IT Procure and Vendor Management Case Study Analysis
Verified
Added on 2023/06/13
|5
|718
|269
AI Summary
This case study analysis discusses the importance of body language, email monitoring, mission statements, and supervisor's request in IT procure and vendor management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: IT PROCURE AND VENDOR MANAGEMENT Case study analysis Name of the student: Name of the university: Author note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 IT PROCURE AND VENDOR MANAGEMENT Answer 1: Yes, body language is one of the ways ofcommunicating the thoughts, feelings and emotions. Viewing it from the other perspective, body language can also be a way for not communicating all of the thoughts and expressions in fear of taunts and mocking (Kerzner and Kerzner 2017). Answer 2: Emailmonitoringinworkplacewoulddependontheapproachofthepersonnel. Situations like conflicts, harassments, discriminations and delay in the execution of the business activities would arise the need for email monitoring. However, the managers would not be able to see the workplace activities directly. They would be dependent on the emails from the head of the departments regarding the progress (Christopher, 2016). Answer 3: Mission statements make the personnel aware of the goals and objectives, which they have to fulfill. If the personnel are provided with safe and comfortable workplace conditions, they would be able to expose better performance. If adequate resources are provided, they would be able to carry out the business activities in an efficient and effective manner. This efficiency would help in fulfilling the identified and specified objectives (Lee 2014). Answer 4a: The supervisor’s motive for request might be for assessing the approach of the staffs towards the morale and the policies introduce. This motive is appropriate in terms of estimating the next courses of action. This approach reflects the concern of the manager towards ensuring
2 IT PROCURE AND VENDOR MANAGEMENT the wellbeing of the staffs (McNeil, Frey & Embrechts, 2015). This aligns with the essential functions of the supervisor. Answer 4b: If I am the compliant, I am liable to follow the orders and instructions of the supervisor. He asked to survey my colleagues, which I failed to do, would affect my activities. Along with this, it also affects the supervisor’s schedule, as I proved incapable of doing the assigned tasks. Apart from this, my colleagues would also be affected, as they provided low ratings for the system management. Answer 4c: If I am the compliant, then there are hidden costs for maintenance regarding the systems and the labor charges. These are crucial for the functioning of the systems. The expenditure of the costs needs to be maintained for stabilizing the financial parameter. Using excel can be effective in terms of averting the loss of financial data. Along with this, using excel would reduce the manual labor. Answer 4d: First, I excavate the reasons why the staffs provided low ratings for the morale and employment policies. I think face-to-face discussions would prove effective in terms of assessing the approach of the staffs towards the undertaken steps. I feel evaluation is necessary before implementing any decision or policy. When the staffs are giving low ratings, there must be some drawback. Evaluation possesses the flexibility to highlight these drawbacks. Sending drafts of the drawbacks and the planned changes would help the managers in estimating the additional
3 IT PROCURE AND VENDOR MANAGEMENT resources needed for altering the workplace scenario. Maintaining consistency in the execution of evaluation would help in upgrading the standards and quality of the workplace activities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 IT PROCURE AND VENDOR MANAGEMENT References Christopher, M. (2016).Logistics & supply chain management. Pearson UK. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Lee, S.S., 2014. Management information systems.Management,166137(01), p.02. McNeil, A. J., Frey, R., & Embrechts, P. (2015).Quantitative risk management: Concepts, techniques and tools. Princeton university press.