Level Crossing Removal Project - Report

Added on -2020-03-04

This report has been presented on the Level Crossing Removal Project. The level crossing is an interaction between the railway lines and cross cultural. Also, we cover the traffic level that occurred as the railway networks of Melbourne included several railway lines crossing through the same levels because of the flat topography of the city.

| CVE30003
| 10 pages
| 2374 words
| 213 views

Trusted by 2+ million users,
1000+ happy students everyday

Showing pages 1 to 3 of 10 pages

Level Crossing Removal ProjectLevel crossing removal project1
Level Crossing Removal ProjectExecutive summaryThis report has been presented over the level crossing removal project. In this report, many aspects related to level crossing have been studied to reach over a conclusion. Level crossing is an interaction among the railway lines and cross path. In this report, firstly introduction has been given about the report, further, definition of level crossing has been depicted, conceptual design and conceptual design of level crossing has been given and at the end, conclusion has been given. 2
Level Crossing Removal ProjectContentsIntroduction.................................................................................................................................................4Definition:....................................................................................................................................................4Conceptual Design:......................................................................................................................................4Conceptual design of level crossing removal project..................................................................................5Conclusion...................................................................................................................................................7References:..............................................................................................................................................93

In brief, it could be concluded that easing and reducing the heavy road traffic during peak hours provides better train facilities to the public with faster and safer services, and revitalizes the community parks, their transport lines, and the connection between the local community development with the newly designed stations.

Found this document preview useful?

You are reading a preview
Upload your documents to download
or
Become a Desklib member to get accesss

Students who viewed this