for Globex” is answerable to do better project completion that helps Globex to implement all
their related functions. The ethical working capabilities, information security, sense of teamwork
are some of team values of project team.
ICT PROJECT MANAGEMENT
project meetings is supported with the creation of proper alignment of all associated functions.
The way of sharing emails and chat facility become useful to serve the important factor to line up
the improvised communication way that occurred in the project. Lastly, the creation of report and
documentation work is one of the integral ways to transfer different project related information
throughout this whole project lifecycle. The understanding of all activities is adjusted to have the
proper arrangement of enhanced practical works. The work of 'Usage of Online Stud Farm
Management System for Globex' requires different 3 techniques of the proper data sharing
process.
Team Rules & Expectations
Overall Team Goal: The team has the basic goal to align all activities of the information
processing system of the project named ‘Implementation of Online Stud Farm Management
System for Globex’. The team mainly wants to arrange various operations related to the
deployment of effective process in Globex. The main of this project is the implementation of
“Online Stud Farm Management System” for the deployment of various modernized activities in
Globex. However, this group mainly requires undertaking various successful tasks to support the
execution arrangement for the better activity improvement. Hence, the consequence of all these
exercises to become helpful for the better services organization is considered for the
implementation of this project. The objective of venture is to development is talks about Online
Stud Farm Management System to support the sending of better exercises of Globex.
Team Values: The project team of “Implementation of Online Stud Farm Management System
for Globex” is answerable to do better project completion that helps Globex to implement all
their related functions. The ethical working capabilities, information security, sense of teamwork
are some of team values of project team.
9
ICT PROJECT MANAGEMENT
Code of Ethics: the statement of code of ethics for this project named “Implementation of Online
Stud Farm Management System” is:
“The project team must work in harmony, supporting the development of effective system, and
forming the use of the information technology for aligning the effective operation development
for Globex”.
Rules and Expectations: A different rule as well as expectations for this implemented project is
mainly aligned to form all functions of this system. Some of these set of rules and expectation is
listed below:
Participation of the project team in all important decision- making meetings
Exchange of information to all stakeholder of this project
Declaration of various conflicts within all project members
Establishment of different effective communication ways in this organization.
Signatures: The signatures of this particular project are mentioned below:
<<name of the student>>
<<name of the student>>
Project Manager
<<name of the student>>
<<name of the student>>
Project Planner
ICT PROJECT MANAGEMENT
Code of Ethics: the statement of code of ethics for this project named “Implementation of Online
Stud Farm Management System” is:
“The project team must work in harmony, supporting the development of effective system, and
forming the use of the information technology for aligning the effective operation development
for Globex”.
Rules and Expectations: A different rule as well as expectations for this implemented project is
mainly aligned to form all functions of this system. Some of these set of rules and expectation is
listed below:
Participation of the project team in all important decision- making meetings
Exchange of information to all stakeholder of this project
Declaration of various conflicts within all project members
Establishment of different effective communication ways in this organization.
Signatures: The signatures of this particular project are mentioned below:
<<name of the student>>
<<name of the student>>
Project Manager
<<name of the student>>
<<name of the student>>
Project Planner
10
ICT PROJECT MANAGEMENT
<<name of the student>>
<<name of the student>>
Project Web Tester
<<name of the student>>
<<name of the student>>
Project Website Developer
Part Two: Learning Cycles
19th April, 2018- Project Kick off meetings
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
26th April, 2018- Project Resource Allocation Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
ICT PROJECT MANAGEMENT
<<name of the student>>
<<name of the student>>
Project Web Tester
<<name of the student>>
<<name of the student>>
Project Website Developer
Part Two: Learning Cycles
19th April, 2018- Project Kick off meetings
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
26th April, 2018- Project Resource Allocation Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
11
ICT PROJECT MANAGEMENT
15th May, 2018- Project Progress Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
31st May, 2018- Project Board Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
16th July, 2018- Project Success Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
ICT PROJECT MANAGEMENT
15th May, 2018- Project Progress Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
31st May, 2018- Project Board Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
16th July, 2018- Project Success Meeting
Organizer- <<name of the student>>
Scribe- <<name of the student>>
<<name of the student>>
<<name of the student>>
12
ICT PROJECT MANAGEMENT
Part Three: Communication Plan
Stakeholder
name
Information to
be shared
Frequency
of
information
exchange
Location of
information
exchange
Purpose of
communication
Mechanism for
communication
Hardcopy, pdf,
ppt, word,
email, etc
Who What When Where Why How
Client Project
Progress
information
would be
transferred
Once Board
Meetings
The information
mainly be transferred
with the client about
project progress.
Face to face talk
during project
board meeting
Investor Use of budget
resources for
the project
progress
Monthly In hand The information of
resource application
in project are
discussed with all
types of investors for
the better
understanding of all
budget requirements.
Resource Usage
Report
User Working
manual of the
online stub
management
system
Once In hand The manuals and
training document
helps the user to the
accurate operations
of system.
Training
Manuals and
reports
Project
Manager
Problems and
operation status
for the project
Weekly Online The operation status
and the problems
faced during the
project activities
would be conveyed
to the project
manager
Emails and Chats
ICT PROJECT MANAGEMENT
Part Three: Communication Plan
Stakeholder
name
Information to
be shared
Frequency
of
information
exchange
Location of
information
exchange
Purpose of
communication
Mechanism for
communication
Hardcopy, pdf,
ppt, word,
email, etc
Who What When Where Why How
Client Project
Progress
information
would be
transferred
Once Board
Meetings
The information
mainly be transferred
with the client about
project progress.
Face to face talk
during project
board meeting
Investor Use of budget
resources for
the project
progress
Monthly In hand The information of
resource application
in project are
discussed with all
types of investors for
the better
understanding of all
budget requirements.
Resource Usage
Report
User Working
manual of the
online stub
management
system
Once In hand The manuals and
training document
helps the user to the
accurate operations
of system.
Training
Manuals and
reports
Project
Manager
Problems and
operation status
for the project
Weekly Online The operation status
and the problems
faced during the
project activities
would be conveyed
to the project
manager
Emails and Chats
13
ICT PROJECT MANAGEMENT
Project
team
Client
requirements,
quality
expectations,
and resource
allocation
limitation
Once Online The operation
category and
different problems
occurred in all
project activities will
be discussed with the
project manager.
Emails and Chats
Part Four: Reflection
My personal experience as a team leader is alike with the understanding of leadership quality. In
terms of managing of project work, I developed numbers of leadership qualities like cool,
integrity, team building, proper communication etc which helps to operate and manage a project
in successful manner. Apart from that, it becomes important to gain better capabilities of project
management. The suitable project management assists to complete the undertaken project within
the estimated budget and time in successful way.
The capabilities and skills that an IT professional need to be maintained are discussed below:
Administrative skills: they must have the skills to elaborate all types of assets that are
useful for any whole project work.
Specialized skills: they also need to have the better knowledge and skills in different
types of programming languages and software that can be employed in an effective
manner.
Conclusion
It also be concluded that the implementation of various operations in the project
“Implementation of Online Stud Farm Management System for Globex” are supported by the
formation of different activities alignment. The leadership skills of project manager help to align
ICT PROJECT MANAGEMENT
Project
team
Client
requirements,
quality
expectations,
and resource
allocation
limitation
Once Online The operation
category and
different problems
occurred in all
project activities will
be discussed with the
project manager.
Emails and Chats
Part Four: Reflection
My personal experience as a team leader is alike with the understanding of leadership quality. In
terms of managing of project work, I developed numbers of leadership qualities like cool,
integrity, team building, proper communication etc which helps to operate and manage a project
in successful manner. Apart from that, it becomes important to gain better capabilities of project
management. The suitable project management assists to complete the undertaken project within
the estimated budget and time in successful way.
The capabilities and skills that an IT professional need to be maintained are discussed below:
Administrative skills: they must have the skills to elaborate all types of assets that are
useful for any whole project work.
Specialized skills: they also need to have the better knowledge and skills in different
types of programming languages and software that can be employed in an effective
manner.
Conclusion
It also be concluded that the implementation of various operations in the project
“Implementation of Online Stud Farm Management System for Globex” are supported by the
formation of different activities alignment. The leadership skills of project manager help to align
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
14
ICT PROJECT MANAGEMENT
the supervision of the successive development of project work. On other side, the administrative
framework helps to shaping the proper arrangement of different progressive administrative
works. The effective association and proper administration helps to form the arrangement
sequence of various tasks that are aligned with the enhancement of different progressive
administrative functions.
ICT PROJECT MANAGEMENT
the supervision of the successive development of project work. On other side, the administrative
framework helps to shaping the proper arrangement of different progressive administrative
works. The effective association and proper administration helps to form the arrangement
sequence of various tasks that are aligned with the enhancement of different progressive
administrative functions.
15
ICT PROJECT MANAGEMENT
Bibliography
Hwang, B. G., & Ng, W. J. (2013). Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project
Management, 31(2), 272-284.
Larson, E. W., &Gray, C. (2013). Project Management: The Managerial Process with MS
Project.McGraw-Hill.
Lock, D., (2017). The essentials of project management. Routledge.
Martinelli, R. J., & Milosevic, D. Z. (2016). Project management toolbox: tools and techniques
for the practicing project manager.John Wiley & Sons.
Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., &Segner, R. O. (2015). Construction
project management.John Wiley & Sons.
Walker, A., (2015). Project management in construction. John Wiley & Sons.
Zheng, X., Le, Y., Chan, A.P., Hu, Y. & Li, Y., (2016). Review of the application of social
network analysis (SNA) in construction project management research. International
journal of project management, 34(7), pp.1214-1225.
ICT PROJECT MANAGEMENT
Bibliography
Hwang, B. G., & Ng, W. J. (2013). Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project
Management, 31(2), 272-284.
Larson, E. W., &Gray, C. (2013). Project Management: The Managerial Process with MS
Project.McGraw-Hill.
Lock, D., (2017). The essentials of project management. Routledge.
Martinelli, R. J., & Milosevic, D. Z. (2016). Project management toolbox: tools and techniques
for the practicing project manager.John Wiley & Sons.
Sears, S. K., Sears, G. A., Clough, R. H., Rounds, J. L., &Segner, R. O. (2015). Construction
project management.John Wiley & Sons.
Walker, A., (2015). Project management in construction. John Wiley & Sons.
Zheng, X., Le, Y., Chan, A.P., Hu, Y. & Li, Y., (2016). Review of the application of social
network analysis (SNA) in construction project management research. International
journal of project management, 34(7), pp.1214-1225.
1 out of 15
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.