Leadership and Operational Discovery Analytics - Industry Report
VerifiedAdded on 2023/06/04
|11
|2649
|249
AI Summary
This industry report discusses the importance of project management methodology, leadership style, estimation of proper budget, allocation of roles and responsibilities to the human resources involved in the context of operational and discovery analytics. The report includes a case study on Burger King and the use of AI in the restaurant industry.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Industry Report:
Leadership in
Operational and
Discovery analytics
Leadership in
Operational and
Discovery analytics
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
Introduction......................................................................................................................................1
Operational Project..........................................................................................................................1
Scope of the project................................................................................................................1
Natural leadership style..........................................................................................................1
Project management methodology.........................................................................................2
Budget of project....................................................................................................................3
Possible human resources involved........................................................................................3
Reflection.........................................................................................................................................3
Discovery Project: Case study on Burger King...............................................................................4
The risk of the project using predictive project analytics (PPA)............................................4
This project should be undertaken given the PPA relating to its impact................................5
Optimal leadership style for the project.................................................................................5
Project management methodology and integrate it with the leadership style........................5
The budget of project and why such an estimation may be difficult given the nature of
innovation...............................................................................................................................5
Team undertaking the project.................................................................................................6
Democratise the project across the business..........................................................................6
CONCLUSION................................................................................................................................7
REFERENCES................................................................................................................................8
Introduction......................................................................................................................................1
Operational Project..........................................................................................................................1
Scope of the project................................................................................................................1
Natural leadership style..........................................................................................................1
Project management methodology.........................................................................................2
Budget of project....................................................................................................................3
Possible human resources involved........................................................................................3
Reflection.........................................................................................................................................3
Discovery Project: Case study on Burger King...............................................................................4
The risk of the project using predictive project analytics (PPA)............................................4
This project should be undertaken given the PPA relating to its impact................................5
Optimal leadership style for the project.................................................................................5
Project management methodology and integrate it with the leadership style........................5
The budget of project and why such an estimation may be difficult given the nature of
innovation...............................................................................................................................5
Team undertaking the project.................................................................................................6
Democratise the project across the business..........................................................................6
CONCLUSION................................................................................................................................7
REFERENCES................................................................................................................................8
Introduction
Successful accomplishment of a project include various elements like project management
methodology, leadership style, estimation of proper budget, allocation of roles and
responsibilities to the human resources involved (Anderson, 2017). The present report include
discussion on Wendy’s case study analysis which is leading fast food chain of America the
company offers wide range of services and products to consumers. The company is finding
optimal location for new stores in which customization of menus at different location according
to the consumers needs demands and preferences is being needed. The discussion of this is being
conducted below with the help of different aspects like scope of project, leadership style, project
management methodology, budget and human resource involvement.
Operational Project
Scope of the project
The scope of present project is wide as it include determination and documentation of
specific project goals task deliverable cost and deadlines which will help in executing the work
without delay. In context with Wendy’s they are looking for new stores which requires
customization of menus at different locations which will benefit the organization to assure
maximum success on consumer base. All the deliverables of the detailed outline in this project is
being fulfilled associated with the related activities source timeline and deliverables.
Natural leadership style
In context to the present project it is important to evaluate consumers perception, society
behavioral tend, needs, demands, community practices etc, in order to make customization of
menu. As negligence of this might harm people believe or practices that might cause major loos
for company. In this the natural leadership style that will be undertaken to lead this project is
transformation as with the help of this thinking commitment to active listening, along with
tolerance of intelligent risk and willingness to accept responsibility will embrace to execute the
project. In this leadership style also enable trust in team members and aspire participation in
which each others support will help to fulfill project with trust, loyalty, administration and
respect for the leaders along with willingness to work in more harder way.
1
Successful accomplishment of a project include various elements like project management
methodology, leadership style, estimation of proper budget, allocation of roles and
responsibilities to the human resources involved (Anderson, 2017). The present report include
discussion on Wendy’s case study analysis which is leading fast food chain of America the
company offers wide range of services and products to consumers. The company is finding
optimal location for new stores in which customization of menus at different location according
to the consumers needs demands and preferences is being needed. The discussion of this is being
conducted below with the help of different aspects like scope of project, leadership style, project
management methodology, budget and human resource involvement.
Operational Project
Scope of the project
The scope of present project is wide as it include determination and documentation of
specific project goals task deliverable cost and deadlines which will help in executing the work
without delay. In context with Wendy’s they are looking for new stores which requires
customization of menus at different locations which will benefit the organization to assure
maximum success on consumer base. All the deliverables of the detailed outline in this project is
being fulfilled associated with the related activities source timeline and deliverables.
Natural leadership style
In context to the present project it is important to evaluate consumers perception, society
behavioral tend, needs, demands, community practices etc, in order to make customization of
menu. As negligence of this might harm people believe or practices that might cause major loos
for company. In this the natural leadership style that will be undertaken to lead this project is
transformation as with the help of this thinking commitment to active listening, along with
tolerance of intelligent risk and willingness to accept responsibility will embrace to execute the
project. In this leadership style also enable trust in team members and aspire participation in
which each others support will help to fulfill project with trust, loyalty, administration and
respect for the leaders along with willingness to work in more harder way.
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project management methodology
Figure 1:Critical chain project management (CCPM)
Source: Project Management Methodologies: 12 Best Frameworks [2022] • Asana
Project management methodology is crucial an important aspect to integrate and initiate a
project. In context with of Wendy’s case study analysis use of transformation leadership style
alone with critical chain project management as project management methodology is being
undertaken (Cetin and Kinik, 2015). This framework will help to emphasise on detailed
comprehensive options and will help in breaking down structure associated with specific time
requirement for each task. This will help in making roles and responsibilities clear and further
help to take task tracking one step further. This will also benefit in using resource levelling
which aim to resolve large workload by distributing work across available resources. This is
efficient and productive mythology that will help to connect the work needed to be completed
with project goals and will help team members to execute work according to the created
organised road map (Jo, Lee and Pyo, 2018). This mythology is a great way to report work in
progress to leadership which will help in measuring the task efficiency.
2
Figure 1:Critical chain project management (CCPM)
Source: Project Management Methodologies: 12 Best Frameworks [2022] • Asana
Project management methodology is crucial an important aspect to integrate and initiate a
project. In context with of Wendy’s case study analysis use of transformation leadership style
alone with critical chain project management as project management methodology is being
undertaken (Cetin and Kinik, 2015). This framework will help to emphasise on detailed
comprehensive options and will help in breaking down structure associated with specific time
requirement for each task. This will help in making roles and responsibilities clear and further
help to take task tracking one step further. This will also benefit in using resource levelling
which aim to resolve large workload by distributing work across available resources. This is
efficient and productive mythology that will help to connect the work needed to be completed
with project goals and will help team members to execute work according to the created
organised road map (Jo, Lee and Pyo, 2018). This mythology is a great way to report work in
progress to leadership which will help in measuring the task efficiency.
2
Budget of project
The budget information include the fun requirement which is £50,000 covered to make
modifications and change in the menu. All the expenses include the formal as well as in former
staff include, cost of raw material, research data analysis the overall budget estimated. Along
with this expense also cover the research and development budget is being prepared so that funds
can be accumulated from financial institutions.
Possible human resources involved
To execute this project the individual who actively work one or more phases of the project will
be included in which the project team member role is to manage the overall team. With the help
of regular training to adopt changes the leader will provide effective guidance and support to all
the involved (Ghaffari and Emsley, 2015). Human resources individual from research and
development team, inventory management, account department, marketing unit, human resource
management department and other technical staff is being included to execute the project.
Reflection
To execute or initiate a project it is essential to emphasise on the negative as well as positive
experiences along with the challenges that has been encountered in order to develop strategies
further to overcome the shortcomings. In context to the present projects the major challenges that
has been faced is to manage the activities against the time and determine appropriate project
management methodology out of the various methods. Along with this implementation of
different leadership style according to the situation is also one of the major challenge. However
these has been overcome with the help of proper analysis evaluation of the selected techniques
methods. With the help of taking advantage of appropriate project management mythology such
as a girl and critical change project management model challenges to identify the appropriate
method to execute the project is faced in this with the help of strong critical thinking and data
analysis I overcome this challenge in which appropriate methodology according to the case study
is being selected by me. With the help of taking use of strong critical thinking approach and
3
The budget information include the fun requirement which is £50,000 covered to make
modifications and change in the menu. All the expenses include the formal as well as in former
staff include, cost of raw material, research data analysis the overall budget estimated. Along
with this expense also cover the research and development budget is being prepared so that funds
can be accumulated from financial institutions.
Possible human resources involved
To execute this project the individual who actively work one or more phases of the project will
be included in which the project team member role is to manage the overall team. With the help
of regular training to adopt changes the leader will provide effective guidance and support to all
the involved (Ghaffari and Emsley, 2015). Human resources individual from research and
development team, inventory management, account department, marketing unit, human resource
management department and other technical staff is being included to execute the project.
Reflection
To execute or initiate a project it is essential to emphasise on the negative as well as positive
experiences along with the challenges that has been encountered in order to develop strategies
further to overcome the shortcomings. In context to the present projects the major challenges that
has been faced is to manage the activities against the time and determine appropriate project
management methodology out of the various methods. Along with this implementation of
different leadership style according to the situation is also one of the major challenge. However
these has been overcome with the help of proper analysis evaluation of the selected techniques
methods. With the help of taking advantage of appropriate project management mythology such
as a girl and critical change project management model challenges to identify the appropriate
method to execute the project is faced in this with the help of strong critical thinking and data
analysis I overcome this challenge in which appropriate methodology according to the case study
is being selected by me. With the help of taking use of strong critical thinking approach and
3
decision making ability I have overcome the challenges and further assured accomplishment of
this project in an effective manner, as to make sure that no unnecessary challenges can impact
the efficiency of project adversely.
Discovery Project: Case study on Burger King
Burger King is a well known American-based multinational chain of hamburger and
operating as fast food restaurants. The main headquartered of the Burger King is located in the
Miami-Dade County, Florida and the company was founded in 1953 as Insta-Burger King, a
Jacksonville, Florida–based restaurant chain. After the spread of the Covid-19 many issues and
challenges are being faced by the restaurant industry as sudden lockdown and strict social
distancing norms has made it difficult to have the connection with the customers (Zhang and Lu,
2021). Thus, at that time innovation and creativity is the only option for restaurant industry to
ensure proper working and operations during the times of pandemic. Therefore, the Burger king
has adopted and discovers the better implication and use of the AI that is considered as most
transformative tech evolutions of the current time (The 7 Biggest Technology Trends In 2020
Everyone Must Get Ready For Now. 2021). The making use of the AI supports effective and
more accurate way of managing data as well as determines the trends prevailing in market thus
supports and bingos higher traffic and sales for Burger King through supporting effective
digitalisation and online services for the customers.
The risk of the project using predictive project analytics (PPA)
The use of the PPA allows the project leaders to effectively identify and determine the
appropriate level of the controls which are required to bring and supports the complexity of the
project. It has been estimated that the while undertaking the innovation and leading the use of the
AI the key risk identified by the leaders of the Burger king tend to includes and comprises of
4
this project in an effective manner, as to make sure that no unnecessary challenges can impact
the efficiency of project adversely.
Discovery Project: Case study on Burger King
Burger King is a well known American-based multinational chain of hamburger and
operating as fast food restaurants. The main headquartered of the Burger King is located in the
Miami-Dade County, Florida and the company was founded in 1953 as Insta-Burger King, a
Jacksonville, Florida–based restaurant chain. After the spread of the Covid-19 many issues and
challenges are being faced by the restaurant industry as sudden lockdown and strict social
distancing norms has made it difficult to have the connection with the customers (Zhang and Lu,
2021). Thus, at that time innovation and creativity is the only option for restaurant industry to
ensure proper working and operations during the times of pandemic. Therefore, the Burger king
has adopted and discovers the better implication and use of the AI that is considered as most
transformative tech evolutions of the current time (The 7 Biggest Technology Trends In 2020
Everyone Must Get Ready For Now. 2021). The making use of the AI supports effective and
more accurate way of managing data as well as determines the trends prevailing in market thus
supports and bingos higher traffic and sales for Burger King through supporting effective
digitalisation and online services for the customers.
The risk of the project using predictive project analytics (PPA)
The use of the PPA allows the project leaders to effectively identify and determine the
appropriate level of the controls which are required to bring and supports the complexity of the
project. It has been estimated that the while undertaking the innovation and leading the use of the
AI the key risk identified by the leaders of the Burger king tend to includes and comprises of
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
ensuring proper training of the employees along with having proper budgeting to ensure the
effective atomization and use of suitable software. But based on the PPA analysis, apart from
these risk many benefits such as having higher efficiency and supporting better digitalisation are
some benefits of AI which supports higher sales and improved productivity (Collins and Moons,
2019).
This project should be undertaken given the PPA relating to its impact
Based on the PPA analytics it has been seen that certain risk related with use of appropriate
software and algorithms along with having skilled employees and higher budget but still the
undertaking of PPA ultimately have a positive impact on the sales and productivity level of the
Burger king. It has been seen that use of AI by the burger king would support of the better
forecasting along with effective management of sales and automation to support better
digitalisation that bring higher sales for Burger King.
Optimal leadership style for the project
The most appropriate and optimal leadership style for Burger King for implicating AI
comprises of the use of the democratic leadership style as it supports proper involvement and
participation of all employees which ensure higher creativity (Goralski and Tan, 2020). Further,
the use of democratic leadership also ensures effective communication and proper guidance and
motivation for employees for better implication of the AI.
Project management methodology and integrate it with the leadership style
The implication and making use of the Agile method of the project management is
seemed most suitable and appropriate for the current project as it supports the breaking of the
project in manageable task and several phases thus supports its better implication. The use of
democratic leadership supports higher coordination and communication to effectively break
down the project into small manageable phase based on the involvement and effective
participation of all employees to effectively link with agile project management (Berezina, Ciftci
and Cobanoglu, 2019).
The budget of project and why such an estimation may be difficult given the nature of innovation
While implicating a project, making estimation of the budget is always difficult as business
organisation is operating in a dynamic environment thus, making estimation of budget for an
innovation is always difficult. Thus, the Burger king has set out a limit for its innovation and
5
effective atomization and use of suitable software. But based on the PPA analysis, apart from
these risk many benefits such as having higher efficiency and supporting better digitalisation are
some benefits of AI which supports higher sales and improved productivity (Collins and Moons,
2019).
This project should be undertaken given the PPA relating to its impact
Based on the PPA analytics it has been seen that certain risk related with use of appropriate
software and algorithms along with having skilled employees and higher budget but still the
undertaking of PPA ultimately have a positive impact on the sales and productivity level of the
Burger king. It has been seen that use of AI by the burger king would support of the better
forecasting along with effective management of sales and automation to support better
digitalisation that bring higher sales for Burger King.
Optimal leadership style for the project
The most appropriate and optimal leadership style for Burger King for implicating AI
comprises of the use of the democratic leadership style as it supports proper involvement and
participation of all employees which ensure higher creativity (Goralski and Tan, 2020). Further,
the use of democratic leadership also ensures effective communication and proper guidance and
motivation for employees for better implication of the AI.
Project management methodology and integrate it with the leadership style
The implication and making use of the Agile method of the project management is
seemed most suitable and appropriate for the current project as it supports the breaking of the
project in manageable task and several phases thus supports its better implication. The use of
democratic leadership supports higher coordination and communication to effectively break
down the project into small manageable phase based on the involvement and effective
participation of all employees to effectively link with agile project management (Berezina, Ciftci
and Cobanoglu, 2019).
The budget of project and why such an estimation may be difficult given the nature of innovation
While implicating a project, making estimation of the budget is always difficult as business
organisation is operating in a dynamic environment thus, making estimation of budget for an
innovation is always difficult. Thus, the Burger king has set out a limit for its innovation and
5
implicating AI that contains both higher and lower limit based on nature of innovation (Seo and
Lee, 2021).
Team undertaking the project
To implement and have application of the AI in Burger king, a highly effcinet and effective
team is needed comprises of diverse people and technical candidate (Zhang and Lu, 2021). The
expected team for undertaking current project would include and comprises of the:
Project manager who needs to be a technical expert
Software engineer
Expert of algorithms
Leaders to train and aware employees
Technical and skilled workforce
Democratise the project across the business
To have the effective democratise of the project that comprises of effective planning to
make participation through the business. Thus, use of effective decision making process based on
heightened collaboration among all team members would be made. Along with this, the use of
the democratic leadership style is also effective and vital in democratising the project across the
6
Lee, 2021).
Team undertaking the project
To implement and have application of the AI in Burger king, a highly effcinet and effective
team is needed comprises of diverse people and technical candidate (Zhang and Lu, 2021). The
expected team for undertaking current project would include and comprises of the:
Project manager who needs to be a technical expert
Software engineer
Expert of algorithms
Leaders to train and aware employees
Technical and skilled workforce
Democratise the project across the business
To have the effective democratise of the project that comprises of effective planning to
make participation through the business. Thus, use of effective decision making process based on
heightened collaboration among all team members would be made. Along with this, the use of
the democratic leadership style is also effective and vital in democratising the project across the
6
business by the way of leading and encouraging effective participation and communication about
AI across the Burger king (Collins and Moons, 2019).
CONCLUSION
On the basis of the above project, a conclusion can be made that the innovation is vital and
essential for all business organisation that can be effective and successful with the help of
effective project management and leadership. A comparison of the both project can be made as it
first project the main focus of business is on the location and setting an effective menu while
under the second project the business is focusing on bringing a latest trend and allocation of AI
to support better digitalisation and automation that is reflecting the key characteristics. Further,
within the first project use of the CCPM project methodologies has been made while in the
second project implication of agile project management has been both of which are appropriate
and suitable based on nature of the project. Further, a summarisation can also be made that for
the success and effective execution of the both project needs of a skilled and talented Human
resource requirement was there. Beside this, it has been seen that working of the both project is
being different thus use of different leadership and management style is being made. Within the
first project the use of the transformational leadership has been made to effectively inspire the
workforce towards the attainment of goal. While in the second project, use of democratic
leadership style has been made that supported proper participation and enhanced creativity for
better adoption of AI.
7
AI across the Burger king (Collins and Moons, 2019).
CONCLUSION
On the basis of the above project, a conclusion can be made that the innovation is vital and
essential for all business organisation that can be effective and successful with the help of
effective project management and leadership. A comparison of the both project can be made as it
first project the main focus of business is on the location and setting an effective menu while
under the second project the business is focusing on bringing a latest trend and allocation of AI
to support better digitalisation and automation that is reflecting the key characteristics. Further,
within the first project use of the CCPM project methodologies has been made while in the
second project implication of agile project management has been both of which are appropriate
and suitable based on nature of the project. Further, a summarisation can also be made that for
the success and effective execution of the both project needs of a skilled and talented Human
resource requirement was there. Beside this, it has been seen that working of the both project is
being different thus use of different leadership and management style is being made. Within the
first project the use of the transformational leadership has been made to effectively inspire the
workforce towards the attainment of goal. While in the second project, use of democratic
leadership style has been made that supported proper participation and enhanced creativity for
better adoption of AI.
7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES
Books and journal
Anderson, M., 2017. Transformational leadership in education: A review of existing
literature. International Social Science Review, 93(1), pp.1-13.
Berezina, K., Ciftci, O. and Cobanoglu, C., 2019. Robots, artificial intelligence, and service
automation in restaurants. In Robots, artificial intelligence, and service automation in
travel, tourism and hospitality. Emerald Publishing Limited.
Cetin, M.O. and Kinik, F.S.F., 2015. An analysis of academic leadership behavior from the
perspective of transformational leadership. Procedia-Social and Behavioral
Sciences, 207, pp.519-527.
Collins, G.S. and Moons, K.G., 2019. Reporting of artificial intelligence prediction models. The
Lancet, 393(10181), pp.1577-1579.
Ghaffari, M. and Emsley, M.W., 2015. Current status and future potential of the research on
Critical Chain Project Management. Surveys in Operations Research and Management
Science, 20(2), pp.43-54.
Goralski, M.A. and Tan, T.K., 2020. Artificial intelligence and sustainable development. The
International Journal of Management Education, 18(1), p.100330.
Jo, S.H., Lee, E.B. and Pyo, K.Y., 2018. Integrating a procurement management process into
critical chain project management (CCPM): A case-study on oil and gas projects, the
piping process. Sustainability, 10(6), p.1817.
Seo, K.H. and Lee, J.H., 2021. The emergence of service robots at restaurants: Integrating trust,
perceived risk, and satisfaction. Sustainability, 13(8), p.4431.
Zhang, C. and Lu, Y., 2021. Study on artificial intelligence: The state of the art and future
prospects. Journal of Industrial Information Integration, 23, p.100224.
Online:
The 7 Biggest Technology Trends In 2020 Everyone Must Get Ready For Now. 2021. [Online]
Available Through:< https://www.forbes.com/sites/bernardmarr/2019/09/30/the-7-
biggest-technology-trends-in-2020-everyone-must-get-ready-for-now/?sh=5ad8d1a12261
>.
8
Books and journal
Anderson, M., 2017. Transformational leadership in education: A review of existing
literature. International Social Science Review, 93(1), pp.1-13.
Berezina, K., Ciftci, O. and Cobanoglu, C., 2019. Robots, artificial intelligence, and service
automation in restaurants. In Robots, artificial intelligence, and service automation in
travel, tourism and hospitality. Emerald Publishing Limited.
Cetin, M.O. and Kinik, F.S.F., 2015. An analysis of academic leadership behavior from the
perspective of transformational leadership. Procedia-Social and Behavioral
Sciences, 207, pp.519-527.
Collins, G.S. and Moons, K.G., 2019. Reporting of artificial intelligence prediction models. The
Lancet, 393(10181), pp.1577-1579.
Ghaffari, M. and Emsley, M.W., 2015. Current status and future potential of the research on
Critical Chain Project Management. Surveys in Operations Research and Management
Science, 20(2), pp.43-54.
Goralski, M.A. and Tan, T.K., 2020. Artificial intelligence and sustainable development. The
International Journal of Management Education, 18(1), p.100330.
Jo, S.H., Lee, E.B. and Pyo, K.Y., 2018. Integrating a procurement management process into
critical chain project management (CCPM): A case-study on oil and gas projects, the
piping process. Sustainability, 10(6), p.1817.
Seo, K.H. and Lee, J.H., 2021. The emergence of service robots at restaurants: Integrating trust,
perceived risk, and satisfaction. Sustainability, 13(8), p.4431.
Zhang, C. and Lu, Y., 2021. Study on artificial intelligence: The state of the art and future
prospects. Journal of Industrial Information Integration, 23, p.100224.
Online:
The 7 Biggest Technology Trends In 2020 Everyone Must Get Ready For Now. 2021. [Online]
Available Through:< https://www.forbes.com/sites/bernardmarr/2019/09/30/the-7-
biggest-technology-trends-in-2020-everyone-must-get-ready-for-now/?sh=5ad8d1a12261
>.
8
1 out of 11
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.