Labuan Square Redevelopment Project

   

Added on  2022-09-01

4 Pages688 Words32 Views
 | 
 | 
 | 
Running Head: PROJECT MANAGEMENT
Project Management: Video Transcript
Name of the Student
Name of the University
Labuan Square Redevelopment Project_1

1PROJECT MANAGEMENT
Start of the Presentation
Hello everyone! I hope all of you are doing well. Today, I am going to present to you the
project plan for the redevelopment of Labuan square including very specific knowledge areas
that are specified by the Project Management Body of Knowledge (PMBOK).
Labuan Square Redevelopment Project
Let’s start with the background of the project that we will be focusing on in this
presentation. In this project, we need to construction a two storey building including various
specifications as well as demolish ten shops on the west of Labuan Square. As you can see, it is
quite understandable from these requirements that significant demolition and construction works
are necessary in the project along proper design and planning.
The main parameters for any project include three main boundaries – scope, time and
budget. For the redevelopment of Labuan square, the primary scope involves demolition of ten
shops and construction of a two storeyed building. The time allocated for the project is 300
working days and the allocated budget is $2,250,000.
Now, there are several methodologies using which we can execute our project. However,
I suggest we use the waterfall model since this is a construction based project and it will benefit
from the processes involved in the waterfall model.
The schedule for our project is estimated through the work breakdown structure method
in which we break down the project to work packages and schedule each of them separately. The
Labuan Square Redevelopment Project_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Techniques and Tools
|18
|3057
|39

ERP Project Management - Assignment
|20
|3963
|29

Labuan Square Redevelopment Analysis Report
|19
|3466
|26

Project Environment Critical Analysis Labuan Square
|22
|2986
|23

Project Assessment Task
|8
|1612
|76

Implementation of VMware Vsphere and Technologies for Simple Studios Pty Ltd
|4
|981
|46