Running head: Maintenance Planning And Scheduling. Student name Student ID Case study titles #1: Maintenance planning and scheduling #1: Maintenance engineering giants jumbo jet strip down-Ep 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Maintenance Planning and Scheduling2 Case study no. #1:https://www.youtube.com/watch?v=hT_UHv2Jyvk Contents Maintenance planning and scheduling.........................................................................................................2 INTRODUCTION...........................................................................................................................................2 Reflection and discussion............................................................................................................................3 Conclusion...................................................................................................................................................5 References...................................................................................................................................................5 Maintenance engineering giants jumbo jet strip down-Ep 1........................................................................7 Introduction.................................................................................................................................................7 Reflection and discussion............................................................................................................................7 Conclusion...................................................................................................................................................8 References...................................................................................................................................................9 Maintenance planning and scheduling INTRODUCTION In every business entity, there are assets used in the production process. Different organizations have their way of maintaining their equipment. The maintenance is achieved by planning and scheduling of the policy to apply during equipment maintenance(Hurt & Schrock, 2016). Every asses or material used in production must undergo depreciation. The support will help improve the machine depreciation. A case study was developed from the lessons taught by
Maintenance Planning and Scheduling3 Roy Roth well, who is a specialist in maintenance planning and scheduling. The discussion has covered several critical aspects of maintenance, plan, and schedule. It is a lesson taught by Roy, and it is very educational as the content profoundly expounds on the maintenance planning and scheduling strategy. Roy Roth well has been in the maintenance software field for over twenty- five years; therefore, he has a total experience in maintenance management. Reflection and discussion 1.The computerized maintenance management system. I have clear leaned from the casethat CMMS journey or process requires the maintenance team to deploy the asset reliability strategies. The system building blocks will ensure the ISO component is factored. The maintenance team will monitor the continuous improvement of the system(López- Santana, Akhavan-Tabatabaei, Dieulle, Labadie, & Medaglia, 2016). Maintenance helps in the development of assets, PMs, contacts, parts, and work orders schedule up to the systems actualization completion. 2.Planning and scheduling. According to Roy, in the case study, he states that planning and programming take place in the following context. I should ensure, planning and scheduling must be involved in the defect elimination to ensure operator driven reliability: uptime elements and work execution management compliance, maintenance (Memarzadeh & Pozzi, 2016). Inter craft coordination is done to ensure CMMS on backlogs will be impartial to return on investment. 3.The leverage planning provides the service of generating labor hours and without delay. The system is now up to direct work after every part is ready for production. Some delays mighty are experienced under waiting times(Froger, Gendreau, Mendoza, Pinson,
Maintenance Planning and Scheduling4 & Rousseau, 2016). The systems are necessarily stressed to concentrate on the wrench time, which is the most exciting part of the production time. 4.The work management entails identifying the work to be done and requirements. After work identification, I should acquire work planning metrics. The work is, therefore, scheduled. Afterward can plan and work on block management(Beheshti Fakher, Nourelfath, & Gendreau, 2017). Resources are also management such as people and materials and, finally, general scheduling. 5.Planning principles and Scheduling principles Separate department The manager should plan emergency work, act as a relief supervisor, and become a material expeditor. He should expect from behind the desk only working on tools and ensure to perform time-consuming clerical activities. Focus on future work and improve constantly Manage component level Should plan with the estimate based on planner experience Have plans that recognize the skills of the craft Measure performance with work sampling Scheduling principles Plan for the lowest required skills Value schedules and job priorities Avail schedule from the forecast of high skills Timeline for every work time available
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Maintenance Planning and Scheduling5 The crew leader should handle the current daily work Use schedule performance to measure compliance Conclusion The case study prepared by Roy Roth well has discussed the maintenance planning and scheduling and all its components that can help achieve the desired quality output. The case has delicate information and well explained and easily understandable to any reader. However, the quality of the manager will depend on the determination and objectives put into consideration. References Beheshti Fakher, H., Nourelfath, M., & Gendreau, M. (2017). A cost-minimization model for joint production and maintenance planning under quality constraints.International Journal of Production Research, 55(8), 2163-2176. Frogger, A., Gendreau, M., Mendoza, J. E., Pinson, E., & Rousseau, L.-M. (2016).A branch- and-check approach to solve wind turbine maintenance, scheduling problems. Hurt, M. A., & Schrock, S. D. (2016).Highway bridge maintenance planning and scheduling: Butterworth-Heinemann. López-Santana, E., Akhavan-Tabatabaei, R., Dieulle, L., Labadie, N., & Medaglia, A. L. (2016). On the combined maintenance and routing optimization problem.Reliability Engineering & System Safety, 145, 199-214.
Maintenance Planning and Scheduling6 Case study no. #2https://www.youtube.com/watch?v=lzUsmHDahvM
Maintenance Planning and Scheduling7 Maintenance engineering giants jumbo jet strip down-Ep 1 Introduction The jumbo jet strip-down case study is developed under the American giant engineering environment. The case study is prepared under the interrogation of a great engineer in operation. The case study is revolving under maintenance planning and scheduling, which is clearly explained and illustration in the case study video(Platt, 2019). The engineers are supervised by a general engineer who holds to ensuring the system is well maintained for smooth operations. Reflection and discussion From the study course, maintenance planning and scheduling is not a cake to take work. However, it entails a detailed procedure with independent components(Thompson, 2018). The jumbo jet is an aircraft with more than twelve thousand systemic parts. The sub-systems contribute to the successful operation of the entire system. 1.Maintenance planning of jumbo jet.The plan, according to the case study, is based on the functionality of the system. In this case, I should first evaluate the condition of the methods by exploring the many parts of the jumbo jet. 2.Rendering that jumbo jet is one of the biggest passenger accommodating vessel. It can hold up to five hundred passengers. After exploration, the parts are tested for defects and depreciation. Highly trained and experienced engineers perform the activity. I, therefore, ensure all parts are intact and in good condition. The systems can be categorized depending on the operation; however, each is essential and interdependent. The plane has a safety system that has also to be tested for
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Maintenance Planning and Scheduling8 maintenance(Rigney, 2017).The engine is lowered and separated from the entire jet for testing and repair. 3.The jet has a landing gear, which is also a system, and when messed up, it can be disastrous. There are also critical safety components that help in the case of crushing of the plane. The most exciting thing is that engineers love their work and want to exploit more knowledge of maintenance technology. 4.Maintenance scheduling. As the manager now has a protocol for scheduling maintenance activities. The activities are maintained depending on the order of priority. Typically, by using the sequence of operation and first deal with sub-systems and evaluate every part of the jet up to the entire plane. Like any other maintenance, the jumbo plane is a system of many sub-systems. It is complex and requires highly- trained specialists. 5.After maintenance and repairs, the whole system jumbo jet is now tested. The testing requires making a few miles flight for testing if all the plane parts functionality before it is risked with hundreds of people(Weber et al., 2018). The risks are accessed and dealt with during the maintenance period. Conclusion Maintenance Engineering is one of the most complex management. However, giant jumbo jet engineers view it as an easy task to undertake. Surprisingly, they carry out operations with minimal time and with utmost accuracy and minimum time. They use a priority list to ensure all departments are attended. A checklist is used by the general engineer to confirm the work for safety.
Maintenance Planning and Scheduling9 References Platt, R. (2019).Stephen Biesty's incredible cross-sections: Dorling Kindersley Ltd. Rigney, M. (2017).In Pursuit of Giants: One Man's Global Search for the Last of the Great Fish: University Press of New England. Thompson, E. (2018).On Her Majesty's Nuclear Service: Casemate. Weber, G., Firouzi, P., Baran, A., Bölke, E., Schrumpf, H., Buren, B., . . . Gerber, P. (2018). GCC PASSED High quality widely use smart USA power strip six outlets-| Wenzhou Safewire Electric Electrical Socket Outlet Factory.European Journal of Medical Research, 23.