Implementing Lean Project Management for Successful Event Organization: A Study on FIFA World Cup
Verified
Added on  2023/06/05
|17
|3614
|205
AI Summary
This study focuses on implementing lean project management for successful event organization of FIFA World Cup. It includes voice of customers, critical to customer and quality requirements, areas for implementing project management methodologies like PMBOK, PRINCE 2, OPM, AGILE, and LEAN SIX SIGMA principles.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents Project Overview........................................................................................................................2 Voice of Customers....................................................................................................................2 Critical to customer requirement................................................................................................2 Critical to quality requirement...................................................................................................4 Implementation of the lean project management.......................................................................6 Areas for implementing project management methodologies...................................................7 PMBOK..................................................................................................................................7 PRINCE 2...............................................................................................................................7 OPM.......................................................................................................................................8 AGILE....................................................................................................................................9 LEAN SIX SIGMA Principles...............................................................................................9 Conclusion:..............................................................................................................................10 References................................................................................................................................10
Project Overview The project is going to be designed for analysing the customer requirement associated with the deployment and organization of the program for FIFA world cup at an international level. The coordination and quality efforts are required for analysing the requirement of the customer so that the project can be successfully implemented by satisfying the needs of the internal and external stakeholders. Voice of Customers The event organization and processes undertaken for implementation can be effectively improved by giving emphasis on retrieving the information regarding the requirement of the internal and external customers. The evaluation of the customer expectation helps in setting the quality standards for the completion of the project successfully (Singh, and Lano, 2015). It helps in managing the requirement resources, material, and synchronisation of the process event. The systematic organization of the data collection procedures helps in highlighting the expectations and demand with the FIFA world cup event. The level of satisfaction of the stakeholders can be improved by implementing the data collection strategies for evaluating the need and desire, setting priorities to the risks and conflicts associated with the organization of the event, ensuring the innovation in the program, developing documentation, report, and quality checklist for the projects, and others. The capabilities of the internal stakeholders to give effective results and improved performance can be enhanced by recognising the requirement of them from the undertaken process and procedures (Pawar, and Mahajan, 2017). The satisfaction of the external customers can be achieved by meeting the quality standards designed for the project. Critical to customer requirement The implementation of the successful event requires the evaluation of the internal and external customers need and satisfaction to get effective results. The critical evaluation of the internal and external stakeholders in summarised below in the table: CategoriesTypesDescription Internal StakeholdersEvent DirectorProposal of FIFA world cup
Estimation of time Estimation of cost Project HeadDevelopment of Organization Hierarchy Organization of project requirement Health relationship with project sponsors and trustees Procurement managerDevelopment of the resource list (Morais, and Sousa, 2015) Development of the purchasing item list Effective deployment of communication Sending documentation to the project manager Project PlannerPlanning and scheduling of the event activities Knowledge of project duration Knowledge of estimated cost Knowledge of gaps in the previous event management Project ManagerReceiving project schedule
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
from the planner Reviewing of the project schedule Approval of the project schedule Communication with the board of directors and project head Project analystManaging information regarding failure and success factors of the previous events Managing information regarding risks and issues associated with the project Event CoordinatorKnowledge of customer requirement Knowledge of project plan and working activities Development of communication strategy to manage the flow of information Board of DirectorsReviewing the project activities Required innovation in the organization of the event (Niranjan, 2014)
EmployeesProcess and procedures Grievance handling program Availability of resources Communication tools and strategy Company rules and legislation External StakeholdersLocal GovernmentProfit earned by the event organization Financial funding for the project SponsorsApproval of the project schedule Approval of financial funds TrusteesApproval of the financial funds CustomersQuality of service Customer service support Seating and food requirement ConsultantRequired innovation for the project Development of innovative strategies for the project plan (Moujib and Aziz, 2017) DelegatesQuality of Service International PlayersQuality of service Living standards
Food quality Uniform Practice equipment Media PartnersTRP Program promotion Critical to quality requirement The checklist should be prepared by analysing the internal and external customer requirement for setting the quality standard to retrieve the quality of service to the end users. The quality standards help in measuring the success and failure of the project (Saeed, and at.el., 2013). The setting of the quality control helps in meeting the project requirement raised by the stakeholders. The following table shows the quality standards and control to get quality of service from the proposed project. RequirementQuality StandardsQuality Control Time EstimationSetting of time duration for the activities. The start and finish date should be set Setting of critical path of the project schedule Cost EstimationSetting of cost by analysing market price Analysis of market price variation report ServiceSetting standards for the services and facilities Setting cost and time for the services retrieved by the customers Scope Management planDevelop standards for initializing in-scope activities and out-of-scope activities Division of requirement in setting in-scope and out-of- scope activities Procurement management plan Development of requirement plan for the quality of the resources Availability of resources should be according to the requirement plan of the customers Statement of workDivision of role and responsibilities to specify the job description of the Approval of the work statement from the stakeholders
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
stakeholders Project ScheduleDivision of project phases and sub-activities of the schedule Time and cost of the project schedule should be according to the project requirement Division of role and responsibilities Initialization of role and responsibilities Authorities should be provided for the required task to be done Resource management planDevelopment of resources requirement plan Management plan for the resource availability to meet supply and demand of resources Development of risk management plan Setting analysis of risks identification and mitigation plan Risk analysis and allocation to resolve them effectively Development of quality control Setting of quality planSetting of control and authorities Managing quality of equipment Setting quality standards for the resources used in the development of the FIFA world cup event Management plan for the resource availability to meet supply and demand of resources Managing quality of sound system Setting standard for the sound system Noise pollution can be effectively controlled Safe Drinking waterSetting TDS for the quality of the water safe for drinking Availability of safe drinking water FoodSetting quality standard for the food consumed at the day of event Quality of vegetable and spices to get desired food UniformPattern design of the country logo should be followed on uniform Logo should be according to the country Seats estimationNumber of seats is equal to number of customers Number of customers should not be more than the availability of seats Customer Service support24 * 7 hours customerRequest and response can be
service support should be provided effectively managed Facilities of temperature control Setting standard temperature of the AC, Fan, and cooler Temperature control methods Facilities of refreshmentAvailability of refreshment on demand of the customers Quality of Refreshment Implementation of the lean project management The roadmap should be developed for the implementation of the lean project management. The focus should be given on managing the vision of the project, defining the processes for the project management, collecting required information and data, managing the visualization of organization hierarchy, identifying the process schedule, managing the cause effect of the quality measurement, selecting the feasibility solution, improving the design plan according to the requirement of the internal and external customers, summarising result of the feedback, and updating the control structure, and others. The methodologies used for measuring the performance of the project. The implementation of the lean project management is focused below: ï‚·Evaluation of the vision, value, and process required for implementing the FIFA world cup ï‚·Setting standards and synchronised the flow of project activities by mapping the requirement and expectation of the customers according to the project need (Rauber, 2014) ï‚·The capabilities of man power should be estimated according to the requirement of the project plan ï‚·Output of the process used for arranging the international should be forecasted ï‚·Indulge changes in the organization structure to get required result and completing the project successfully ï‚·Deployment of monitoring and control procedures for gaining continuous improvement in the operational plan of the event The process of lean project management methodology is composed of five process which are classified in the table below:
ProcessDescription Project DefinitionDevelopment of the project vision and mission of the project Developing processes for achieving the event success Project MeasuresThe data collected from different sources helps in measuring the requirement of the project. The planning of the project activities helps in estimating the scheduled date according to the time required for completing the project (Ownes, 2010). Project AnalysisThe documentation should be prepared for evaluating the quality standard sets for the successful completion of the FIFA world cup event Project improvementThe feasibility of the undertaken process should be tested for developing the continuous improvement plan for the project Project ControlThe performance of the stakeholders should be measured Communication strategy and tools should be implemented for controlling the operational plan of the event Areas for implementing project management methodologies PMBOK The project management body of knowledge is deployed for completing the project successfully. It divides the project into five phases which helps in developing the effective project schedule. It helps in analysing the requirement of the internal and external
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
stakeholders to accomplish the given task comfortably. The processes of PMBOK are followed for managing the successful synchronisation of event: ï‚·Initialization of the project: The organization of the interviews and questionnaire helps in revealing the project requirement in the systematic manner. The planning of the event is based on the requirement specification plan developed by arranging meetings with the board of directors. ï‚·Planning process: The development of statement of work and scope management plan helps in completing the event successfully. The authorities and controls should be provided to the employees according to the assigned tasks. The planning of the project activities helps in estimating the scheduled date according to the time required for completing the project. ï‚·Execution process: The project plan helps in defining the procedures laid down for executing the sequence of event within the given time frame. The training and development program should be arranged for the participants so that they can sharpen their skills accordingly and provides the 100% output of the project plan (Otieno, 2014). ï‚·Project monitoring process: The procedures and process should be designed which emphasis on analysing the performance of the project. It helps in developing the improvement procedures to meet the required quality standard of the project. ï‚·Closing process: The parameters of quality should be met after the completion of the project to satisfy the requirement of the customers completely. Elaboration: The efficiency of the project deliverables depends upon the process applied to different knowledge areas which are categorised as development of the scope, time, cost, statement of work, procurement, resources, and communication. PRINCE 2 The PRINCE 2 methodology is used to follow the pre-requirement of the project according to the need and desire of the internal and external customers. The processes and methodologies of the PRINCE 2 are:
ï‚·Start-up process: The start-up of the project depends upon the requirement raised by the internal and external customers in the development of FIFA world cup event. ï‚·Initialization process: The process of initialization is used to measure risks associated with the project proactively. The communication strategy should be followed for achieving the quality of the event. ï‚·Direction: the development of the project plan helps in providing direction to the project activities for synchronising the project plan accordingly. ï‚·Controlling: The development of project framework and work breakdown structure helps in analysing the gaps and flaws in the project process. ï‚·Project Boundaries: The project should be completed within the allocated time, cost, and authorities. ï‚·Delivery: The project should be delivered on time and within the cost. The level of satisfaction of the customers should be evaluated for measuring the success and failure of the project. ï‚·Closing: The successful project can be completed by managing the complexities and grievances of the employees proactively. Elaboration: The prince 2 helps in synchronising the project activities to give effective direction to the project plan. The development of project framework and work breakdown structure helps in analysing the gaps and flaws in the project process. It helps in resolving the complexities and risks associated with the project at an early stage. OPM The organization project management procedures should be laid down for completing the project successfully within the given period of time (Mansfield community, 2013). The processes which are defined in the OPM methodology are: ï‚·Governance: The project should be governed by the requirement and need posted by the internal and external stakeholders. ï‚·Transparency: The process and procedures should be clearly defined for managing the flow between the member participants. ï‚·Reusability: The procedures and process laid down by the project should be reused according to the requirement of the project (McDonald, and at.el., 2013).
ï‚·Delivery: The project should be delivered on time and cost for successful completion of the project ï‚·Traceability: The gaps and flaws of the project working structure should be traced in developing the working schedule of the project (Obrutsky, 2016). Elaboration: The Organization structure and hierarchy can be effectively developed by deploying the OPM methodology which helps in managing the effective communication between the internal and external participants. AGILE The AGILE project methodology is deployed for managing the requirement according to the changes in the market trends and technologies. The iteration process should be followed to know actual requirement of the project. ï‚·Planning: The planning of the project depends on the customer participation in the event organization plan. The quality of service can be achieved by managing the iteration regularly with the clients and customers (Hoven, Michae, Varnes, and Goffin, 2013). ï‚·Communication: The communication strategy and tools should be deployed for managing the flow of information between the member participants. ï‚·Testing: The completed task should be tested regularly for improvement so that the customer requirement can be effectively satisfied. ï‚·Delivery: The implementation of the event on the scheduled date successfully ï‚·Change: The change management plan should be deployed improving the project process systematically. Elaboration: The process of agile methodology is used for managing the customer requirement by deploying the iteration procedures simultaneously after fixed interval of time so that the required changes and demand can be given preference (Griffin and Hauser, 2013). The periodic changes in the project plan helps in completing the project successfully within the given specified time and cost. The organization of the project activities by consulting with the stakeholders helps in bringing efficiency in the project schedule.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
LEAN SIX SIGMA Principles The lean six sigma project methodology is deployed for completing the project with 99.99% of accuracy (Monnappa, 2017). It focuses on the evaluation of the vision, value, and process required for implementing the FIFA world cup. The processes which are designed for the implementation of the lean six sigma methodology are as follows: ï‚·Define: The clear vision, objectives, goal, and process should be defined to the members of the project plan (Faust, 2014). The clarity in the goal helps in developing the effective schedule which satisfies the demand of the requirement specification plan. ï‚·Measure: The success and failure of the project depends upon the methodologies used for collecting the data and information from qualitative and quantitative methods. The data collected from different sources helps in measuring the requirement of the project ï‚·Analyse: The data collected from different sources should be analysed for evaluating the success and failure criteria of the project. The documentation should be prepared for evaluating the quality standard sets for the successful completion of the FIFA world cup event ï‚·Improve: The periodic arrangement of meetings with the stakeholders helps in analysing the future requirement and demand for bringing required changes in the project plan. It helps in developing the continuous improvement plan of the project (McClinton, 2014). ï‚·Control: The control procedures should be laid down to meet the quality standards of the project. Elaboration: The Lean six sigma project methodologies helps in completing the project efficiently by meeting all the requirements of the project. The success criteria of the project can be meet by deploying the improvement plan for the project activities. The clear organization of the project goal results in the successful completion of the event on the scheduled date. Conclusion: The parameters and success criteria of the project methodologies helps in measuring the success and failure of the project. The lean six sigma principles are the most acceptable project methodology because it helps in completing the project successfully and with
accuracy of 100% approx. The communication strategy should be followed for achieving the quality of the event. The development of project framework and work breakdown structure helps in analysing the gaps and flaws in the project process. The organization of the project activities by consulting with the stakeholders helps in bringing efficiency in the project schedule. References Faust, J. (2014).Increase efficiency using Six sigma methodologies.1stebook.Retrieved from https://pdfs.semanticscholar.org/dfac/bfb4468db33b68ecf3710cd3e2c64e6926ae.pdf Griffin, A., and Hauser, J. (2013).The Voice of the customers.Retrieved from http://product.design.umn.edu/courses/pdes2701/documents/5701papers/ 05evaluation/griffin93.pdf Hoven, C., Michae, A., Varnes, C., and Goffin, K. (2013).Giving the customer voice: A Study of market research method.International conference on product development management.Retrieved from http://openarchive.cbs.dk/bitstream/handle/10398/8747/Adela_Michea.pdf? sequence=1 Mansfield Community. (2013).Introduction to project management. 1sted. Ebook.Retrieved from http://www.mansfield.vic.gov.au/Libraries/Community_Development/Intro_to_Projec t_Management_Manual.sflb.ashx McClinton, P. (2014).A project management methodologies: A review of the Literature.1st ebook.Retrieved from http://www.academia.edu/7055300/Project_Management_Methodologies_A_Review _of_the_Literature McDonald, K., Sundaram, V., Bravata, D., Lewis, R., and Lin, N. (2013). Closing the quality gap: A critical analysis of quality improvement strategies.Journal of object technology, 7(9).Retrieved fromhttps://www.ncbi.nlm.nih.gov/books/NBK44015/
Monnappa. (2017).Project scope management: What it is and why it is important. 1st ed. [ebook].Retrieved from https://www.simplilearn.com/project-scope-management- importance-rar89-article Morais, V., and Sousa, S. (2015).Implementation of a lean six sigma project in a production line.1stebook.Retrieved from http://www.iaeng.org/publication/WCE2015/WCE2015_pp847-852.pdf Moujib and Aziz. (2017).Lean Project management.1stebook.Retrieved from https://www.pmi.org/learning/library/lean-project-management-7364 Niranjan, M. (2014).Approaching and managing delivery of a project using project management methodologies.1stebook.Retrieved from http://ipublishing.co.in/ajmrvol1no1/volfive/EIJMRS5222.pdf Obrutsky, S. (2016).Comparison and contrast of project management methodologies PMBOK and Scrum.1stebook.Retrieved from https://www.researchgate.net/publication/305969672_Comparison_and_contrast_of_p roject_management_methodologies_PMBOK_and_SCRUM Otieno, F. (2014).The role of monitoring and evaluation in projects. 1st ed. [ebook]. Retrieved from https://www.irbnet.de/daten/iconda/CIB8942.pdf Owens, J. (2010).Risk management.Retrieved from http://agile.csc.ncsu.edu/SEMaterials/RiskManagement.pdf Pawar, R., and Mahajan, K. (2017).Benefits and issues in managing project by PRINCE 2 methodology. International journal of advanced research in computer science and software engineering, 7(3).Retrieved from http://ijarcsse.com/Before_August_2017/docs/papers/Volume_7/3_March2017/V7I3- 0134.pdf Rauber, J. (2014).A Critical analysis of quality management.1stebook.Retrieved from http://www.ijmp.jor.br/index.php/ijmp/article/view/121/379 Saeed, R., Lodhi, R., Munir, J., Riaz, S., Dustgeer, F., and Sami, A. (2013).The Impact of voice of customers on new product development. International journal of world
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Science, 24(9), pp. 1255-1260.Retrieved from https://pdfs.semanticscholar.org/a7bc/9f0c4ea9c7bda5b648e25550938c58ccfb09.pdf Singh, R., and Lano, K. (2015).Literature survey of previous research work in models and methodologies of Project management. International journal of advanced research in computer science and application, 5(9).Retrieved from http://ijarcsse.com/Before_August_2017/docs/papers/Volume_7/3_March2017/V7I3- 0134.pdf