Running head: MANAGE PROJECT COST FOR THE POND'S BRIDGE CONSTRUCTION PROJECT
Manage Project Cost for the Pond's Bridge Construction Project
Name of the Student
Name of the University
Author note
Manage Project Cost for the Pond's Bridge Construction Project_1

MANAGE PROJECT COST FOR THE POND'S BRIDGE CONSTRUCTION PROJECT1
Table of Contents
1. Project Details..............................................................................................................................2
2. Resources.....................................................................................................................................3
3. Cost Monitoring...........................................................................................................................4
Bibliography....................................................................................................................................5
Manage Project Cost for the Pond's Bridge Construction Project_2

MANAGE PROJECT COST FOR THE POND'S BRIDGE CONSTRUCTION PROJECT2
1. Project Details
The poster discusses and summarizes over the entire project based on the construction of
the Ponds Bridge. The project comprises of construction of a four-lane cable-stayed and precast
concrete bridge, which is considered as a part of the new Stanhope Pathway [1]. This bridge is
primarily being constructed for maintaining a proper form of vehicular traffic, better access to
pedestrians and a well-designed cycleway that would link the Stanhope Gardens residential
estate with the Quakers Hill.
The scope of the project details the following:
1. Piling and retaining of concrete walls.
2. Placement of the pre-cast concrete decking.
3. Designing a cantilevered cable-stayed footpath.
4. A pre-cast concrete span girders
5. Approachable railings and slab
From the different specifications made over the construction of Ponds Bridge project, it
can be discussed that the business unit of the project would be discussed as an engineering based
project. Western Earth Moving is considered as the primary client of the Ponds Bridge project
who has proposed the idea of construction of the cable-stayed bridge. The project would start on
November 2009 and the completion date of the project has been marked at November 2010. The
use of lump sum contract has been used for undertaking the activities of procurement of workers
Manage Project Cost for the Pond's Bridge Construction Project_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
POND S BRI D GE CONST RUCT I ON.
|1
|134
|19

Low Carbon Planning for Cost Effective Bridge Design and Development Procedure
|22
|4929
|58

BSBPMG514 Manage Project Cost Assessment Task for BSB51415 Diploma of Project Management
|8
|3012
|125

Effective Mobile Application Development Project Monitoring
|2
|747
|129