Manage ICT Project Closure for NatureCare Products Project
VerifiedAdded on 2023/01/10
|10
|2499
|50
Project
AI Summary
This assignment focuses on the comprehensive process of managing ICT project closure for NatureCare Products. It begins by outlining three project methodologies (Agile, Waterfall, and Kanban) and two ICT process models (RAD and Spiral). The assignment then explores common performance metrics, actions to address outstanding activities, the importance of debriefing with the project team, and stakeholder identification. Task 2 involves practical application, including stakeholder debriefing, team meetings, action plan development, email communications, project performance reporting, and a handover email to the operations manager. The project details include the objective of increasing sales and creating brand awareness through a website and online store. The solution demonstrates the process of identifying and addressing project issues, seeking team updates, and reporting on project performance against outputs, schedule, and budget, culminating in a successful project closure.

Manage ICT Project
Closure
Closure
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Table of Contents.............................................................................................................................2
TASK 1............................................................................................................................................1
1. Three project methodologies...................................................................................................1
2. Description of Two ICT process models and the way in which they are used........................1
3. Three examples of common performance metrices.................................................................1
4. Explanation of the action which will be discovered when reviewing the project
documentation that there were still some activities outstanding.................................................2
5. Explanation of the way in which debriefing with project team can help to dissect problems 2
6. Identification of three stakeholders for debriefing and reason for it.......................................2
7. Explanation of the concept of decommissioning in relation to an ICT project and three ways
in which it can impact the outcomes of a project........................................................................2
8. Identification of two circumstances under which ICT project may need to continue.............2
TASK 2............................................................................................................................................3
Debriefing the stakeholders.........................................................................................................3
Meeting the project team.............................................................................................................3
Action outstanding activities.......................................................................................................4
Sending action plan to the NatureCare products.........................................................................4
Seeking information from team about progress...........................................................................5
Reporting on project performance...............................................................................................5
Debriefing the project team.........................................................................................................6
Sending handover email to operations manager..........................................................................6
REFRENCES...................................................................................................................................8
Table of Contents.............................................................................................................................2
TASK 1............................................................................................................................................1
1. Three project methodologies...................................................................................................1
2. Description of Two ICT process models and the way in which they are used........................1
3. Three examples of common performance metrices.................................................................1
4. Explanation of the action which will be discovered when reviewing the project
documentation that there were still some activities outstanding.................................................2
5. Explanation of the way in which debriefing with project team can help to dissect problems 2
6. Identification of three stakeholders for debriefing and reason for it.......................................2
7. Explanation of the concept of decommissioning in relation to an ICT project and three ways
in which it can impact the outcomes of a project........................................................................2
8. Identification of two circumstances under which ICT project may need to continue.............2
TASK 2............................................................................................................................................3
Debriefing the stakeholders.........................................................................................................3
Meeting the project team.............................................................................................................3
Action outstanding activities.......................................................................................................4
Sending action plan to the NatureCare products.........................................................................4
Seeking information from team about progress...........................................................................5
Reporting on project performance...............................................................................................5
Debriefing the project team.........................................................................................................6
Sending handover email to operations manager..........................................................................6
REFRENCES...................................................................................................................................8

TASK 1
1. Three project methodologies
Agile: It is mainly used for the purpose of developing software solutions and
requirements with the help of collaborative effort of cross functional teams.
Waterfall: This methodology is focused with completing different tasks in well-
structured manner. For this purpose, step by step all the activities are performed under the
project.
Kanban: This methodology is used to manage the product creation which is highly
focused with continuous delivery of tasks (AL NAUIMI, 2018).
2. Description of Two ICT process models and the way in which they are used
There are various types of ICT process models. All of them are as follows and the ways
in which all of them could be used:
RAD model: It is an incremental model and the functions of it are developed in parallel
as it they were mini projects. It is used for different developments such as boxed, delivered and
the assembled in to working prototype.
Spiral Model: This model is a risk driven software development process model. It is
based on the unique risk patterns of the project. While using it different types of process mpdels
could be used. These are incremental, evolutionary etc.
3. Three examples of common performance metrices
Product metrics: These are mainly used for the describing the characteristics of the
product such as size, complexities, performance and quality level.
Process metrics: These are mainly used to improve the software development and
maintenance. The effectiveness of defect removal during development, the patterns of testing
defects arrival etc. are some of the examples of it.
Project metrics: Such types of metrics are used for the purpose of describing the project
characteristics and execution. Some of the examples of it are staffing patterns over the life cycle
of the software, cost, schedule and productivity (Auth, JokischPavel and Dürk, 2019).
1
1. Three project methodologies
Agile: It is mainly used for the purpose of developing software solutions and
requirements with the help of collaborative effort of cross functional teams.
Waterfall: This methodology is focused with completing different tasks in well-
structured manner. For this purpose, step by step all the activities are performed under the
project.
Kanban: This methodology is used to manage the product creation which is highly
focused with continuous delivery of tasks (AL NAUIMI, 2018).
2. Description of Two ICT process models and the way in which they are used
There are various types of ICT process models. All of them are as follows and the ways
in which all of them could be used:
RAD model: It is an incremental model and the functions of it are developed in parallel
as it they were mini projects. It is used for different developments such as boxed, delivered and
the assembled in to working prototype.
Spiral Model: This model is a risk driven software development process model. It is
based on the unique risk patterns of the project. While using it different types of process mpdels
could be used. These are incremental, evolutionary etc.
3. Three examples of common performance metrices
Product metrics: These are mainly used for the describing the characteristics of the
product such as size, complexities, performance and quality level.
Process metrics: These are mainly used to improve the software development and
maintenance. The effectiveness of defect removal during development, the patterns of testing
defects arrival etc. are some of the examples of it.
Project metrics: Such types of metrics are used for the purpose of describing the project
characteristics and execution. Some of the examples of it are staffing patterns over the life cycle
of the software, cost, schedule and productivity (Auth, JokischPavel and Dürk, 2019).
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

4. Explanation of the action which will be discovered when reviewing the project documentation
that there were still some activities outstanding
When it will be identified that some of the activities are outstanding then the project
manager will be required to tale specific actions. These will be making sure that all of them will
be performed properly in upcoming period. Apart from this, the action regarding reason for their
outstanding nature will also be required to be identified.
5. Explanation of the way in which debriefing with project team can help to dissect problems
When the project manager will provide debrief to the project team then it can help to
dissect the problems. When the staff members will be aware of details of project then it will help
to ignore the possibility of errors which may take place in future.
6. Identification of three stakeholders for debriefing and reason for it
The three stakeholders for debriefing are as follows:
Suppliers: Debrief for suppliers is required to make sure that required material for
project is delivered on time.
Board directors: Debriefing for board directors is required because it can help them to
analyse the progress of the project.
Technicians: Debriefing for technicians is required to make sure that all the latest
technologies are used to complete the project successfully (Butt, Naaranoja and Savolainen,
2016).
7. Explanation of the concept of decommissioning in relation to an ICT project and three ways in
which it can impact the outcomes of a project
Decommissioning is the process of withdrawing something from the project. With the
help if it, business application from the organisation could be removed. The ways in which it can
impacts the outcome of the project are as follows:
It can help to remove the business system from the organisation.
With the help of it, server could be repurposed.
Decommissioning can be help to add newly configured server bank in to the system.
8. Identification of two circumstances under which ICT project may need to continue
The circumstances under which ICT project may need to continue. All of them are as
follows:
2
that there were still some activities outstanding
When it will be identified that some of the activities are outstanding then the project
manager will be required to tale specific actions. These will be making sure that all of them will
be performed properly in upcoming period. Apart from this, the action regarding reason for their
outstanding nature will also be required to be identified.
5. Explanation of the way in which debriefing with project team can help to dissect problems
When the project manager will provide debrief to the project team then it can help to
dissect the problems. When the staff members will be aware of details of project then it will help
to ignore the possibility of errors which may take place in future.
6. Identification of three stakeholders for debriefing and reason for it
The three stakeholders for debriefing are as follows:
Suppliers: Debrief for suppliers is required to make sure that required material for
project is delivered on time.
Board directors: Debriefing for board directors is required because it can help them to
analyse the progress of the project.
Technicians: Debriefing for technicians is required to make sure that all the latest
technologies are used to complete the project successfully (Butt, Naaranoja and Savolainen,
2016).
7. Explanation of the concept of decommissioning in relation to an ICT project and three ways in
which it can impact the outcomes of a project
Decommissioning is the process of withdrawing something from the project. With the
help if it, business application from the organisation could be removed. The ways in which it can
impacts the outcome of the project are as follows:
It can help to remove the business system from the organisation.
With the help of it, server could be repurposed.
Decommissioning can be help to add newly configured server bank in to the system.
8. Identification of two circumstances under which ICT project may need to continue
The circumstances under which ICT project may need to continue. All of them are as
follows:
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Lack of communication between the managers and staff members.
Lack of required resources.
TASK 2
Debriefing the stakeholders
Project manager: Hello and Good Morning to all. I am the project manager of Essential
Software working on the project of NatureCare project. I am here to aware all of you about the
project and its progress (Locock, 2018).
Stakeholders: Good Morning. We would like to know brief information of the project.
Project manager: Sure sir. As you all know that the objective of NatureCare products is
to increase its sales in next three years and create brand awareness so for this purpose we have
planned to make the website very attractive. We will be using the main products for showcasing
so that it can attract large number of clients. I have selected some of them and wanted your
approval for the same.
Stakeholders: Which products are selected by you?
Project manager: These are the eco friendly products that are specially made for
women. It will help to spread awareness and attract large number of customers.
Stakeholders: Your idea is great, but we are also making skin care products for men.
Project manager: Yes, I can understand your concern but if the worm will love out=r
products then it will inspire their family members to buy the products (Percudani and Batrawi,
2017).
Stakeholders: Ok, then go ahead and work on the plan and we are expecting positive
results from the plan.
Project manager: Sure sir. Thank you.
Meeting the project team
Project manager: Hello Team. Good morning.
Ian, Dale and Sandy: Good morning.
Project manager: Hope all of you are doing well. I am here to brief you about the
project on which all of us will be working. We will be developing website and online store for
NatureCare Products. The main product which will be showcased by us will be the eco friendly
products that will be sold to the females.
3
Lack of required resources.
TASK 2
Debriefing the stakeholders
Project manager: Hello and Good Morning to all. I am the project manager of Essential
Software working on the project of NatureCare project. I am here to aware all of you about the
project and its progress (Locock, 2018).
Stakeholders: Good Morning. We would like to know brief information of the project.
Project manager: Sure sir. As you all know that the objective of NatureCare products is
to increase its sales in next three years and create brand awareness so for this purpose we have
planned to make the website very attractive. We will be using the main products for showcasing
so that it can attract large number of clients. I have selected some of them and wanted your
approval for the same.
Stakeholders: Which products are selected by you?
Project manager: These are the eco friendly products that are specially made for
women. It will help to spread awareness and attract large number of customers.
Stakeholders: Your idea is great, but we are also making skin care products for men.
Project manager: Yes, I can understand your concern but if the worm will love out=r
products then it will inspire their family members to buy the products (Percudani and Batrawi,
2017).
Stakeholders: Ok, then go ahead and work on the plan and we are expecting positive
results from the plan.
Project manager: Sure sir. Thank you.
Meeting the project team
Project manager: Hello Team. Good morning.
Ian, Dale and Sandy: Good morning.
Project manager: Hope all of you are doing well. I am here to brief you about the
project on which all of us will be working. We will be developing website and online store for
NatureCare Products. The main product which will be showcased by us will be the eco friendly
products that will be sold to the females.
3

Ian, Dale and Sandy: That’s great news.
Project manager: I hope all of you are ready to work on the same.
Ian, Dale and Sandy: Yes, of course.
Project manager: Great, see you soon.
Action outstanding activities
Description of issues Actions required When Who
Identifying best technologies
for website development.
Finding alternatives for the technology
which could be used to develop website.
1st to 3rd
day
Engineers
Arranging funds properly
according to requirements of
activities.
Analysing requirements of all the
activities and then making sure all of
them will be fulfilled with available
resources or not.
4th to 7th
day
Finance
manager
Hiring skilled technicians Using job portals to find right persons for
the job of technicians.
7th to 9th
day
HR
manager
Checking progress of
activities
Analysing success and failure of all the
actions that will be taken to complete the
project.
10th day Junior
manager
Sending action plan to the NatureCare products
Email
To, Casey Harding
(Operations Manager NatureCare Products)
Subject: NatureCare action plan
Hello Mr. Casey,
Greetings for the Day,
I have attached the action plan with this mail please check and let met know if any changes in it
are required.
Thanks, and Regards
Project manager
(Essential Software)
4
Project manager: I hope all of you are ready to work on the same.
Ian, Dale and Sandy: Yes, of course.
Project manager: Great, see you soon.
Action outstanding activities
Description of issues Actions required When Who
Identifying best technologies
for website development.
Finding alternatives for the technology
which could be used to develop website.
1st to 3rd
day
Engineers
Arranging funds properly
according to requirements of
activities.
Analysing requirements of all the
activities and then making sure all of
them will be fulfilled with available
resources or not.
4th to 7th
day
Finance
manager
Hiring skilled technicians Using job portals to find right persons for
the job of technicians.
7th to 9th
day
HR
manager
Checking progress of
activities
Analysing success and failure of all the
actions that will be taken to complete the
project.
10th day Junior
manager
Sending action plan to the NatureCare products
To, Casey Harding
(Operations Manager NatureCare Products)
Subject: NatureCare action plan
Hello Mr. Casey,
Greetings for the Day,
I have attached the action plan with this mail please check and let met know if any changes in it
are required.
Thanks, and Regards
Project manager
(Essential Software)
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Seeking information from team about progress
Email
To, Team members
Subject: Brief status update of action plan
Hello team members,
Hope you all are working properly according to the plan. I wanted to know about the progress of
action plan so I want that all of you should send in brief status update of all the jobs that are
assigned to you. I will be waiting for the updates from your side in next four days (Sabini, Muzio
and Alderman, 2019).
Thanks and Regards
Project manager
(Essential Software)
Reporting on project performance
NatureCare Products
Project Evaluation
Current progress
The project of NatureCare is being progressing positively. It will be completed oj the due
date. All the tasks are performed by the team members properly and they are very much
dedicated for their work.
Performance against outputs
According to the current outputs the performance of project is very good. The website and
online store of NatureCare products will be developed soon as the dedication of tea mates is
very good towards their work. The expected quality of outputs is matched as the engaged
level of all the individuals in the project I very high.
Performance against schedule
The time frame which was decided for all the activities was met by the staff members
5
To, Team members
Subject: Brief status update of action plan
Hello team members,
Hope you all are working properly according to the plan. I wanted to know about the progress of
action plan so I want that all of you should send in brief status update of all the jobs that are
assigned to you. I will be waiting for the updates from your side in next four days (Sabini, Muzio
and Alderman, 2019).
Thanks and Regards
Project manager
(Essential Software)
Reporting on project performance
NatureCare Products
Project Evaluation
Current progress
The project of NatureCare is being progressing positively. It will be completed oj the due
date. All the tasks are performed by the team members properly and they are very much
dedicated for their work.
Performance against outputs
According to the current outputs the performance of project is very good. The website and
online store of NatureCare products will be developed soon as the dedication of tea mates is
very good towards their work. The expected quality of outputs is matched as the engaged
level of all the individuals in the project I very high.
Performance against schedule
The time frame which was decided for all the activities was met by the staff members
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

working in it. By analysing the updates received from team members it has been determined
that schedule which was designed for NatureCare Products was appropriate and it will result
in successful completion of project.
Performance against budget
By analysing progress of the action plan, it has been determined that the budget which was
assigned to all activities was accurate. There will be no requirements of additional funding
in future as the funds were allocated according to the requirements of all the activities.
Actions to be taken
There are various activities are required to be performed till the completion date. The team
members will be required to complete all the tasks according to the specifications, detailed
information of project will be shared to stakeholders etc. If the stakeholders will want any
type of changes in the project then it will also be made before the closure.
Recommendations
According to the progression report the project will be completed on time and the client is
recommended to continue it beyond the set completion date.
Debriefing the project team
Project manager: Hello team, good morning.
Project team: Hello.
Project manager: I am here to debrief all of you about the project, its challenges,
achievements of the team and the lessons learned during the project.
Project team: That’s great. All of us will be very happy to know about that.
Project manager: While working on the project each and every of you performed all the
tasks properly. No challenges were faced by all of us. I am glad that we were able to complete
the project in the predetermined time limit (Varajão and Trigo, 2016).
Project team: That’s great.
Project manager: Yes, and credit of success goes to all of you. See you soon at the
closure date.
Sending handover email to operations manager
Email
6
that schedule which was designed for NatureCare Products was appropriate and it will result
in successful completion of project.
Performance against budget
By analysing progress of the action plan, it has been determined that the budget which was
assigned to all activities was accurate. There will be no requirements of additional funding
in future as the funds were allocated according to the requirements of all the activities.
Actions to be taken
There are various activities are required to be performed till the completion date. The team
members will be required to complete all the tasks according to the specifications, detailed
information of project will be shared to stakeholders etc. If the stakeholders will want any
type of changes in the project then it will also be made before the closure.
Recommendations
According to the progression report the project will be completed on time and the client is
recommended to continue it beyond the set completion date.
Debriefing the project team
Project manager: Hello team, good morning.
Project team: Hello.
Project manager: I am here to debrief all of you about the project, its challenges,
achievements of the team and the lessons learned during the project.
Project team: That’s great. All of us will be very happy to know about that.
Project manager: While working on the project each and every of you performed all the
tasks properly. No challenges were faced by all of us. I am glad that we were able to complete
the project in the predetermined time limit (Varajão and Trigo, 2016).
Project team: That’s great.
Project manager: Yes, and credit of success goes to all of you. See you soon at the
closure date.
Sending handover email to operations manager
6

To, Casey Harding
(Operations Manager NatureCare Products)
Subject: Closure of the project
Hello Mr. Casey,
Greetings for the Day,
I am writing this email you to provide information of various aspects. These are the old website
of NatureCare is decommissioned and the new website and online stores are live Apart from this,
the staff members are trained properly and the due payments are made. The documents related to
the project are being archived and sent to NatureCare Products. As it has been mentioned in the
contractual agreement that we will provide free support till two months so in case of any issue
you can directly contact us. I am seeking for the acceptance of deliverables and confirmation of
the closure.
Thanks, and Regards
Project manager
(Essential Software)
7
(Operations Manager NatureCare Products)
Subject: Closure of the project
Hello Mr. Casey,
Greetings for the Day,
I am writing this email you to provide information of various aspects. These are the old website
of NatureCare is decommissioned and the new website and online stores are live Apart from this,
the staff members are trained properly and the due payments are made. The documents related to
the project are being archived and sent to NatureCare Products. As it has been mentioned in the
contractual agreement that we will provide free support till two months so in case of any issue
you can directly contact us. I am seeking for the acceptance of deliverables and confirmation of
the closure.
Thanks, and Regards
Project manager
(Essential Software)
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

REFRENCES
Books and Journals:
AL NAUIMI, H. K. S., 2018. The Influence of Risks on the Cost Overrun of ICT Network
Projects (Doctoral dissertation, The British University in Dubai (BUiD)).
Auth, G., JokischPavel, O. and Dürk, C., 2019. Revisiting automated project management in the
digital age–a survey of AI approaches. Online Journal of Applied Knowledge
Management (OJAKM). 7(1). pp.27-39.
Butt, A., Naaranoja, M. and Savolainen, J., 2016. Project change stakeholder
communication. International Journal of Project Management. 34(8). pp.1579-1595.
Locock, M., 2018. Lessons learned for managing projects in a Higher Education environment:
organisational and individual experience.
Percudani, P. and Batrawi, M., 2017. The Impact of Internet of Things unification with Project
Management Disciplines in project-based organizations.
Sabini, L., Muzio, D. and Alderman, N., 2019. 25 years of ‘sustainable projects’. What we know
and what the literature says. International Journal of Project Management. 37(6).
pp.820-838.
Varajão, J. and Trigo, A., 2016. Evaluation of IS project success in InfSysMakers: an exploratory
case study. Association for Information Systems.
8
Books and Journals:
AL NAUIMI, H. K. S., 2018. The Influence of Risks on the Cost Overrun of ICT Network
Projects (Doctoral dissertation, The British University in Dubai (BUiD)).
Auth, G., JokischPavel, O. and Dürk, C., 2019. Revisiting automated project management in the
digital age–a survey of AI approaches. Online Journal of Applied Knowledge
Management (OJAKM). 7(1). pp.27-39.
Butt, A., Naaranoja, M. and Savolainen, J., 2016. Project change stakeholder
communication. International Journal of Project Management. 34(8). pp.1579-1595.
Locock, M., 2018. Lessons learned for managing projects in a Higher Education environment:
organisational and individual experience.
Percudani, P. and Batrawi, M., 2017. The Impact of Internet of Things unification with Project
Management Disciplines in project-based organizations.
Sabini, L., Muzio, D. and Alderman, N., 2019. 25 years of ‘sustainable projects’. What we know
and what the literature says. International Journal of Project Management. 37(6).
pp.820-838.
Varajão, J. and Trigo, A., 2016. Evaluation of IS project success in InfSysMakers: an exploratory
case study. Association for Information Systems.
8
1 out of 10
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.