This study analyzes the project management of aMedia, a popular television series producer. It explores the work breakdown structure, Gantt chart, network diagram, critical path, and the significance of WBS and Gantt chart in project management. The study also discusses the importance of CPM in project risk management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Managing project at AMEDIA Page1of10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents Introduction................................................................................................................................4 Work Breakdown Structure........................................................................................................5 Gantt Chart.................................................................................................................................5 Significance of WBS and Gantt Chart.......................................................................................6 Network Diagram.......................................................................................................................7 Critical Path and Measures.........................................................................................................7 The significance of CPM in Project Risk Management:............................................................8 Conclusion..................................................................................................................................8 References................................................................................................................................10 Page2of10
List of Figures Figure 1: “Demonstrating the WBS for the project at aMedia”.................................................5 Figure 2: “Analysis of Gantt Chart for the project at aMedia”..................................................6 Figure 3: “Illustrating the network diagram for the project at aMedia”....................................7 Table 1: “The critical path for the project at aMedia”...............................................................7 Figure 4: “The steps of critical path for the project at aMedia”.................................................8 Page3of10
List of Tables Table 1: “The critical path for the project at aMedia”...............................................................7 Page4of10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Introduction The aMediais one of the popular producers of television series. It was found in 2002. They won various awards of Russian Broadcasting Academy. However, the company has been facing manual data entry processes that are time- consuming. The documents are to be accessed that has been limited and slow. Further, the scriptwriters have been facing barriers in collaborating. They have been urgently needing the multimedia system of content management. In the following study, the case of project management ofaMediais analysed. Work Breakdown Structure Figure 1: “Demonstrating the WBS for the project at aMedia” (Source: Created by Author) Asper thePMBOK knowledge areas, the WBSis createdby deliveringthe visual representation of every part of the project of aMedia. It is determined through analysing the Page5of10
constant view for team members and management. This is about the compete for the progress of the project. Further, measurable and specific results are defined (Archibald & Archibald, 2016). Then the tasks are broken into various manageable chunks. Next, they have been providing the method to make repeatable and successful experiences. Further, they have been setting the foundation to estimate the expenses and allocate resources and human beings. Gantt Chart It is done by adding the starting dates and durations. Next, the descriptions are added to the Gantt Chart. Figure 2: “Analysis of Gantt Chart for the project at aMedia” (Source: Created by Author) Significance of WBS and Gantt Chart The WBS is meant to decrease the complex tasks. It is helpful for the project managers in overseeing the activities more efficiently than complicated ones. Apart from this, the Gantt Chart is helpful to schedule and plan the projects. It is useful to analyse the duration of the project, find out the needed resources and planning to finish the tasks (Kaiser, El Arbi & Ahlemann, 2015). Page6of10
Network Diagram Figure 3: “Illustrating the network diagram for the project at aMedia” (Source: Created by Author) Critical Path and Measures Task NameDurationStartFinishPredecessors Initiation of the project of aMedia4 daysMon 4/1/19Thu 4/4/19 Planning of the project5 daysFri 4/5/19Thu 4/11/191 Executing the project2 daysFri 4/12/19Mon 4/15/192 Controlling and monitoring the project6 daysTue 4/16/19Tue 4/23/193 Project closure2 daysWed 4/24/19Thu 4/25/194 Table 1: “The critical path for the project at aMedia” (Source: Created by Author) Page7of10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Initiation of the project of aMedia Planning of the project Executing the project Project clousre Figure 4: “The steps of critical path for the project at aMedia” (Source: Created by Author) The critical paths can be determined through specifying all the activities. They also involve the establishment of the activity sequences and dependencies. Further, the network diagram is drawn and the completion time is estimated (Bi et al., 2017). After that, the critical path is identified and it is updated through the critical path diagram process. The significance of CPM in Project Risk Management: For understanding the project case ofaMedia, the schedule is structured well. They have been providing the related detail levels and comprising of the logic that is free-flowing. Here, the dates of completion have been driven through realistic estimations and never through political and management considerations (Lock, 2017). Here, the scheduled timeline for the project has been reflecting the durations of activities and various sequences. They have possessed the emphasis on the completion time of the critical path. Thus through evaluating the schedule of CPM, the model for the aMedia can be developed for the actual risks exposures. This can be done by developing the plan of acceleration. This is helpful to move the activities of the projects nearer towards the achievement of the goals (Joslin & Müller, 2015). Conclusion The aMedia is one of the biggest film studio situated in Russia. The series has been regularly attracting about 6 million viewers. Their programming is found to be sold to over 25 nations. The project management is vital for aMedia for governing their present project. The study Page8of10
analyses various elements that are needed to be known by the team leaders. The processes of risk management, project lifecycles and the strategies are useful for the project to become successful. Apart from this, implementing a suitable tool for the estimation of the duration is helpful to reach the project goal. Besides, the project of the team requires to consider the time the project has been seeming to gain the aim. Thus they can know when to stop prior they can go beyond the estimated budget. Page9of10
References Archibald, R. D., & Archibald, S. (2016).Leading and Managing Innovation: What Every Executive Team Must Know about Project, Program, and Portfolio Management. Auerbach Publications. Bi, H. L., Jia, X., Lu, F. Q., & Huang, M. (2017). Schedule risk management of it outsourcingprojectusingnegotiationmechanism.InProceedingsofthe23rd International Conference on Industrial Engineering and Engineering Management 2016(pp. 29-33). Atlantis Press, Paris. Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and project success in different project governance contexts.International Journal of Project Management,33(6), 1377-1392. Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment. International Journal of Project Management,33(1), 126-139. Lock, D. (2017).The essentials of project management. Routledge. Page10of10