Introduction......................................................................................................................................4
Main Body.......................................................................................................................................4
Execution and control of the project through application of PRINCE-2 model..........................4
End of Project Evaluation report.................................................................................................6
Conclusion.......................................................................................................................................8
REFRENCES...................................................................................................................................9
Execution and Control of Project through PRINCE-2 Model_2

Introduction
Project management is the process by which various applications like method, skills,
knowledge is being followed. This is done in order to make project achievable with the
objectives in the specified period of time and also budget is handled to make proper utilization of
money spent over a project. It makes an desired goals to be achieved and for this only
appropriate approach is applied with controlling and managing execution in effective manner.
After making completion of report end project is being prepared by the manager of project for
gaining outcome over evaluating of lessons to be learnt. So, there should be proper management
and execution of project is very effective. When the report is completed then there has to be a
preparation of report which is known as end project report that has been prepared by manger of
project to gain outcomes for evaluating and lessons learning possible. It makes completion of
project in future in better manner by covering all flaws that were there in previous project with
effective manner. In this report execution and control of an project is being related through
launching of an event by QA Higher Education College that can publish technological
constructed building with number of students that can be used for attracting students. Application
of PRINCE-2 model is to be used for controlling of entire project is to be made successful.
Reflection with self-competence is achieved with executing of roles and responsibilities that is
done with the help of end of project report.
Main Body
Execution and control of the project through application of PRINCE-2 model
In order to make completion of project and attaining of desired result is to be achieved
within stipulation of time and utilization of budget this is very important to make effective
approach to be applied for controlling and executing of project in planned manner. So, that
product or services that is being produced with helping of quality requirements of customers and
gaining of high satisfaction to be achieved. This is important to deal with activities related for
project and controlling of data related by gathering analysis with efficacy of cost within related
time period. Also managing of project is done. Controlling of project is the process that is being
used for measuring aspects of project which is helpful in marking out problems that can occur in
a project to gain better outcomes to be achieved. Various process are included in controlling of
project which makes project planning, budgeting, risk management, change management,
forecasting, performing management etc. All these processes can help QA Higher Education
College in maximising the quality of the project related with launching technological constructed
building so that the admissions in college can increase. It can also help in improving the brand
image of college in market as it will be able to effectively meet the changing learning
requirements of students in an efficient manner.
PRINCE2 this considered to be agronomy for Project IN Controlled Environment process
that is based over method which is helpful in managing of project from the very beginning in
order to gain efficacy of result. Such model is effectively applied by QA Higher Education
College is going to be helped in making college building technology equipped that helps students
in improving learning experience along with creating and advance learning environment for
Execution and Control of Project through PRINCE-2 Model_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Execution and Control of Project through PRINCE-2 Model
|10
|2890
|28

Execution and Control of Project through PRINCE-2 Model
|9
|2817
|1

Execution and Control of Project through PRINCE-2 Model
|10
|2866
|1

Execution and Control of Project through PRINCE-2 Model
|9
|3006
|61

Execution and Control of Project through PRINCE-2 Model
|10
|3072
|41

Execution and Control of Project through PRINCE-2 Model
|9
|2760
|23