Contents Introduction.........................................................................................................................................3 Part 1....................................................................................................................................................4 P1Devise clear aims and objectives for your project.....................................................................4 P2Produceaprojectmanagementplanincorporating:costs,scope,time,quality, communication, risk and resources................................................................................................6 P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for completion..................................................................................................................................8 M1 Produce a comprehensive project management plan with clearly planned milestones and a schedule for monitoring and completing the aims and objectives of the project...................11 Part 2..................................................................................................................................................12 P4 Carry out small-scale research by applying qualitative and quantitative research methods appropriate for meeting project aims and objectives..................................................................12 M2 Evaluate the accuracy and reliability of the different research methods you have applied to your project................................................................................................................................16 D1 Critically evaluate the project management process and the research methods used........17 Part 3..................................................................................................................................................18 P5 Analyse your research and data using appropriate tools and techniques............................18 P6 Communicate appropriate recommendations as a result of research and data analysis to draw valid and meaningful conclusions.......................................................................................24 P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and performance.............................................................................................................25 M3 Evaluate your selection of appropriate tools and techniques for accuracy and authenticity to support and justify recommendations.....................................................................................26 M4 Evaluate the value of the project management process and use of qualitative research to meet stated objectives and support own learning and performance..........................................27 D2 Critically evaluate and reflect on the project outcomes, the decision-making process and changes or developments of the initial project management plan to support justification of recommendations and learning during the project.....................................................................28 Conclusion..........................................................................................................................................29 References..........................................................................................................................................30 2
Introduction At the present time to run a business has become very difficult and tough, it is essential for the organization to use the best technique so that the operations and activities can be done appropriately. The essential of managing the organisations and its operation and very necessary. With the help of effective management tool, the company will be able to carry out its function in the desired way. Technology is playing a vital part in the market as many of the operations and activities of the company is performed with the help of latest and emerging technologies (Laudon and Laudon, 2015). Tesco company is one of the largest retail organisation in the Uk market which is performing extremely well. The study will be concerned about the impact of technology on the operations of Tesco organisation. Along with that all that way the company will gather the resources to understand the effectiveness of technology will be discussed here. 3
Part 1 P1Devise clear aims and objectives for your project. Topic:Howdigitaltechnologyhastransformedbusinessactivities,e.g.operations, marketing, accounting, and HR. Background Technology is the element which is getting advanced in the market at the recent time. There is a various organisation which is very effectively using different technologies for its operations and activities. This is assisting the company to carry out the work smoothly and quickly. It is essential for the company to manage its working to meet the market needs. With the help of latest and emerging technologies, the operations and functions of a company will get managed in the required and appropriate way. Aim of the study The aim of the chosen project is to determine the implications of using technology and the transformation that gets done using technologies. Objective To analyse the use of technology in the present era. To determine the way business activities can be transformed. To evaluate the relationship between technologies and business transformation. Research question Q1. What is the use of technology in the market? Q2. What are the related tools and techniques through which the transformation of business can be done? Q3. How is the use of technology linked to the transformation of the business? Significance of study 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
The study is very helpful for the readers as well as the company. The information and data that will get gathered from the study will be assisting in enhancing the skills and knowledge to do market research (McCusker and Gunaydin, 2015). Along with that, the researchers with this study will be getting the opportunity to attain several skills to handle the crucial situations. 5
P2 Produce a project management plan incorporating: costs, scope, time, quality, communication, risk and resources. Project management plan CostTo manage the activities of the business, it is essential for the Tesco organisation to take in consideration about the cost and the financial aspect. This will help the company to carry out the business activities in the required manner (Jaime, et. al., 2016).The budget plan is a very effective aspect of any project so that the managementofworkcanbedone effectively. The set budget for the project of technology is£ 7500 ScopeThe project that company select must vision for the future stability then only the project can be able to get success and long-term sustainabilityinthemarket.The information and the data are being collected by the investigators will be used in The UK market only. TimeThe time is also one of the major factors that are to be taken in focus by the company so that the firm can be able to manage its work on time and in an effective way. The time has to be set then only the worth of the project can be attained. 4 months is the set time for the project (Jaime, et. al., 2016). QualityThe quality of the work is very effective. 6
The project will get success only when the quality of it is very influential. There are many issues and problems that company faces many times due to in an effective quality of the work. Therefore, the quality oftheworkhastobemanaged appropriately. This will assist the company to attract more customers towards the use of its services. CommunicationThe project has various things which have to be shared with the stakeholders for more effectivenessintheselectedproject.the communication is the best way to sustain and to maintain the quality of the work. Therefore,alltheminortothemajor information needs to be shared with the relatedpeopleoftheproject(Rokooei, 2016). RiskUsing technology is very big challenges has the resistance of employees, training and making the workforce work on different technologies are quite difficult. Therefore, the risk factor is always there which need to be managed correctly. ResourcesThere is a high need for resources to make the project and work a successful aspect of the market. Time, cost, human resources, technologies, land and much more are the aspectwhichisrequiredinanyofthe projects. the company has to organise all the resources for attaining effectiveness in 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for completion The project that an organisation selects to make the work more effective and reliable it is very necessary to plan a project’s specification which will be having various information and task which is needed to be performed to obtain project’s success (Nayak, et. al., 2012). It is essential for the company to plan the work break down structure and Gantt chart so that the work can be able to get performed according to the set standards and plan. Work break down structure It is the method which is been used by the management to organise and plan the work of the team in more manageable manner. This is basically the hierarchical form of setting the work and tasks so that the employees and the teammates can be able to carry out the work in proper way. The burden of work can also be able to get reduced and managed appropriately. Source: (Jisc, 2014) Gantt chart 9
This is a graphical presentation of the work which is made horizontally, the lines are drawn which shows the series of work which is to be performed in the certain time period (Schwalbe, 2015). This is very important for the organisation to prepare as this will help in carrying all the activities of the project in a systematic manner. Action plan Task /TimeStart dateEnd dateDuration Selecting the project title4.12.201710.12.20171 week Preparingtheproject’saim and standards 11.12.201717.12.20171 week Performingsecondary researchthroughliterature review 18.12.201731.12.20172 weeks Primaryresearchwith questionnaire survey 1.1.20187.1.20181 week Analysisofcollected information 8.1.201821.1.20182 weeks Statingconclusionand suggestions 22.1.201828.1.20181 week Submission29.1.20184.2.20181 week 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
M1 Produce a comprehensive project management plan with clearly planned milestones and a schedule for monitoring and completing the aims and objectives of the project. The scheduling of the work is well known as a milestone which is very necessary for the organisation to take in consideration while carrying out the project work. Few factors are involved in the milestone of the work such as, determining the incurred time and cost in the project (Pinto, 2015). The necessary required tasks and activities are also analysed while making a milestone. The limitation of the project is also evaluated when preparing the milestone. 12
Part 2 P4 Carry out small-scale research by applying qualitative and quantitative research methodsappropriate for meeting project aims and objectives. Project log book for two weeks Week1 1.1 Update on weekly research/tasks achieved The role of technology in the present market for Tesco company has been understood in the first week. 1.2 Any risks and/or issues identified? Yes, setting the project topic which will help in meeting the needs of the market and the company can be able to get attained. 1.3 Problems Encountered The corporation of the stakeholders were the problems. 1.4 New ideas and change of project direction The new idea was the project may be performed with the assistance of external sources. 1.5 What have I learned about myself this week? I learning that is been done this week is the way project has to get started. 1.6 Tasks Planned for Next Week In the next week, the aim, as well as the standards of the project, will be set. 1.7 Project plan status to date Till the date, project’s topic has been set appropriately. 1.8 Supervisor comments to address The comment stated by advisor was to perform activities of the project in a planned way. 13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Week 2 2.1 Update on weekly research/tasks achieved The aim and objective have been performed effectively. 2.2 Any risks and/or issues identified? Yes, to define the statement for project’s aim is very difficult and critical. 2.3 Problems Encountered Proper plan and ideas were not able to get attained which was one of the biggest issues. 2.4 New ideas and change of project direction The new idea gets generated is that the aim and standards can be met by pre-planning the long-term objectives. 2.5 What have I learned about myself this week? I have learned to be calm and patience as setting standards need lots of hardship. 2.6 Tasks Planned for Next Week The literature study will be performed in the next week. 2.7 Project plan status to date The aim, as well as objectives, have been set to the date. 2.8 Supervisor comments to address The aim has to be obtained so, it is very necessary to stick with the project’s standards. 14
Questionnaire Name: Age: Gender: Q1. Do your organisation uses digital technology? Yes No Q2. Do you agree the organisation growth and use of technology are interlinked with each other? Agree Highly Agree Neutral Disagree Highly Disagree Q3. What is the factor contributing to Tesco company’s development? Resources. Technologies Government Aid Q4. What are the ways Tesco company attaining the efficiency to get developed in the market? Using technologies. Best use of resources Diversifying the customers market. Q5.Howisorganisationhandlingtheissueandproblemsofimplementingthe technologies? 15
Training the employees. Motivating the manpower. Q6. How is the company getting influenced by the use of emerging technology? Positively Negatively 16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
M2 Evaluate the accuracy and reliability of the different research methods you have applied to your project. The research methods that is the qualitative and quantitative method used for the research are very effective and useful as this is helping the company to attain the effective and appropriate result for the set standards. The tools and techniques used by the investigators in this study are more reliable as the data collected through this are very effective. The information can be used for long-term by the company and the researchers (Bernard, 2017). The effectiveness of the entire work can be done with the use of these techniques. The information will be providing the concern and perception of the employees and management that in what manner the company can be able to get growth opportunity. 17
D1 Critically evaluate the project management process and the research methods used. As per Berger (2015), the project management plan is a vital aspect which needed to be taken into consideration by the company so as to carry out the tasks and activities of the project in the required manner. The use of this will help in performing work properly and in the required way. At the same time if it is not used and planned then the company will not be able to perform appropriately and effectively the need to this is very high, not used then management may have to suffer a lot. In accordance to Bryman (2015), the research techniques and procedures are very good for the selected topic. the technology is a wide aspect which is been used by the company, therefore using right tool is a must. The qualitative and quantitative methods are very suitable for the company. Not opting the right tool will influence and affect the entire project of the company and this will affect the growth of the business as well. 18
Part 3 P5 Analyse your research and data using appropriate tools and techniques. Data analysis is very helpful for the organisation so that the data and information can be able to get know what actually the perceptions and beliefs related to subjective aspects. The investigators will be gathering the data from the 30 people randomly by the employees and managers of Tesco company. Below is the analysis of the data that is been gathered from the 30 respondents: - Theme1. The company is using technologies effectively. Frequency 0 5 10 15 20 25 30 26 4 From the graph, it can be analysed that the technology is been used by the company as most of the respondents who are employees and managers of the company stated Yes. There are few who feels that company is not effectively using the technologies in its operations and activities. 19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Theme2 There is a strong relationship between technology and company’s growth. Frequency 0 2 4 6 8 10 12 14 10 12 1 4 3 From the data that is been collected, it has been understood that there is a direct and strong relationship between the growth of the firm and using emerging technologies. It has been analysed from the views of respondents that using the digital technologies has helped the organisation to perform effectively and it has helped in attaining growth in the market. 20
Theme3 Technology is the factor assisting company to grow. Frequency 0 2 4 6 8 10 12 14 16 8 15 7 The graph presents that there are various factors which are helping the company to carry out its activities in an effective way and through that, it can attain growth. Technologies, resources, and the help of government are the factors aiding to grow but among all, technologies are playing a vital role. 21
Theme4. Technology is being used by a company to improve its efficiency. Frequency 0 2 4 6 8 10 12 14 16 18 20 18 8 4 It is very important for an organisation to use the best tool to improvise the efficiency and effectiveness. There are numerous options that Tesco company can use, as according to the respondent review, technology is essential part used to enhance the efficiency of the company. 22
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Theme5 Training and motivation tools used to manage issues. Frequency 0 2 4 6 8 10 12 14 16 18 20 18 12 There are various issues and problems that are bee faced by the company while implementing the emerging digital technologies. from the gathered data it has been analysed that the resistance of employees is the biggest problem, which is managed by a company with the help of training and motivation program. 23
Theme6. The influence of technology is very positive for the company. Frequency 0 5 10 15 20 25 20 10 It is very important to understand the implication of introducing the digital technology in the company. This will help in performing and making a decision as per the needs. From the analysis, it has been understood that the impact of using technology is very effective and positive, as a large number of respondents favoured for this. 24
P6 Communicate appropriate recommendationsas a result of research and data analysis to draw valid and meaningful conclusions. The data and information that has been gathered from this particular study it has been analysed that there is an importance of technology in the market. The technology is very important for the company but making it effectively used by the employees it is very vital for the organisation to manage its several activities. There are some suggestions that are needed to be managed and understood by the company to overcome several issues and problems. They are as below- 1.The technology that is to be implemented or has been already introduced in the company has to be effectively communicated with the related people so that the decision and choices can be able to make in a consenting manner. It is must to do proper communication to resolve the issues and problems. 2.The training and development program is another very essential things that are to be organised by the company so that the workforce if the firm can be able to get the knowledge and skills to handle and use technologies. It is essential for the company to make the employees feel comfortable so that they can contribute effectively. 3.The leadership approach can also be utilised so that the issues that many times company faces can get reduced and managed effectively. this will help in motivating the employees who are not taking interest in working with the company due to the use of technologies. 4.The resources that are required for the project has to be very well organised and must be used in an appropriate way. this will help the company to control unnecessary wastage and the cost can also be controlled appropriately. 25
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and performance. The research that has been carried out with the help of effective research tools has helped in attaining various required data and information. The aims and standards that are been set by the researchers for the project are able to get effectively obtained with the help of the performed study. While carrying out the study I came to know that it is not easy to implement the technologies in the company. There are numerous issues and a problem that is been faced by the company as the employees and the stakeholders are not initially give their consents for the project. I have also come to know that changes everywhere will not be accepted for the first time, it needs lots of effort to make the people know the importance and value of implementing any new thing. I myself came to know the importance of using the latest technology as this will help in making the work easy and its tasks will get completed on the set time. The standards that have been set for the project is also able to get accomplished appropriately with the help of technologies. I understood that there are positive as well as negative impact of the use of technology has at one side operations and activities are getting performed appropriately, but at the same time, the employees resist to the changes. At the end, there is a great growth opportunity that company would be attaining. 26
M3 Evaluate your selection of appropriate tools and techniques for accuracy and authenticity to support and justify recommendations. The recommendation that has been provided with the assistance of the strategies and tools like qualitative and quantitative methods. The accumulation of the data and information in the best manner has been able to do with the assistance of the selected techniques. Using this the appropriate recommendation and suggestions have been drawn (Bryman and Bell, 2015). It is essential to gather the data appropriately and using this method the right sources can be attained. The accuracy and authenticity were able to get obtain appropriately and in the desired manner to get growth and developing opportunity in the market. 27
M4 Evaluate the value of the project management process and use of qualitative research to meet stated objectives and support own learning and performance The project management process is very necessary to attain the standards and aims of the project. If it is prepared in an effective manner then the objective will be get attained appropriately. The work of the company will also be done effectively, this has been done with the help of effective tools and techniques of research (Csikszentmihalyi and Larson, 2014). If the process management plan is not used and implemented then the company will have to face several issues and problems. Also, the company will have to suffer from various problems. 28
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
D2 Critically evaluate and reflect on the project outcomes, the decision-making process and changesor developments of the initialproject management planto support justification of recommendations and learning during the project. According toMartinelli, et. al. (2016), the companies are getting growth opportunity in the competitive world if it uses effective technologies. Though the project of the company is very effective where the technologies are being used but still it is very necessary for the organisation to take in consideration about several aspects. The process management process and research techniques are very necessary to use effectively this will help in making needed changes and decision. There are various things that have been gathered and accumulated with the help of this technique. The recommendation and suggestions have also been made in this study which is very useful for a company to overcome any possible issues and problems. 29
Conclusion From the above discussion, it can be concluded that the use of technology by Tesco company will help it to carry out its operations and functions in a managed and systematic manner. from the study, it has been determined that every organisation as to sustain in the competitive world, the need for management is much required. The research has focused on several activities which are needed to be managed so that the project can be able to attain the sustainabilityandaimsandstandardscanbeobtained.Forgatheringresourcesand information through which the project can be managed the researchers has carried out primary and secondary research. The decision of work and the management of the activities are done with the help of WBS and Gantt Chart. The data has been analysed with the help of qualitativemethodandsomesuggestionsandrecommendationshavebeendrawnfor assisting a company to get growth in the market. 30
References 1.Berger, A.A., 2015.Media and communication research methods: An introduction to qualitative and quantitative approaches. Sage Publications. 2.Bernard, H.R., 2017.Research methods in anthropology: Qualitative and quantitative approaches. Rowman & Littlefield. 3.Bryman, A. and Bell, E., 2015.Business research methods. Oxford University Press, USA. 4.Bryman, A., 2015.Social research methods. Oxford university press. 5.Csikszentmihalyi, M. and Larson, R., 2014. Validity and reliability of the experience- samplingmethod.InFlowandthefoundationsofpositivepsychology(pp.35-54). Springer Netherlands. 6.Jaime, A., Blanco, J.M., Domínguez, C., Sánchez, A., Heras, J. and Usandizaga, I., 2016. Spiral and project-based learning with peer assessment in a computer science project management course.Journal of Science Education and Technology,25(3), pp.439-449. 7.Jisc,2014.Productbasedplanning.[Online].Jisc.Availableat: https://www.jisc.ac.uk/guides/project-management/product-based-planning.[Accessed: 5thFebruary 2018]. 8.Laudon, K.C. and Laudon, J.P., 2015.Management Information Systems: Managing the Digital Firm Plus MyMISLab with Pearson eText--Access Card Package. Prentice Hall Press. 9.Martinelli,R.J.&Milosevic,D.Z.,2016.Projectmanagementtoolbox:toolsand techniques for the practicing project manager.John Wiley & Sons. 10.McCusker, K. and Gunaydin, S., 2015. Research using qualitative, quantitative or mixed methods and choice based on the research.Perfusion,30(7), pp.537-542. 11.Nayak, D., Malla, S.K. and Debadarshini, D., 2012. Improved round robin scheduling using dynamic time quantum.International Journal of Computer Applications (0975– 8887) Volume. 12.Pinto, J.K., 2015.Project management: achieving competitive advantage. Prentice Hall. 13.Rokooei, S., 2016.Project managementeducation research excellencewithin cyber infrastructure environment. The University of Nebraska-Lincoln. 14.Schwalbe, K., 2015.Information technology project management. Cengage Learning. 31