This document is an online exam for operations management. It includes sections on critical path, risk mitigation, sunk cost, work repetition, and more. It also covers the four Vs of operations management: volume, variety, variation, and visibility. The document provides answers and explanations for each question.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Online exam
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Section A QuestionOption 1Activity on critical path 2A husband preparing a special dinner for his wife. 3Risk mitigation 4Sunk cost 5 613 7 8Work can be repetitive 9Lowervisibilityislinkedto lower cost per unit 10 11Chase management plan 12All answers are right 13London Tube 14 15 Section B Question 1 (1) How long the project will take until completion: Number of days: 15/12*30 = 37.5 days 2. How much it will cost: = 14500/12*30
= 36250 Question 2 (a) Number of markers needed: Work content/cycle time = 230/46 = 5 Markers (b) Through Put efficiency: Through put time: WIP*Cycle time = 230*46 = 10580 Through Put efficiency: Work content/ Through put time*100 = 230/10580*100 = 2.17% Section C Question 1 In the operations management four Vs Are Volume, variety, variation and visibility. Basically in the operations one thing is equal which is that they all take their inputs such as raw material, capital and equipment etc. Below comparison of a fine dining restaurant and Mc Donald has been done by using 4Vs in such manner: BasisFine dining restaurantMc Donald VolumeInthisorganizationvolumeof operations is less. On the other side, in this volume of operations are more. VarietyThis entity surely have more number of varieties of products. While Mc Donald has a limited variety of food stuff. VariationUnder this variation of activities is less. On the other side, in this variation of activities is more. VisibilityThe visibility of this restaurant isWhile Mc Donald has higher visibility
less due to lack of popularity.due to worldwide popularity. Question 2 It is essential to manage different kinds of project in a systematic manner so that project can be completed in an effective manner. Below key stages are explained with rationale to a University graduation ceremony: Initiation: This is the first stage in which project’s goals and objectives are determined. Such as in the aspect of above University graduation ceremony, first of key goal and feasibility will be tested as well as outlines will be determined. Planning- It is the second stage in which plan of project is determined including each activity. Like in above project this will be done by making plan of each aspect such as number of guests, students as well as estimated budget etc. Execution: This is the third step in which above mentioned planned are executed by a suitable framework. In the context of above project, managers will have to execute all the plans which they made in above stage. Like welcome of guests, food facility and many more. Closure- This is the last stage in which project is finished as well as evaluation of project is also done in order to determine whether project achieved its goals or not. In the context of above project this will be done by taking feedback from students about facilities during ceremony.