1PROJECT MANAGEMENT Introduction The following report deals with the West gate tunnel project, which aims to provide a solution to the transport issues affect Melbourne West. This particular project will have both social and economic benefit to Melbourne. The project comes up with a tender design and framework has been given for environmental regulation. The project aims to deliver some benefits to the people of Melbourne. The community will enjoy an improved flow of traffic on the M1 side of the corridor resulting in a reduction of reliance on West Gate Bridge. This has merely expanded the capacity on the west gate freeway and even improved overall connectivity in between the expanding capacity of the central city and western parts of Melbourne. Most of the communities will be benefitted from this less truck traffic on the local roads. Along with this inner west will also be benefitted from the enhanced cycle links and different kind of open spaces. West Gate freeway will receive much greater protection of noise from additional traffic noise reduction measures. Along with this, the operation at the port of Melbourne will also be improved. In the above pages of the report, an analysis has been done regarding the strength and weakness of Westgate Tunnel project. The comparison has been done using best practices of Green Book. All the key assumption with the project has been discussed in details. Strength and Weakness of Westgate Tunnel The five case business model can be defined as the approach for business development, recommended by UK officials. This has been used widely on various government departments and public sector organization within the last ten years. The five case model provides a much discipline and structure approach for approving at the best possible decision. It is not completely suitable for overall judgment and experience. It will be required at different points of the
2PROJECT MANAGEMENT decision-making process. It can be used in a wide range of sectors that are for the capital scheme, which result in something being build and procured. Strength The project aims to produce a huge number of benefits in term of communities for both inner west and outer west. As Green book, as a result of massive public subsidiary most of outer west in particular condemned for long and daily commutes by cars. It will save time around eight minutes on daily basis by the project. As per the Green book, this project will bring huge number of benefits to Transurban. It is a new tunnel involved in designing additional cars to CBD through spencer Street. The extension will considered to be profitable. If approvals are obtained for Transurban for collecting tolls for next 12 years in the year 2047. All the city link will pay much unnecessary road for much longer time. Weakness The project improves access to port which is the key objective of the project but only for trucks. It is only available to Swanston Dock, north of Yarra. As per best practices in Green Book (five case model) fifty per cent of the container moves by using rail but here only nine per cent is seen. West gate tunnel come up with huge number of drawbacks and hazards. It merely focus on the point that there is increase in air and noise pollution for the local residents. It merely result in increase in local and arterial roads being increasing congested by much more number of trucks and more 37,000 cars on daily basis. It merely focus on any kind
3PROJECT MANAGEMENT of public transport improvement and loss of amenity in the present a proposed parks and sport grounds. As per five model, Lifestyle results will have a huge negative impact on health. This is far more expensive in comparison to providing alternatives to public transport. The project aims to improve access to the port which is a plus for the trucks only. In order to make the situation much more badly, it will make the shift to Web Dock on its bay. By the 2050, Swanston Dock will close and second port will be established at the Point Wilson. This is all about connecting some of expensive tunnel to wrong parts of the diminishing public benefit. Fig 1: Five Model Case for Westgate Tunnel Source :
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT MANAGEMENT Key assumption with the project West gate tunnel projects stand out to be bit complex as it requires the understanding of capturing the public attention due to its effect and magnitude on society. Both economy and environment opinion aims to highlight a great amount of uncertainty in the infrastructure development project. A project can be considered to be expected to face disruption in the infrastructure development. The project may face disruption if it has public opposition of the project location and impact on environment. Public opinion aims to represent a much great source of uncertainty in the infrastructure project. Complete state of knowledge for the quantification for likelihood on opposition as a result of project specific which are completely controlled by limited decision-makers. The probability of individuals opposing the project with some similar set of characteristics can be calculated by making use of this model. The specific characteristics of the project will ultimately lead to much higher probabilities for opposition to be found. It merely comprises of some specific probabilities for opposition to be found like Large factor size Lack of experience of organization utility Complete lack of financial support from the government. Front-end project planning can be stated all about shaping the risk profile of project. This is merely all about shaping the risk profile during the execution period and mitigating various kind of risk. It is known to be various kind of risk which are completely inherent to the project and level of freedom which an individual to shape the risk profile. There is huge conflict in between aspiration for limiting the number of volatility of upcoming risk in the project. It is
5PROJECT MANAGEMENT merely needed for maintaining the flexibility within the project. All the given risk can be materialize in the next stages. But, this can result in earlier stages under various responsibilities. In addition, this requires an end to end risk management. It can be applied and developed continuously in the project life of the project. Fortheoverallsuccessofwesttunnelgateproject,publicprocurement,allthe stakeholders need to have value chain of infrastructure project which should be subjected for various private sector risk management. It needs to be contributed for effective implementation of risk management and capabilities in the project lifecycle. There is need for accessing project life cycle which can be powerful way of making it powerful way for making it much more resilient. Social acceptance of this west gate tunnel project stand out to be a key variable in analyzing the protest against infrastructure project. Social mechanism merely highlights the level social acceptance which ultimately lead to mobilization that received much less mobilization. The report merely aims to understand one specific element of mobilization that the social interaction in neighborhood. A list of data has been calculated for participating in the project that is public opposition. Database with addresses of activists aim to build a model for analyzing activism and completely mobilization in the neighborhood. The analysis of project effect characteristics on public opinion does not consider the combined effect of different project characteristics. Instead this merely focus on each of characteristics. Combined effect of project characteristics may result in production of changes toward the project with some specific characteristics. All the event aims to huge impact on the public relation for risk perception for safety and environment. All the issues related to difference in risk management perception are completely related to safety which can be analyzed in details.
6PROJECT MANAGEMENT Critique of Investment Logic Map Conclusion