Running head: VERBANIA INC. SOCIAL MEDIA IT SOLUTION 1
Verbania Inc. Social Media Information Technology (IT) Solution
Information Technology (IT) Assignment | Social Media Assignment_1
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 2
TABLE OF CONTENTS
Section 1: Planning and System Requirements...............................................................................4
Section 2: System Analysis...........................................................................................................13
Section 3: System Design..............................................................................................................20
Section 4: System Development....................................................................................................33
Section 5: System Implementation and Maintenance....................................................................47
References......................................................................................................................................56
Information Technology (IT) Assignment | Social Media Assignment_2
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 3
SECTION 1: PLANNING AND SYSTEM REQUIREMENTS
The website deployment has become important for the deployment of the improved
processes and the formation of the profound development method (Holland, 2016). The
deployment of the operations would be formed for carrying out the modification of the website
development. The software development would allow the implication of the profound system
integration. The deployment of the operations would result in forming the improved functional
analysis.
The following assignment would be formed for analyzing the requirements of the system
development. The integration system analysis would be formed for carrying out the development
of the social website. The high-level plan would be implied for developing the improved
functional schedule for the implementation of the social media website.
Pertinent Requirements of Verbania Inc.
The pertinent requirements of the social media website development would include the
tools, software, and other requirements of the project (John & Swapna, 2017). The deployment
of the functions would allow the development of the project. The requirements of the
organization are,
Creation of user account: The first requirement of Verbania Inc. is the development of
user account and profile on the website for ensuring the collection of the data and information
about the customers. The website developed would require the identification of the user and
collecting the data of the customers on a single website. When the customers would login at the
website, the information and data entered at the website for making the profile would be stored
in an integrated database that would result in forming the modification of the user accounts.
Information Technology (IT) Assignment | Social Media Assignment_3
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 4
Creation of Discussion Forums and Posting: The discussion forums and posting would
be formed for developing the improved communication with the customers. According to Thum
et al. (2014), the various discussion forums and posts would help the customers for conveying
their views, requirements, and ideas to Verbania Inc. The alignment of the strategies while
keeping in mind the customer’s views would help in developing the improved functional
operations.
Search Capability of People: The search capability of the people would allow the
development of the improved functional analysis. The use of website development would allow
the intake of the improved system development. The website would allow them to integrate the
person to person searching for the operations.
Game and Calendar Component: The implication of the website function would allow
the formation of the effective and improved functional operation development. The gaming and
calendar component would allow the integration of the operations. The deployment of the
operations would help in forming the consideration of the system development for the
organization.
Solution for Verbania Inc.
The development of the website for the organization would provide the ease of the
operations for the organization processing (Laporte, Hebert & Mineau, 2014). The development
of the website would help in integrating the functional development of the operations for the
modification of the effective and improved system alignment and development. The integration
of the operations would be formed for integration of the system performance and deployment.
Information Technology (IT) Assignment | Social Media Assignment_4
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 5
The alignment of the system development would align the formation of the improved operations.
The website development would allow the deployment of the alignment methods.
High Level Plan for Implementation
The project of developing a Website of Verbania Inc. is implicit in forming an effective
website that would help the organization for aligning the improved functionality with operations.
The implementation plan consists of four phases namely Initialization, Execution, Testing, and
Training and Documentation (Ma & Lee, 2015). The initialization phase consists of human
resource employment, establishment of responsibilities, employment of high level project
manager, feasibility analysis of website connection, sustainability analysis of the website
requirements, organizational policy development for website, development of plan, and plan
approval. The execution phase consists of designing of the website, user interface development,
integrated database is formed, alignment of resources, modifications of the website, accessibility
checklist is developed, and security functions are aligned. The testing phase consists of black box
testing, white box testing, compatibility testing, and website developed. The training and
documentation consists of training manuals are formed, training is provided to the staffs and
user, training is completed, final documents are made, documents are reviewed, and sign off the
documents (Danielson et al., 2016). The Implementation Plan for the Website of the Verbania
Inc. is given in the table shown directly below.
WB
S Task Name Durati
on Start Finish Predeces
sors
0 Implementation Plan for
Website of Verbania Inc
57
days
Mon
2/5/18
Tue
4/24/18
Information Technology (IT) Assignment | Social Media Assignment_5
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 6
1 Initialization 19
days
Mon
2/5/18
Thu
3/1/18
1.1 Human Resource employment 5 days Wed
2/7/18
Tue
2/13/18 4
1.2 Establishment of
Responsibilities 3 days Wed
2/14/18
Fri
2/16/18 2
1.3 Employment of High Level
Project Manager 2 days Mon
2/5/18
Tue
2/6/18
1.4 Feasibility Analysis of Website
Connection 4 days Mon
2/19/18
Thu
2/22/18 3
1.5 Sustainability analysis of the
Website Requirements 3 days Mon
2/19/18
Wed
2/21/18 3
1.6 Organizational Policy
Development for website 2 days Mon
2/19/18
Tue
2/20/18 3
1.7 Development of Plan 4 days Fri
2/23/18
Wed
2/28/18 5, 6, 7
1.8 Plan Approval 1 day Thu
3/1/18
Thu
3/1/18 8
2 Execution 16
days
Fri
3/2/18
Fri
3/23/18
2.1 Designing of the Website 5 days Fri 3/2/18 Thu
3/8/18 9
2.2 User Interface Development 3 days Fri 3/9/18 Tue
3/13/18 11
2.3 Integrated Database is formed 4 days Wed
3/14/18
Mon
3/19/18 12
2.4 Alignment of Resources 2 days Fri 3/9/18 Mon
3/12/18 11
2.5 Modifications of the Website 3 days Tue
3/13/18
Thu
3/15/18 14
2.6 Accessibility Checklist is 2 days Fri 3/9/18 Mon 11
Information Technology (IT) Assignment | Social Media Assignment_6
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 7
developed 3/12/18
2.7 Security Functions are aligned 4 days Tue
3/20/18
Fri
3/23/18 13, 16
3 Testing 4 days Mon
3/26/18
Thu
3/29/18
3.1 Black Box testing 3 days Mon
3/26/18
Wed
3/28/18 17
3.2 White Box testing 3 days Mon
3/26/18
Wed
3/28/18 17
3.3 Compatibility testing 3 days Mon
3/26/18
Wed
3/28/18 17
3.4 Website Developed 1 day Thu
3/29/18
Thu
3/29/18 19, 20, 21
4 Training and Documentation 17
days
Fri
3/30/18
Mon
4/23/18
4.1 Training Manuals are formed 3 days Fri
3/30/18
Tue
4/3/18 22
4.2 Training is provided to the
staffs and users 7 days Wed
4/4/18
Thu
4/12/18 24
4.3 Training is completed 1 day Fri
4/13/18
Fri
4/13/18 25
4.4 Final Documents are made 3 days Mon
4/16/18
Wed
4/18/18 26
4.5 Documents are Reviewed 2 days Thu
4/19/18
Fri
4/20/18 27
4.6 Sign off the documents 1 day Mon
4/23/18
Mon
4/23/18 28
5 Project is Closed 1 day Tue
4/24/18
Tue
4/24/18 29
Information Technology (IT) Assignment | Social Media Assignment_7
VERBANIA INC. SOCIAL MEDIA IT SOLUTION 8
Specific and Detailed Requirements
The website development for Verbania Inc. will require the use of development tools.
The database development will involve the development of a systematic and efficient
management system.
Serial No Component Description
1. User The users of the network infrastructure are
divided into three categories such as the internal users,
external users and the end users.
2. Network The network is designed according to the
requirement of the company and divided into three layers
such as the core, access and the distribution layer.
3. Website Interface The website interface is formed for accessing the
functions of the organization with the help of the website.
The website interface developed would be compatible for
all platforms.
4. Functions Functions of the website include input of
characters and numbers (including characters), storage to
the cloud network, integrated database, and alignment of
the improved operations.
5. Database Database developed would be compatible for the
development of integrated database alignment. The
deployment of the operations would be formed for
integrating the deployment of the operations.
6. Switches A pair of layer 3 switches are used for the
perimeter distribution layer and cat 6 cables are used for
interconnecting the different hardware devices installed
in different location of the building.
7. Routers Two fusion routers are used for virtualization of
the service and balancing the load on the core network. It
is also used for the management of the VPN connection
and allows the remote users to connect with the core
components of the network.
8. Server Access The server access layer devices are connected
with the data center devices for increasing the availability
Information Technology (IT) Assignment | Social Media Assignment_8

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Creation of a Simple Business Design
|4
|730
|97

BSBMGT517 - Manage operational plan - Assgnment
|18
|3104
|163

Aboriginal and Torres Strait Island Assignment
|18
|4298
|50

Information System Development Project for Retail Organization
|26
|7418
|45

Unit 14 Website Design Sample Assignment
|5
|1236
|184

Research Project for Eco Solutions
|21
|4586
|29