Leadership IT: Rejuvenating Warcraft Ltd with IT Solutions
Verified
Added on  2023/06/11
|21
|3732
|281
AI Summary
This article discusses how IT solutions can help Warcraft Ltd in enhancing their business growth. It includes a SWOT analysis, cost-benefit analysis, budget estimate, and schedule estimate. The article also talks about the primary objective of the project, which is to develop an app that will run on iPhone as well as android devices.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: LEADERSHIP IT Leadership it Name of the Student Name of the University Author’s note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1LEADERSHIP IT Table of Contents Background and business objectives................................................................................................................................................................2 SWOT analysis.................................................................................................................................................................................................4 Cost Benefit Analysis.......................................................................................................................................................................................6 Budget estimate..............................................................................................................................................................................................12 Schedule estimate...........................................................................................................................................................................................13 Potential Risks................................................................................................................................................................................................15 Innovation.......................................................................................................................................................................................................16 References......................................................................................................................................................................................................18
2LEADERSHIP IT Background and business objectives Warcraft Ltd is the company who is responsible to develop as well as promote the video live action battle game to the field. A live-action role play gaming is one sort of role-playing game where the parties can be able to demonstrate their characters. The participants of the game achieve their goal within a fictional setup and there the participants of the game can be able to interact with each other. The participants will have to strictly follow the rule of the game and must complete it. Event arrangers or the game masters define the rules of the game and assist the participants in playing the game. The managing director of the company is Jack Johnson. He is currently observing reduction of players in the company. He is trying hard however, he fails to retain players. Jack has planned to re-design their website. He also wants to enhance the app. The managing director wants a complete rejuvenation thus they want to improvise the marketing strategy as well. The latest strategy will help them to embellish their business growth. For this reason he is seeking assistance from an IT company. Jack wants to take help from IT Consultant. The IT Consultant is working for the Tech Solutions over three months in their web development as well as mobile app development. Tech Solutions has sent attender request to rejuvenate their website and develop a utility app for Warcraft Ltd. Luke Harrison is the CEO of Tech Solutions. Donna Smith is the Director as well as Mobile Development department of Tech Solutions and they have prioritised the Warcraft project.
3LEADERSHIP IT The primary investment for the project is around $1,70,000 in the initial year, in the second year they invest about $25,000 and in the third year about $240,000. Tech Solutions need discount rate of 10%. The market analyst has assumed the cash inflow of the project as follows-. They are expecting that the project will make about 22% ROI and it will go along the business model of Tech Solutions. The primary objective off the project is to develop an app that will run on iPhone as well as android devices. The app will enable the clients to enrol and pay for the lessons. The app will have other functionalities like it can aid in booking tours and watching videos. It can also help them in hire clothing, re-training and contact other participants. The app will facilitate the customers of Warcraft to subscribe to newsletters of Warcraft. The users of Warcraft can be able to access maps of all the venues and they can be able to view the videos showcasing all the facilities. The app must have the ability to perform the overall ranking of the game centre both in terms of services and the training. Luke and Donna of Tech Solutions have appointed a project manager to take up the project of Warcraft. It will be his responsibility to develop an app such that it can facilitate Warcraft in carrying out the business objectives. The IT Consultant will assist the project manager from the start to end in accomplishing the project. The project manager decides to take up the waterfall methodology to carry out the project activities. The project stakeholders associated with the project can face several issues while conducting the project. The stakeholders have come from several educational background and thus a conflict can create. The project plan will be developed which consists of the marketing strategy. The project plan must be approved by the all the stakeholders and will require the client’s sign off before proceed on with the project. The project plan developed will have the project timeline information, project budget information and the project dependencies.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4LEADERSHIP IT SWOT analysis Strength Warcraft will use license for using the software. The transaction licensing model will evaluate the use of Warcraft software as per transaction basis. The software vendors get a continuous cash flow, and this enhances the transaction volume as more and more stakeholders involve in the project. Since Warcraft is opting for redesigning the app and the website the approach can certainly assist them. The proposed Warcraft app will facilitate the customers or the users they will not have to pay heavy monthly or yearly. Warcraft can certainly reduce the cost over head of the business operations they conduct. The app will contain the features like the pay-as-you-model. The users can pay for the game according to their convenience at any time from any devices. The model can pay them flexibility and several benefits. The customers or the users of Warcraft can be able to subscribe the application. The subscription licensing enables the users to enjoy unlimited service of the software. The subscription licensing will consist of varied subscription models and it will help Warcraft users to choose the appropriate model of their choice. Thus the subscription feature of the app can provide them several opportunities to earn money. The subscription package will certainly reduce the usage of pirated copy of Warcraft game. The customers will be highly facilitated and it will definitely reduce any additional costs involved. Weakness The users of Warcraft once takes the service of Warcraft will have to stick to their services. Warcraft will offer periodic updates and the users after paying a huge amount of revenue for the software usage will have to stick to the Warcraft even they are dissatisfied. Thus they most provide a feedback form feature in the proposed app, it will let them know how they are providing services to the customers or the users. In case
5LEADERSHIP IT of Warcraft the adoption of new technology services can be challenging. Tech Solutions will design the website and will develop the app and will host their website and relevant services to the cloud. Tech Solutions will maintain the software and the database as well. Warcraft will have to pay money on monthly basis and yearly basis to use the cloud services. Moreover, there are security and privacy related issues, they can be Tech Solutions will have access to all the data of Warcraft. Warcraft willpay heavy amount thus they will have to spend money on other items wisely. Opportunity Warcraft with the aid of the website and the app can provide enhanced services to the customers. Their services will be hosted on the cloud and so the customers can register for their live action role-playing game services and can make the payment online. Warcraft can opt for digital marketing and with some attractive features can enhance their business. They can attract customers with several lucrative features for enjoying the live action role-playing game. Thus their market share will increase; their productivity will take a leap. The app and the website will certain enhance their SEO ranking and this will fetch them competitive advantage. In this way they can become popular and can come close to more and more customers. However, the app will provide a lot of benefits. The customers can see the newsletter; they can get all the necessary updates on the smart phone. The website and the app will have ‘contact us’ customer service features. Warcraft can stay connected with the customers all the time and can provide excellent service to the customers.
6LEADERSHIP IT Cost Benefit Analysis Cost-Benefit - INPUT VALUES Warcraft App Project Scope$5,240.00 Detailed Analysis of Warcraft Project Requirements$7,280.00 Designing Warcraft App Project$3,640.00 Warcraft App Development$5,280.00 Total Development Cost$21,440.00 Testing The Warcraft App$3,600.00 Warcraft App Training$4,320.00 Warcraft Project Documentation$6,240.00
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7LEADERSHIP IT Total Operational Cost$14,160.00 Warcraft App Deployment$4,560.00 Post Implementation Detailed Review$6,720.00 Total Benefit$11,280.00 Discount Rate Used22.00% ProjectCost-Benefit Analysis Analysis Variables:Enter values for the cost-benefit analysis in the INPUT_VALUES worksheet.
8LEADERSHIP IT Discount Rate Used22.00% Annual Benefits$ 11,280.00 Annual Operational Costs$ 14,160.00 One-TimeDevelopment Cost $ 21,440.00 Year of Project 012345TOTALS Economic Benefit$0.00$$$$$
9LEADERSHIP IT 11,280.0011,280.0011,280.0011,280.0011,280.00 Discount Rate1.00000.81970.67190.55070.45140.3700 PV of Benefits$0.00$9,245.90$7,578.61$6,211.97$5,091.78$4,173.59 NPV of all BENEFITS$0.00$ 9,245.90 $ 16,824.51 $ 23,036.48 $ 28,128.26 $ 32,301.86 $ 32,301.86 One-Time COSTS$(21,440.00 ) Recurring Costs$0.00$ (14,160.00) $ (14,160.00) $ (14,160.00) $ (14,160.00) $ (14,160.00)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13LEADERSHIP IT Budget estimate Task NameResource NamesCost Warcraft App Project Scope$5,240.00 Considering Warcraft App Project ScopeIT Management Staff$1,400.00 Defining Preliminary ResourcesIT Project Manager$1,920.00 Checking Resources Required for the App ProjectIT Project Manager$1,920.00 Detailed Analysis of Warcraft Project Requirements$7,280.00 Conducting Need Analysis for Warcraft App ProjectIT Management Staff$1,680.00 Draft Preparation of Warcraft App Project SpecificationsIT Management Staff$1,400.00 Preparing Preliminary Budget for the AppIT Management Staff,IT Project Manager$4,200.00 Designing Warcraft App Project$3,640.00 Detailed Specifications Review for the App ProjectIT Business Analyst$1,680.00 Gaining Approvals to Proceed FurtherIT Business Analyst$1,960.00 Warcraft App Development$5,280.00 Detailed Review of App SpecificationsIT Coder$1,680.00 Assigning Development Staff for the App ProjectIT Coder$1,920.00 Developing the Warcraft AppIT Coder$1,680.00 Testing the Warcraft App$3,600.00 Conducting Unit TestsIT Tester$1,920.00 Conducting Integration TestsIT Tester$1,680.00 Warcraft App Training$4,320.00 Creating Training Specifications for learning the App functionalitiesTrainer$1,440.00 Finalizing Training Materials for the Warcraft ProjectTrainer$1,440.00 Training Materials Developed for the Warcraft App ProjectTrainer$1,440.00 Warcraft Project Documentation$6,240.00 Development of User ManualsTechnical Communicators$1,680.00
14LEADERSHIP IT User Manuals DevelopmentTechnical Communicators$1,680.00 User Documentation Detailed ReviewTechnical Communicators$1,440.00 Development of Help SpecificationsTechnical Communicators$1,440.00 Warcraft App Deployment$4,560.00 Analysis of Strategy for Final DeploymentDeployment Team$1,680.00 Creating Deployment MethodologyDeployment Team$1,440.00 Creating the Software Maintenance TeamDeployment Team$1,440.00 Post Implementation Detailed Review$6,720.00 Documentation Preparation For the lessons to be learnedIT Project Manager$1,600.00 Distribution to team membersIT Project Manager$2,560.00 Post Implementation Complete ReviewIT Project Manager$2,560.00 Schedule estimate Task NameDurationStartFinishPredecessors Warcraft App Project Scope17 daysWed 06-06-18Thu 28-06-18 Considering Warcraft App Project Scope5 daysWed 06-06-18Tue 12-06-18 Defining Preliminary Resources6 daysWed 13-06-18Wed 20-06-182 Checking Resources Required for the App Project6 daysThu 21-06-18Thu 28-06-183 Detailed Analysis of Warcraft Project Requirements18 daysFri 29-06-18Tue 24-07-18 Conducting Need Analysis for Warcraft App Project6 daysFri 29-06-18Fri 06-07-184 Draft Preparation of Warcraft App Project Specifications5 daysMon 09-07-18Fri 13-07-186 Preparing Preliminary Budget for the App7 daysMon 16-07-18Tue 24-07-187 Designing Warcraft App Project13 daysWed 25-07-18Fri 10-08-18 Detailed Specifications Review for the App Project6 daysWed 25-07-18Wed 01-08-188 Gaining Approvals to Proceed Further7 daysThu 02-08-18Fri 10-08-1810 Warcraft App Development22 daysMon 13-08-18Tue 11-09-18
15LEADERSHIP IT Detailed Review of App Specifications7 daysMon 13-08-18Tue 21-08-1811 Assigning Development Staff for the App Project8 daysWed 22-08-18Fri 31-08-1813 Developing the Warcraft App7 daysMon 03-09-18Tue 11-09-1814 Testing the Warcraft App15 daysWed 12-09-18Tue 02-10-18 Conducting Unit Tests8 daysWed 12-09-18Fri 21-09-1815 Conducting Integration Tests7 daysMon 24-09-18Tue 02-10-1817 Warcraft App Training18 daysWed 03-10-18Fri 26-10-18 Creating Training Specifications for learning the App functionalities6 daysWed 03-10-18Wed 10-10-1818 Finalizing Training Materials for the Warcraft Project6 daysThu 11-10-18Thu 18-10-1820 Training Materials Developed for the Warcraft App Project6 daysFri 19-10-18Fri 26-10-1821 Warcraft Project Documentation26 daysMon 29-10-18Mon 03-12-18 Development of User Manuals7 daysMon 29-10-18Tue 06-11-1822 User Manuals Development7 daysWed 07-11-18Thu 15-11-1824 User Documentation Detailed Review6 daysFri 16-11-18Fri 23-11-1825 Development of Help Specifications6 daysMon 26-11-18Mon 03-12-1826 Warcraft App Deployment19 daysTue 04-12-18Fri 28-12-18 Analysis of Strategy for Final Deployment7 daysTue 04-12-18Wed 12-12-1827 Creating Deployment Methodology6 daysThu 13-12-18Thu 20-12-1829 Creating the Software Maintenance Team6 daysFri 21-12-18Fri 28-12-1830 Post Implementation Detailed Review21 daysMon 31-12-18Mon 28-01-19 Documentation Preparation For the lessons to be learned5 daysMon 31-12-18Fri 04-01-1931 Distribution to team members8 daysMon 07-01-19Wed 16-01-1933 Post Implementation Complete Review8 daysThu 17-01-19Mon 28-01-1934
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16LEADERSHIP IT Potential Risks The first risk is overreliance over security monitoring software. Then there was insufficient system logging. The network and system devices have been allowing for various incidents and event logging. Besides, the people have been unable to do logging. As enables, the logs are frequently not saved and get reviewed by managements. The logging is also a tedious method. As not properly configured, the logs bog down the email inbox. Further, the technology innovations have been out spacing the securities. Here, the consumer demand for greatest and latest software packages have been driving develop to undertake shortcuts, using various outdated codes and testing new products for getting product at the marketplace. This has been resulted the software to put into production prior they are vetted against sufficiently against various security vulnerabilities or compatibility of systems. Further, Warcraft using the most updated version of those products must be testing that extensively before it gets installed to the production systems. Then there are outdates operating systems. Here, the older versions of softeares have been eventually turning to be unsupported by vendors. The vulnerabilities have been going unpatched and they are the first spot hackers focusing while trying to gain access to the systems. Then there is lack of encryption. This is the first line of defense to prevent various unauthorized access to the information for protecting that at rest and the others are in transit. Removing media has not been allowing data to get placed on them without making any replacements to develop any encrypted folders to encrypt and device to the overall device. Then there is data over user-owned mobile systems. This conflict between the user-owned and company owned devices has been continuing. Here, the employees have been using their mobile devices like smart phone and tablets for gaining access to systems around the Internet. The next one is IT diplomatic immunity under the organization. Warcraft has been seeing members of System Administrators and IT managements feeling exempting from system accessing various requirements that detailed under the policies of the organization like non-expiring passwords. The IT staffs have been
17LEADERSHIP IT reasoning they are getting vetted. However, the accounts of the employees has been possessing high level of permissions and accesses making them huge targets for different hackers. Innovation The securing of systems and controlling those regarding suspicious activities reduced the risk of different breaches. Development of enterprise-wide approach towards data security and supported by the management is the best way to secure Warcraft’s business. First of all they must understand uses of diversified portfolios to monitor those tools. Second they must consider any third-party software that must be allowing refining the process of logging in and then alerting the personnel for significant events and incidents. There has been combination of well managed SIEM tools along with strong login practices that can be helpful for various system defenses. Then a non-first adopter policy must be followed and the software must be allowed to prove them for about half time every year prior using that product. As Warcraft has been producing such applications, they must put specific concentration over the privacy from the beginning of the process of development. They must plan and track those primary systems for preventing systems to run various unsupported software. Next, Warcraft must be using third-party software tools for aiding with encryption. The tools are able to scan various outbound emails as far as sensitive data is needed and require senders to use the secure file lead sites or encrypt the information prior the transmission. Here the hard drives must be provided with complex-drive encryption unlocking data as the use logs into the device successfully. Next, the third-party applications must be allowing users to possess sandbox of data. This is a secured segment for Warcraft’s information to be accessible to mobile
18LEADERSHIP IT devices. This includes files and emails that is stored in the secured directory of the system of the organization. The employees must be permitted to gain access the usernames, passwords and two-factor authentications. As the mobile devices has stolen or lost, the organization data remains within the device and networks. It reduces the risks of breached or lost data. Next, the entire user reviews of settings and accounts are to be done about couple of times per year. In order to run the review, the member of security or the audit team must be used along with another qualified person external to IT. This helps in verifying that every personnel have been complying with those policies of IT. Moreoevr, Warcraft must encourage and educate their members of management who have been understood the necessities for protect systems and must be able to communicate necessitates across Warcraft. Additionally, they must be focusing over training, retentions and abilities for reducing various turnovers and create a strong team for IT security. The security must belong to the dedicated role like Chief information Security Officer and Security Analyst.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
19LEADERSHIP IT References Fellows, R.F. and Liu, A.M., 2015.Research methods for construction. John Wiley & Sons. Forsythe, P.J., 2015.Rethinking Industrial Shed Construction-Consider Timber. Hughes, W., Champion, R. and Murdoch, J., 2015.Construction contracts: law and management. Routledge. Jenkins, P., 2017.Using murder: The social construction of serial homicide. Routledge. Kim, S.H. and Choi, J.S., 2015. A Study on the Design Concepts and Main Construction Processes of the Coal Shed at Thermal Power Plant.Journal of the Korea Academia-Industrial cooperation Society,16(5), pp.3619-3626. Lou, X., Zhou, Y., Yang, J. and Chen, Z., 2014. Study on the Calculation Method of Light Shed on Rockfall Impact Protection.Advanced Materials Research. McNally, L., 2016.A semantics for the English existential construction. Routledge. Qin, Z., Zhou, Z., Li, H., Lin, J., Tang, Y., Gu, H., Yang, J., Huan, H., Zhang, X. and Yu, G., 2014. Design and Construction of Removable Deep-Litter Breeding Shed.Agricultural Science & Technology,15(12), p.2240.
20LEADERSHIP IT Tomkins, M.D., Huck, J.J., Dortch, J.M., Hughes, P.D., Kirbride, M.P. and Barr, I.D., 2018. Schmidt Hammer exposure dating (SHED): Calibration procedures, new exposure age data and an online calculator.Quaternary Geochronology,44, pp.55-62. Yafeng, C., Fuyong, H., Shihua, Z., Cheng, W., Feng, W. and Yishi, Y., 2016, September. Study on natural pollution accumulating characteristics of cap and pin suspension ceramic insulator with composite shed of DC 500kV transmission line in central China. InHigh Voltage Engineering and Application (ICHVE), 2016 IEEE International Conference on(pp. 1-4). IEEE.