logo

Leading Lean Projects: Identifying Issues and Root Causes

   

Added on  2023-06-04

9 Pages1685 Words54 Views
Running head: LEADING LEAN PROJECTS
LEADING LEAN PROJECTS
Name of the Student
Name of the University
Author note

2LEADING LEAN PROJECTS
Table of Contents
Introduction:........................................................................................................................3
Discussion:...........................................................................................................................4
Root cause of the problem:..............................................................................................4
Pricing issue:....................................................................................................................4
Why people leaving?.......................................................................................................5
How can it affect the organization?.................................................................................5
Stress problem.................................................................................................................7
Recommendation:............................................................................................................7
Conclusion:..........................................................................................................................8
References:..........................................................................................................................9

3LEADING LEAN PROJECTS
Introduction:
The aim of this assignment is to identify the issues and the root cause of the issue, why
the employees are leaving and why there is no growth in the organization (Scott, 2015).
Precision engineering works are an equipment manufacturing business that specialises in making
plastic moulding equipments and parts for telecommunication industry (Ahn et al. 2012). They
are in the industry for nearly 30 years and they have built a strong market which includes some
of the successful telecommunication company of the country. The assignment will also discuss
the environmental factors that are affecting the business organization. Analysis of the
management will also be carried out that will give an idea about the management issues and how
it can be solved so that the organization can grow in the market.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Lean Projects Management for Australian Engineering Works Private Limited
|22
|4624
|403

Continuous Improvement Plan for Precision Engineering Works
|26
|4231
|348

Leading Project Management
|22
|4320
|461

Continuous Improvement Plan of PEW
|19
|3642
|105

Continuous Improvement: Root Cause Analysis for Precision Engineering Works Private Limited
|19
|3477
|358

Continuous Improvement Plan for PEW Organization
|19
|3090
|450