logo

Upgrade of Network for Credit Crunch Company

Assignment 2 for the course ICT120 - Introduction to Computer Networks, which is a task to be submitted on Blackboard. The assignment is worth 30% of the total assessment for the course and is due in Week 12. The assignment involves working on a debt recovery service for banks and other financial lending institutions, understanding network topologies and technologies, network media, IP addressing, and network protocols. The assignment will be checked for plagiarism and submission extensions will only be granted in exceptional circumstances.

10 Pages2035 Words204 Views
   

Added on  2022-10-01

About This Document

This report highlights the network upgrade for Credit Crunch Company, including migration to IPv6, structured cabling plan, network topology diagram, IP addressing, and addition of PBX phone system.

Upgrade of Network for Credit Crunch Company

Assignment 2 for the course ICT120 - Introduction to Computer Networks, which is a task to be submitted on Blackboard. The assignment is worth 30% of the total assessment for the course and is due in Week 12. The assignment involves working on a debt recovery service for banks and other financial lending institutions, understanding network topologies and technologies, network media, IP addressing, and network protocols. The assignment will be checked for plagiarism and submission extensions will only be granted in exceptional circumstances.

   Added on 2022-10-01

ShareRelated Documents
INTRODUCTION TO COMPUTER NETWORKS 1
ICT120: INTRODUCTION TO COMPUTER NETWORKS TASK 2
By (Student Name)
(Course Name)
(Tutor’s Name)
(Date)
Upgrade of Network for Credit Crunch Company_1
INTRODUCTION TO COMPUTER NETWORKS 2
Executive summary
Credit Crunch is an organization that operates debt recovery service for
banks and other financial institutions. For the last ten years. The organization
requires an upgrade of its system. The organization is located in Sydney for
its head office, and staff. The organization operates predictive Dialler
software that is connected to telephony board which makes calls to debtors
and debtor database software which is a client/server DBMS. This report will
highlight how CC will go about in upgrading its network.
Upgrade of Network for Credit Crunch Company_2
INTRODUCTION TO COMPUTER NETWORKS 3
Table of Contents
Executive summary.........................................................................................2
Table of Figures...............................................................................................4
1.0 Introduction...............................................................................................5
2.0 Network upgrade.......................................................................................5
2.1 Structured Cabling plan..........................................................................6
2.1.0 Justification of GPON plan.................................................................6
2.2. Network topology diagram....................................................................6
2.3 IP addressing..........................................................................................7
3.0 Addition site, VoIP or redundant Servers...................................................7
Upgrade of Network for Credit Crunch Company_3

End of preview

Want to access all the pages? Upload your documents or become a member.