COMPETENCYDEMONSTRATION REPORTCareer Episode 1MOHAMMED ALQURAINI
Competency Demonstration Report- Career Episode 1_1
CE 1.1 Project InformationName of the project: Saudi Telecom Company Cell on Wheels ProjectLocation of the project: United Arab EmiratesProject Duration: June -2010 to June -2013Organization: BATCO GroupRole and Designation during the time: Project ManagerCE 1.2 Project BackgroundCE 1.2.1 Characteristics of the projectI was provided with the full ownership of the Saudi Telecom Company`s Cell on WheelSites. When I had first joined the project there was a total of 256 cell on wheels. For the durationof the time I was there in the company I had looked after the installation of 30 new Cell onWheels. A Cell on Wheels is an innovative system developed for the use in areas where theconditions do not match for the installation of full-fledged heighted cell towers. Thus the use ofCell on Wheels helps in the process of installing of new towers for the area. The Cell on Wheelshas a height of working condition of 25 meters which can be installed anywhere in place. A Cellon Wheels is a compact and mobile tower with the addition of indoor working space and a trailerfor the transportation of the mast easily. The whole package comes in a complete solution trailer.The trailer has also been equipped with the ability to self-stacking ability which helps in thefaster transporting breaking down of the whole module.
Competency Demonstration Report- Career Episode 1_2
CE 1.2.2 Objectives developed for the projectFor the project I had developed the objectives which has been listed as follows:To relocate the Cell on Wheels on request.To maintain the operations of the working conditions of the Cell on Wheels. CE 1.2.3 My area of workFor the project I was asked to be ready to dismantle of the Cell on Wheels and transferthem to a new location as per the request of the managers. I was also requested to implementnew designs for the collection and sharing of information through the use of the Cell on Wheels.After the transportation of the towers to the new location I was asked to erect the towers andmake the tower into a full working module. I had also reinstalled all the working modules of thetelecom equipment and to integrate the Cell on Wheels to work on the On Air It procedure. CE 1.2.4 Project GroupFigure 1: The hierarchy of the projectCE 1.2.5 My responsibilities throughout the projectFor the project duration I was in charge of changing the location of the Cell on Wheels toa new location on request from the managers. I had also worked on the different telecom
Competency Demonstration Report- Career Episode 1_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Competency Demonstration Report- Career Episode 2
|8
|1621
|200

Competency Demonstration Report: Development of Security
|8
|1730
|274

Assignment Project Management- Development of CMW
|7
|1770
|186