Integrated Infrastructure Project Management

This page intentionally left blank FFIRS 01/05/2011 16:5:55 Page 1 Toward More Sustainable Infrastructure

8 Pages1568 Words203 Views
   

Added on  2023-04-11

About This Document

This document provides an analysis of the Hyderabad Metro Rail Project, focusing on the demand, projected benefits, and stakeholder expectations. It also discusses the impact of the project on the environment and society, as well as the lessons learned from its execution. The document highlights the need for proper planning, stakeholder management, and environmental assessment in large construction projects.

Integrated Infrastructure Project Management

This page intentionally left blank FFIRS 01/05/2011 16:5:55 Page 1 Toward More Sustainable Infrastructure

   Added on 2023-04-11

ShareRelated Documents
Running head: INTEGRATED INFRASTRUCTURE PROJECT MANAGEMENT
PROJ6011: Integrated Infrastructure Project Management
A Case Study of Hyderabad Metro Rail Project
Name of the Student:
Name of the University:
Author Note
Integrated Infrastructure Project Management_1
1INTEGRATED INFRASTRUCTURE PROJECT MANAGEMENT
Table of Contents
1. Overview of the selected project......................................................................................................2
2. Analysis of the project......................................................................................................................2
2.1 Demand, Projected Benefits and Stakeholder expectations.......................................................2
2.1.1 Demand for the project and the projected benefit(s) to stakeholders..................................2
2.1.2 Strategic value of the project and Stakeholder expectations...............................................3
2.2 Impact of the project...................................................................................................................3
2.2.1 Impact of the project on the environment and/or society....................................................3
2.2.2 Role of project leadership to address the impacts...............................................................4
2.3 Environmental-impact or other factors being overlooked in the planning stage.......................4
2.4 Scope for improvement in project execution.............................................................................5
2.5 Leadership lessons learnt from the project.................................................................................5
References............................................................................................................................................7
Integrated Infrastructure Project Management_2
2INTEGRATED INFRASTRUCTURE PROJECT MANAGEMENT
1. Overview of the selected project
Hyderabad metro railway project is one of the largest metro railway projects in the world. It
is the largest metro railway project ever taken in India through the private public partnership mode
(Limited, Rail & Overview, 2019). Demand for seamless transportation system is rising in the urban
cities and it is difficult to achieve for various reasons. Proper management of transportation in
major developing urban cities is complex because of the continual growth that is being experienced
by the urban population, congestion, ownership of the private vehicle, and the fragility that the
public transportation systems are having (Kulshreshtha et al., 2017). These complexities and issues
are having a significant impact on the households, businesses and urban community at large which
hampers growth in the economy along with hampering the social development in a proper and also
affects the health and environment as well.
2. Analysis of the project
2.1 Demand, Projected Benefits and Stakeholder expectations
2.1.1 Demand for the project and the projected benefit(s) to stakeholders
Hyderabad, being a major technology driven city in India requires robust infrastructure for
managing traffic and associated environmental issues. Population of Hyderabad city is estimated at
around 10 million which is projected to 13.6 million within 2021. In order to address transportation
demand of the huge population, the implementation of the Hyderabad metro railway project is in
demand as it promises to deliver a fast, secure and economical transportation solution to the public.
The possibility of the Hyderabad metro railway project to offer an urban transport system that is
ecologically sustainable increase the demand for the project.
Projected benefits to the stakeholders:
Reduced cost for travel
Increase of safety for the travel
Increased connectivity (Pilaka & Nallathiga, 2015)
Integrated Infrastructure Project Management_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
DMKT5008 Digital Marketing
|30
|6477
|53

Private Public Partnership in Project
|8
|1463
|268

Quality Management Plan and Procurement Management : Assignment
|5
|1033
|285

Transport Planning and Policy
|11
|3159
|460

Systems Thinking - Assignment
|12
|3456
|33

Project Management for California High-Speed Rail Project
|13
|3255
|473